Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

24-17.3

Active
49502State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Piqua, Ohio, is soliciting bids for Project 24-17.3, the construction of the Drake Road Water Booster Pumping Station. This project involves the creation of a 6 MGD water booster pumping station designed to supply the City's Western Pressure Zone. The facility will be a single-story masonry structure built on a poured concrete foundation, with additional site improvements including approximately 400 linear feet of station suction and discharge piping. The scope of work is comprehensive, covering mechanical, HVAC, electrical, and process integration, including the installation of conductors, panelboards, engine generators, and various piping systems. The engineer's estimate for the project is 6,144,108 dollars, and bids must be submitted as a single lump sum. The contract requires strict adherence to State of Ohio Prevailing Wages and the 2010 Americans with Disabilities Act Standards for Accessible Design. Bidders must provide a qualification statement, project references, and a bid guaranty bond, as well as certify compliance with drug-free workplace and non-discrimination laws. The project includes specific cash allowances totaling 185,000 dollars for system integration, electrical and gas improvements, and special inspection and testing services. Performance and payment bonds are required upon contract award. The substantial completion date for the project is September 30, 2028, with final payment readiness expected by October 31, 2028.

General Info

City of Piqua bids for Drake Road Water Booster Pumping Station construction project.

Documents

10

City of Piqua - Drake Road Water Booster Pumping Station (Project #24-17.3)

PDF, High priority: read this firstspecifications
High

City of Piqua - Drake Road Water Booster Pumping Station (Project #24-17.3) ITB Letter

PDF, High priority: read this firstitb
High

City of Piqua - Drake Road Water Booster Pumping Station Project Manual

PDF, High priority: read this firstrfb
High

Payroll Submittals and Wage Determination Document

PDF, High priority: read this first4 pages · wage-determination
High

Prevailing Wage Guide for Contractors

PDF, High priority: read this firstwage-determination
High

Prevailing Wages - 10/8/2026

PDF, High priority: read this firstwage-determination
High

Americans with Disabilities Act Compliance Certification

PDF, Low prioritycertification
Low

City of Piqua Bid Guaranty Bond

PDF, Low prioritybid-bond
Low

City of Piqua, Ohio - Contractor's Qualification Statement

PDF, Low prioritypast-performance
Low

Drug Free Workplace Compliance Affidavit Form

PDF, Low prioritycompliance-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Nov 9, 2026 to Nov 19, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City of Piqua
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City of Piqua
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
CITY OF PIQUA OHIO - Drake Road Water Booster Pumping Station - Project #24-17.3
ENGINEER’S ESTIMATE: $6,144,108
In general, the work consists of the construction of a 6 MGD water booster pumping station to supply water to the City's Western Pressure Zone. The pumping station will be a single-story masonry structure on a poured concrete foundation. Incidental to the project will be site improvements including approximately 400 LF station suction and discharge piping.
Project is bid as one lump sum total.
State of Ohio Prevailing Wages are required.
The final completion date is September 30, 2028.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 4 hours ago

DEADLINE

in about 21 hours
View Details

More opportunities from Ohio → City of Piqua

Same awarding agency

NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and transformer structures. Additional requirements encompass the installation of grounding systems, above-ground conduits, and comprehensive site work including excavation, structural fill, grading, and site restoration. The project must adhere to strict technical standards, including NESC, NEC, IEEE, and ANSI, and requires compliance with Ohio State Prevailing Wage laws and the Americans with Disabilities Act. Bids are due by October 29, 2026, and must be submitted in duplicate. Award selection will be based on a comparison of relative merits and the lowest and best bid. Successful bidders must provide a bid bond of no less than 10%, as well as performance and payment bonds equal to the contract price. The contract also mandates a Drug Free Workplace Compliance Affidavit and requires contractors to assist the owner during the start-up and commissioning of all systems. Performance is subject to a penalty of $500 per calendar day for deliveries exceeding the designated completion date. All equipment must be delivered F.O.B. to the job site in undamaged condition with detailed packing lists.
Power and Communication Line and Related Structures Construction

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 238110
SLED
24-17.12
Solicitation # 24-17.12
The City of Piqua, Ohio, is soliciting bids for project 24-17.12, which involves the construction of cast-in-place drilled pier foundations for transmission line structures as part of the Washington/Farrington Road T-Line project. The scope of work includes furnishing all labor, materials, and equipment to install seven drilled pier foundations for self-supporting steel poles, consisting of five 70-foot, one 71-foot, and one 80-foot pier. The engineer's estimate for this work is $280,000. Bids are due by 1:00 PM on October 19, 2026, and must be submitted in duplicate using the provided printed forms. The award will be based on the lowest and best bid, considering price, relative merits, and the qualifications of the bidder and their subcontractors. Contractors must comply with State of Ohio Prevailing Wage laws and provide a bid bond for 10 percent of the total bid amount. Upon award, the successful contractor must furnish performance and payment bonds equal to the contract price and provide evidence of insurance naming the City as an additional insured. The project is governed by EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Key technical requirements include strict adherence to concrete strength and placement tolerances, with structures prohibited from erection until piers reach 75 percent of their design compressive strength. Performance penalties of $500 per calendar day apply for delays beyond the certified delivery date. Payment is processed monthly, with 90 percent of equipment costs due upon delivery and the final 10 percent due upon system acceptance and energization.
Poured Concrete Foundation and Structure Contractors

POSTED

8 days ago

DEADLINE

in 1 day
View Details
NAICS: 332312
SLED
24-17.9C
Solicitation # 24-17.9C
Project 24-17.9C is a solicitation issued by the City of Piqua, Ohio, for the fabrication and furnishing of steel structures for the 69kV The Site Substation and the Washington Road 69kV Transmission Line. With an engineer's estimate of $680,000, the scope of work includes the delivery of a complete and operable system featuring various components such as deadend H-frame structures, Vee switch structures, bus supports, metering structures, and several self-supporting steel poles ranging from 50 to 80 feet. All work must adhere to the National Electric Safety Code and specific technical load requirements for vertical, transverse, and longitudinal forces. Bidders must be actively engaged in the fabrication of such items and provide evidence of financial and performance capabilities. Submission requirements include a bid bond of 10 percent of the total bid amount, a contractor's qualification statement, and certifications for ADA and Drug Free Workplace compliance. The successful contractor will be required to post a performance-payment bond for 100 percent of the contract value. Deliveries must be made to the job site, with structural steel shipped in a single lot or within 24 hours, and a penalty of $500 per calendar day applied for late deliveries. Quality assurance involves manufacturer testing of bolts and certified welding inspections per AWS QC1 standards.
Fabricated Structural Metal Manufacturing

POSTED

8 days ago

DEADLINE

in about 12 hours
View Details
NAICS: 335314
SLED
24-17.9A
Solicitation # 24-17.9A
Project 24-17.9A is a solicitation by the City of Piqua, Ohio, for the design, fabrication, testing, and delivery of critical infrastructure for the 69/12.47 kV Site Substation. The scope of work is divided into two primary bid items: a prefabricated modular steel or concrete control building measuring 25'-4" x 14'-6", and four complete control and relaying panels, consisting of three protective relay panels and one communications panel. The engineer's estimate for the project is $425,000. Bids are due by October 28, 2026, and may be awarded as a single package or split between a control house supplier and a relay panel supplier. The contract requires a bid bond of 10% of the total bid amount and a performance-payment bond for 100% of the awarded contract value upon success. Payment is structured with 90% due upon undamaged delivery to the job site and the remaining 10% payable upon satisfactory energizing and system acceptance. Delivery must be made via open-top conveyances, as the owner cannot unload enclosed trailers. Performance is subject to a penalty of $500 per calendar day for delays beyond the certified delivery date. Technical compliance is governed by IEEE C37.90 and NESC National Electric Safety Code standards, with mandatory Factory Acceptance Testing (FAT) including point-to-point wiring verification and functional logic tests. Bidders must provide a Contractor's Qualification Statement, ADA compliance certification, and a Drug Free Workplace Compliance Affidavit. Additionally, the contract is subject to prevailing wage stipulations and requires strict adherence to the owner's drafting and labeling conventions for all wiring and terminal blocks.
Relay and Industrial Control Manufacturing

POSTED

9 days ago

DEADLINE

in about 14 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS