Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

24322309 EXWC - NRDE RENOVATE DIVE TANK AT PH1100

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac SouthwestView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Southwest
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
PW WIB FORM 1. WORK LOCATION BASE: Port Hueneme BUILDING NO.: 1100 ROOM NO.: Dive Tank PARENT WORK ORDER NUMBER: N/A 2. COMMAND NAME (THAT IS USED IN MAXIMO): 3. PROJECT TITLE: RENOVATE DIVE TANK at PH1100 4. IMPACT: Increase mission efficiency for the dive tank at NAVFAC EXWC 5. DETAIL DESCRIPTION OF WORK: The Contractor shall provide all labor, materials, tools, transportation, equipment, management, supervision, and minor incidental engineering necessary to perform the following: A. Dive Tank: • Drain Dive Tank • Clean Dive Tank and Prepare to be painted • Prep & Paint Dive Tank • Inspect View Ports and Fix If Needed • Remove Deteriorated Rubber Step Caps and Repair • Remove Unused Broken Pipe Section Inside Tank • Refill tank with Sea Water B. Wood Deck & Staircase: • Sand Approx. 1,000 square feet of all exposed dive tank wood decking, railing, and access stairway to remove existing loose paint. • Repair Rotted Support Beams • Provide Three-Coat Paint System Including Staircase • Provide Anti Slip on all Stair Treads • Remove and replace complete handrail system to meet the proper safety requirements. C. Plumbing: • Purchase and Install New Filter Pump/Motor • Replace all Pump/Motor Piping • Purchase and install all new Control Valves • Purchase and install new Sand Filters, Back Flush Valves and all related Piping. • Replace all Main shut-off Ball Valves D. Electrical: • Disconnect all Pumps/Motors to be Replaced • Reconnect all Pumps/Motors Once Replaced • Repair nonworking 110v Power Outlets on Deck • Test and replace as needed, all Motor control wiring, Conduit, Breakers, Switches, Relays, and Timers 6. ROUGH COST ESTIMATE: 7. PROVIDE AS ... NOTE: description has been truncated, please see Project Note for full description.

More opportunities from Department Of The Navy → Navfac Southwest

Same awarding agency