Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

27-350SOS-PHYSE-B-54368 | Change Order - Carrier HVAC Maintenance

Active
27-350SOS-PHYSE-B-54368State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation, identified as 27-350SOS-PHYSE-B-54368, concerns a change order for Carrier HVAC maintenance services. The project is managed by the Physical Services agency within the state of Illinois, with the primary point of contact being Purchaser Katie Speck. The work is designated to be performed in Springfield, Illinois, 62707. The solicitation was officially posted on October 1, 2026, and is categorized as a SLED organization procurement.

General Info

Change order for Carrier HVAC maintenance services in Springfield, Illinois for Physical Services.

Place of Performance

3701 Winchester Road, Springfield, IL, 62707, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Physical Services
Contacts1 person available
OfficeSpringfield, IL, 62707, USA
Organization / AgencyIllinois → Physical Services
Office AddressSpringfield, IL, 62707, USA
Contacts
Katie SpeckPurchaser

Full Description

Show more
Change Order - Carrier HVAC Maintenance

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a multi-building plumbing leak repair subcontracting project at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Harris Hall Dormitory, as well as heat pipe section replacements in King Hall and the Administration Building. All work must be performed using new, commercial-quality materials that comply with ASTM, ASME, and Massachusetts State Plumbing Codes. Contractors are required to perform hydrostatic or operational leak testing and provide a signed punch list and warranty upon completion. The project is set aside for various small business categories, including woman-owned, veteran-owned, and HUBZone certified firms. Interested bidders must submit a completed bid sheet with a detailed cost breakdown, a proposed service schedule, and proof of Massachusetts licensing and credentials. Required documentation includes a W-9, SAM.gov UEI number, active registration confirmation, certificates of insurance, and a signed Vendor Acknowledgement form. Bids must be submitted by October 30, 2026, and must remain valid for at least 60 days. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. The contract incorporates several federal regulations, including the Davis-Bacon Act and Service Contract Act for prevailing wages, as well as specific bonding requirements for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning (HVAC) services at the Miami Job Corps Center in Miami, Florida. The contract period runs from November 1, 2026, through October 31, 2027. The selected contractor will be responsible for emergency HVAC repairs, with a required pricing breakdown for non-emergency daytime services (8:00 am to 4:30 pm) as well as emergency, weekend, and holiday rates. Bids must be submitted on company letterhead by October 23, 2026, and must remain valid for 90 days. Award selection is based on the most responsible bidder, considering cost, licensure, experience, and insurance capabilities. Mandatory requirements for all vendors include a valid Unique Entity ID (UEI) and active registration in SAM.gov. Contractors must hold all necessary business and employee licenses for the State of Florida and maintain comprehensive insurance, including Workers Compensation, Automobile Liability, and Comprehensive General Liability of at least $1,000,000 per occurrence. The contract is subject to Service Contract Act regulations, specifically Wage Determination No. 2005-2248, and Executive Order 13658 regarding minimum wage. Additional compliance measures include strict security protocols, a prohibition on fraternization with students, and the submission of payroll documentation for any service incident exceeding $2,500. Payment terms are NET 30 days from the date of invoice.
Miami Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontracting opportunity to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing equipment and the installation of a new 5-ton condenser with a suitable pad, a new fused electrical disconnect and whip, and a new condensate drain line. The contractor is responsible for providing all labor, materials, and equipment, ensuring the system is fully operational and charged with manufacturer-specified refrigerant. Key deliverables include two sets of operation and maintenance manuals and comprehensive manufacturer and installer warranties. This small business set-aside opportunity, under NAICS 238220, has an estimated price range of 0 to 25,000 dollars. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid consideration. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent is required, and the awarded contractor must provide performance and payment bonds equal to 100 percent of the contract price from a surety with at least an A- rating. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wage rates, OSHA safety standards for personal protective equipment, and various Federal Acquisition Regulations. Specifically, contractors must submit weekly certified payroll and complete SF 1413. Payment applications must be submitted to the procurement department using AIA Document G702 or an equivalent form, supported by a schedule of values via AIA Document G703. Final acceptance of the project is subject to inspection and approval by the San Diego Job Corps Center Facilities and Maintenance Department.
San Diego Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The project scope involves inspecting, repairing, and replacing components for exhaust fans one through eight, specifically addressing failed louver actuators, blown fuses, shorted contactor coils, and missing motors, blades, or guards. Additionally, contractors must provide separate pricing for the system-wide replacement of thermostats, relays, and actuators, as well as any recommended repairs not included in the base bid. The contract will be awarded to the responsible offeror who is technically acceptable and provides the lowest price. Compliance requirements are stringent, requiring contractors to be registered and licensed in the State of Kentucky and verified through the SAM portal. All work must adhere to the Davis-Bacon Act and FAR 22.403-1 labor standards, with weekly certified payroll and signed statements of compliance required for invoice acceptance. Per the Miller Act, payment bonds are required for contracts exceeding 100,000 dollars, and all contractors must prove their ability to secure performance and payment bonding. Safety and environmental regulations, including OSHA and EPA standards, apply, with a requirement to maintain Material Safety Data Sheets and chemical application logs. Quotes must be submitted electronically to mjccpurchasing@insightsllc.net by October 30, 2026, at 5:00pm.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238220
New
Furnace Replacement
Solicitation # 26-17
Management and Training Corporation (MTC) is soliciting bids for a fixed-price, lump sum contract to remove and replace furnaces and thermostats in three staff houses at the Tongue Point Job Corps Center in Astoria, Oregon. The project covers Quarters F (3,786 sq/ft, propane), Quarters P (1,100 sq/ft, natural gas), and Quarters Q (2,280 sq/ft, propane). Required equipment must be Carrier Comfort Series or an equivalent good grade with at least a 96 percent efficiency rating, sized at approximately 80,000 btu. Mandatory warranties include a lifetime warranty on the heat exchanger and a minimum 10-year warranty on parts. The estimated price range for the project is between 0 and 25,000 dollars. Bids are due by 2:00 PM PST on October 21, 2026, and must be submitted via email to Elizabeth Williamson. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and a completed supplier packet including a W-9 and business self-certification. Award decisions will be based on overall best value. Contractors must adhere to the Davis-Bacon Act prevailing wage rates for building construction in Oregon and submit certified payroll weekly. Performance and payment bonds, as well as a 20 percent bid bond, are only required if the base bid is 25,000 dollars or greater. Final payment is contingent upon a successful final inspection and the approval of all required documentation.
Tongue Point Job Corps

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of existing failing air compressors and dry system distribution piping networks in Building CM (Men's Dormitory), Building CW (Women's Dormitory), and Building D (Recreation). The contractor is required to supply and install a new fire sprinkler piping network and a code-approved air compressor sized according to NFPA standards. All work must be completed within 30 consecutive business days following a written Notice to Proceed and must adhere to NFPA 25 (2023 Edition) and all applicable local, state, and national codes. Bids are due by December 1, 2026, and will be evaluated based on overall best value. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids totaling $25,000 or more, a bid bond guarantee of 20% of the base bid is required at the time of submission, and performance and payment bonds must be provided within five business days of an Intent to Award Letter. The solicitation is set aside for HUBZone, Woman-owned, and Service-Disabled Veteran-owned small businesses. Awarded contractors must comply with prevailing wage rates per the Davis-Bacon Act, provide weekly certified payroll reports for payment, and maintain a Unique Entity ID for reporting purposes.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Illinois → Physical Services

Same awarding agency

New
SLED
Fire Pump System for Stratton Building in Springfield
Solicitation # 27PS779008
Solicitation 27PS779008 is an Invitation for Bid issued by the Illinois Secretary of State for the replacement of the fire pump system at the Stratton Building in Springfield, Illinois. The scope of work includes the demolition and disposal of the existing fire pump, controller, jockey pump, and associated piping, as well as the installation of a new Aurora fire pump Model 6-81-15E, a Tornatech GPS fire pump controller, a 10-inch RPZ assembly, and Read-O-Matic water meters. The contractor is responsible for all labor, materials, equipment, and site management, including traffic signage and safety barricades. All work must adhere to strict regulatory standards, including the 2018 International Building, Mechanical, and Fire Codes, NFPA 101 and NFPA 13, and UL and FM certifications. The contract will be awarded to the lowest responsive and responsible bidder, provided the price is fair, reasonable, and within the state budget. Bidders must submit their offers electronically via the BidBuy portal by November 11, 2026. Required submissions include a 10% bid bond and comprehensive vendor disclosures covering financial interests, political contributions, and business operations. Upon award, a performance bond for the full contract amount is due within ten days. The agreement is subject to the Illinois Procurement Code, the Illinois False Claims Act, and the State Prompt Payment Act, and is contingent upon the availability of funds from the Illinois General Assembly.

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details
NAICS: 333912
New
SLED
27-350SOS-PHYSE-B-54562 | Compressor Components
Solicitation # 27PS014022
The Illinois Secretary of State is soliciting bids for brand name specific compressor components required for repairs to Quincy compressors. The scope of work specifically requires two Quincy 390L Basic Compressors, featuring 15hp 480v 3ph motors, 200 gallon base mounted tanks, and pressure setpoints of 110psi on and 125psi off. No alternatives to the specified brand will be accepted. Deliverables must be shipped FOB Destination to Springfield, Illinois, as soon as possible and no later than January 31, 2027. The contract will be awarded to the responsive and responsible bidder who submits the lowest price. Awardees must comply with various state and federal regulations, including the Illinois Department of Human Rights Act, the Americans with Disabilities Act, and specific certifications regarding educational loan defaults and cybersecurity risks. The vendor is required to maintain comprehensive insurance coverage, including 1 million dollars per occurrence for general commercial and auto liability, and 2 million dollars in annual aggregate for general liability. Payment is handled exclusively by the Secretary of State, with invoices generally submitted upon contract completion. Final award is contingent upon the successful completion of the agency's network security assessment and the contractor's completion of ethics training.
Air and Gas Compressor Manufacturing

POSTED

6 days ago

DEADLINE

N/A
View Details
NAICS: 333310
New
SLED
Ride-On Sweeper/Scrubber with Attachments
Solicitation # 27-350SOS-PHYSE-B-54552
The Office of the Illinois Secretary of State is soliciting bids for a new Ride-On Sweeper/Scrubber, specifically a Tennant S30 with WaterShield Side Brush Wet Dust Control or an equivalent model. The equipment must feature a hydrostatic LPG 33lb engine, a triple-stage filter system with 0.5 micron efficiency, and specific operator features including power steering and a high-back seat. Required attachments include a vacuum wand, fire extinguisher, backup alarm, and brass spray nozzles for wet dust control. The unit must be delivered FOB Destination to Springfield, Illinois, no later than June 30, 2027, with the contract term extending through May 30, 2027. Award will be granted to the vendor providing the lowest responsive and responsible bid by total cost, which must include all shipping expenses. Bidders are required to submit a price proposal, a taxpayer identification form, and various certifications regarding the Illinois Procurement Code, including domestic product preferences and employment vacancy postings. The selected vendor must maintain comprehensive insurance coverage, including 1 million dollars per occurrence for general commercial and auto liability. Payments will be processed in accordance with the State Prompt Payment Act, and the contract remains contingent upon the availability of funds from the Illinois General Assembly or federal sources.
Commercial and Service Industry Machinery Manufacturing

POSTED

6 days ago

DEADLINE

in about 10 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS