Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

3822 South Figueroa Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 3822 South Figueroa Project in Los Angeles, California, is a major mixed-use development involving the demolition of eight existing multi-family residential buildings—seven of which are located within the Flower Drive Historic District—and the construction of a new seven-story building on a 62,988 square-foot site. The proposed structure will include 209 residential units, with designated allocations for low-income households (16 units), very low-income households (22 units), and extremely low-income households (four units), alongside 2,705 square feet of ground-floor retail and restaurant space. The building will reach a maximum height of 86 feet and encompass a total floor area of 252,148 square feet. The project timeline spans multiple phases: demolition from January to March 2027, followed by site preparation, grading, and infrastructure improvements through the end of 2027, with building construction scheduled from January 2028 to December 2029 and architectural coating work concluding in October 2029. Off-site utility work, including trenching and paving, will occur concurrently during the early stages of site preparation. Performance is strictly tied to the site at 3822–3828 South Figueroa Street, Los Angeles, CA 90037, with all inspections and acceptance activities occurring on-site. Environmental and regulatory compliance forms a central component of the project’s execution. The contractor must adhere to stringent air quality standards enforced by the South Coast Air Quality Management District, including limits on visible emissions, fugitive dust (PM10 below 50 µg/m³), and VOC content in architectural coatings under Rule 1113. Compliance with state and federal regulations regarding asbestos handling (California Title 8), lead-based paint (Title 24 and 40 CFR 745), and OSHA construction safety protocols (29 CFR 1926) is mandatory. Emissions from construction equipment must meet CARB’s Tier 4 Final standards, and dust mitigation measures must prevent material from tracking onto public roads. Historic preservation protocols require the employment of a qualified project archaeologist and adherence to cultural resource protection training for workers. Inspection and acceptance oversight is shared between the contractor and government agencies including the City of Los Angeles, LADBS, LAFD, and SCAQMD, with final authority resting with the government. The project is led by

General Info

Demolition and construction of 209-unit mixed-use building with low-income housing at 3822 S Figueroa, LA.

Agency

California → City of Los Angeles

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Figueroa Street and 39th St., Figueroa St. and 38th St., and 38th St. and Flower Dr., Los Angeles, CA, 90037

Set-Aside

NONE

Documents

(36)

Appendix J Civil Engineering Report

PDF

Environmental Impact Analysis - Transportation Section IV

PDFenvironmental-impact-analysis

Environmental Impact Analysis - Greenhouse Gas Emissions

PDFenvironmental-impact-analysis

3822 South Figueroa Project Environmental Impact Report Cover and Table of Contents

PDFenvironmental-impact-report

Appendix D Archaeological Resources Assessment for 3822 South Figueroa Project

PDFarchaeological-resources-assessment

Environmental Impact Analysis - Police Protection Section IV

PDFenvironmental-impact-analysis

Draft Environmental Impact Report - Environmental Setting Section

PDFenvironmental-report

Draft Environmental Impact Report for 3822 South Figueroa Project

PDFenvironmental-impact-report

Appendix C Historic Resources Technical Report for 3822 S. Figueroa Street Project

PDFtechnical-report

Appendix A - Initial Study, NOP, and Comment Letters for 3822 South Figueroa Project

PDFinitial-study

3822 South Figueroa Project DEIR Public Notice

PDFenvironmental-impact-report

Appendix H Public Service Provider Response Letters - LAUSD 3800 South Figueroa Project

PDFother

Environmental Impact Report Alternatives Section

PDFsow

Appendix G Noise and Vibration Assessment for 3822 Figueroa Project

PDFnoise-and-vibration-assessment

SCH 2025040334 - 3822 South Figueroa Project Notice of Completion

PDFnotice-of-completion

Draft Environmental Impact Report - Fire Protection Services Analysis

PDFenvironmental-impact-analysis

Appendix E Greenhouse Gas Emissions Assessment for 3822 Figueroa Project

PDFenvironmental-assessment

SCH Summary Form for 3822 South Figueroa Project

PDFenvironmental-summary

Draft EIR Section VI - Other CEQA Considerations on Historic Resources

PDFenvironmental-impact-report-section

Appendix K Operational Air Quality, GHG, Energy, and Noise Analysis for 3822 Figueroa Project

PDFenvironmental-analysis

Environmental Impact Analysis - Tribal Cultural Resources Section

PDFenvironmental-impact-analysis

Project Description for Mixed-Use Building at South Figueroa Street

PDFproject-description

Notice of Completion and Availability of Draft EIR for 3822 South Figueroa Project

PDFspecial-notice

IX List of Preparers for Environmental Impact Report

PDFother

Caltrans Comment Letter on 3822 South Figueroa Project Environmental Review

PDFcomment-letter

Environmental Impact Analysis - Cultural Resources Section

PDFenvironmental-impact-analysis

Draft Environmental Impact Report - Noise Analysis Section IV.E

PDFenvironmental-impact-analysis

3822 Figueroa Street Student Housing Project Transportation Assessment

PDFtransportation-assessment

SCH #2025040334 3822 South Figueroa Project Comment Letter

PDFcomment-letter

VII. References Document

PDFother

Appendix F Land Use Tables - SCAG 2024-2050 RTP/SCS Consistency Analysis

PDFsupporting-document

Acronyms and Abbreviations Reference

PDFother

Environmental Impact Analysis - Land Use and Planning

PDFenvironmental-impact-analysis

Environmental Impact Analysis - Air Quality Section

PDFenvironmental-impact-analysis

Appendix B Air Quality Assessment for 3822 Figueroa Project

PDFenvironmental-assessment

Appendix L Tribal Cultural Resources Correspondence for 3822 South Figueroa Project

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Tamar GharibianPlanning Assistant
Jessie BarkleyCEQA/NEPA Compliance
Andrew BradyRepresentative

Interested Companies (1)

Show more
Kimley-Horn and Associates
Denver, Colorado

Full Description

Show more
The Project proposes a new seven-story, mixed-use building comprised of 209 dwelling units (including 16 units for Low-Income households, 22 units for Very Low-Income households, and four units for Extremely Low-Income households); and 2,705 square feet of ground level retail and restaurant uses. The Project would have a maximum building height of 86 feet, and a total floor area of 252,148 square feet on a 62,988 square-foot (1.4-acre) site. The Project involves the demolition of eight multi-family residential buildings (seven of which are within the Flower Drive Historic District), and the removal of surface parking areas.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Enlisted Unaccompanied Personnel Housing at Eglin AFB, FL
Solicitation # enlisted-unaccompanied-personnel-housing-eglin-afb-fl
The contract pertains to the construction of two two-story enlisted unaccompanied personnel housing barracks at Eglin Air Force Base in Florida, each designed to accommodate 120 personnel across 32 units. Each unit is equipped with a full kitchen, dining area, living space, and laundry room, while the buildings include shared amenities such as lobbies, elevators, entrance vestibules, exercise rooms, day rooms, lounges, and dedicated mechanical, electrical, and communications facilities. The project extends beyond the buildings themselves to encompass extensive site improvements, including parking areas for both vehicles and motorcycles, a large open pavilion, basketball and volleyball courts, concrete sidewalks, roadways, grading, storm sewer systems, utilities, landscaping, and incidental work. Construction activities will involve a wide range of trades including sitework, concrete, masonry, steel, millwork, insulation, roofing, waterproofing, doors and hardware, glass and glazing, drywall, flooring, paint, elevators, plumbing, HVAC, fire protection, electrical, fencing, and asphalt paving. The solicitation is issued by Roy Anderson Corp as the general contractor with a bid deadline of August 18, 2026, and is targeted exclusively toward small business set-asides including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities. The contract incorporates federal equal opportunity requirements by reference, mandating compliance with Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974. Offerors are required to express intent to bid via email or fax to Roy Anderson Corp’s designated point of contact and must submit comprehensive proposals detailing labor, materials, supervision, and equipment. Subcontractor participation from minority, disadvantaged, women’s, and HUBZone enterprises is strongly encouraged, though the total contract value and specific payment terms are not disclosed in the solicitation material.
Roy Anderson Corp

POSTED

about 12 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities, Hagatna, GU
Solicitation # rfo-awp-1072-iija-zua-ccf-environmental-wing-underground-utilities-hagatna-gu
The contract solicitation RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities in Hagatna, Guam, seeks qualified firms to undertake a major construction project involving the building of a new Environmental Wing and related underground utility improvements. This effort includes demolition of existing structures, comprehensive upgrades to the building’s electrical and HVAC systems, and significant infrastructure enhancements. The total project value exceeds $10 million, classifying it as a large-scale construction initiative under NAICS code 236220, with additional potential applicability to codes 236210, 237990, and 238110. The solicitation is reserved exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, as part of an SBA set-aside program. Interested firms must express their intent to participate by contacting Anna Ma, Subcontract Administrator at Parsons, via email at anna.t-ctr.ma@faa.gov. The response deadline is August 27, 2026, and the work will be performed entirely in Guam under the oversight of PTSI Managed Services, Inc.
PTSI Managed Services, Inc.

POSTED

about 12 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
New
Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT
Solicitation # windsor-secondary-treatment-system-upgrades-project-0
The project involves a major upgrade to the Water Reclamation Facility’s secondary treatment system, requiring complete dewatering and removal of the existing aeration basin, followed by excavation and construction of a new concrete aeration basin equipped with a flow splitting structure, air lines, diffusers, a mixing system, a surface wasting pumping system, and a high flow return pump linked to the adjacent storage pond. Alongside this, a new blower building with integrated blowers and a dedicated electrical control building will be constructed, along with a separate carbon feed building housing tanks and chemical metering pumps. Additional scope includes installation of a below grade secondary clarifier weir flow splitting structure and relocation of an existing concrete sand filter high flow diversion structure. The work is scheduled to be completed within 482 working days, with defined intermediate milestones to track progress, and participation from Disadvantaged Business Enterprises, including DBE, DVBE, MBE, WBE, and SBE, is strongly encouraged. Funding may be sourced in whole or part through the EPA’s WIFIA program, and contractors and subcontractors must strictly adhere to the requirements outlined in Section 9 of the Special Provisions tied to this funding. Bids must be submitted by September 3, 2026, and while the pre-bid conference has already occurred, all contract documents including plans and specifications are accessible electronically through the Town of Windsor’s bidding portal and BuildingConnected upon registration and completion of a short informational form. The solicitation is designated for small business set-asides, including SDB, WOSB, and MBE certifications, with C. Overaa & Co. listed as the administering agency and Anna Stein as the primary point of contact.
C. Overaa & Co.

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236220
New
Vehicle Maintenance Shop #71 Fort Hood, Texas
Solicitation # vehicle-maintenance-shop-71-fort-hood-texas
Cerris Builders, INC is soliciting bids for the construction of a Vehicle Maintenance Shop #71 at Fort Hood, Texas, under a small business set-aside that includes opportunities for Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities. The project involves building a standard-design facility to support vehicle maintenance operations, complete with a large maintenance bay, tactical vehicle parking, storage areas for organizational equipment, petroleum and hazardous materials, and dedicated space for unmanned aerial vehicle storage and maintenance. The scope also encompasses integrated fire protection and alarm systems, intrusion detection systems, and an Energy Monitoring Control System to ensure operational efficiency and security. Additional required work includes installation of site utilities, storm drainage, paving, sidewalks, lighting, signage, fencing, and landscaping to support full facility functionality. The solicitation was posted on August 9, 2026, with a response deadline of August 11, 2026, and is classified under NAICS code 236220 for commercial and institutional building construction. Primary point of contact for inquiries is Drake Martin, reachable via email at ddmartin@cerris.com or phone at 945-248-2964.
Cerris Builders, INC

POSTED

about 12 hours ago

DEADLINE

in 1 day
View Details
NAICS: 236220
New
Armed Forces Retirement Home – Sheridan Building Construction Services
Solicitation # armed-forces-retirement-home-sheridan-building-construction-services
The Sheridan Building, a historic eight-story structure constructed in 1962 with a total area of 387,350 square feet, is undergoing a comprehensive renovation to transform it into a residential facility featuring 354 units and basement amenities. The construction effort is divided into two distinct phases: Area A, the base contract, which spans 655 calendar days, and Area B, an optional phase that will begin only after Area A is fully completed and is estimated to take 540 calendar days. A Project Labor Agreement is required to govern labor relations and ensure consistency across the workforce. The project is being managed under a solicitation issued by the Armed Forces Retirement Home, with Grunley Construction Company named as the contracting organization. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone small businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, reflecting a strong emphasis on supporting underrepresented small business participants in federal contracting. The place of performance is in the District of Columbia, and responses to the solicitation were due by August 17, 2026.
Grunley Construction Company

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
SLED
26-West Valley Campus 2/3 Expansion
Solicitation # 26-WV2-EXP
The State of Utah Division of Purchasing, acting on behalf of Utah Charter Academies (UCA), is soliciting bids for a Construction Management/General Contractor (CM/GC) services contract to expand the American Preparatory Academy’s West Valley Campus 2/3 facility. The project involves two overlapping construction phases: Phase 1 includes a new elementary classroom addition with six general classrooms, three breakout rooms, and restrooms, scheduled to open for the 2027/28 school year; Phase 2 involves constructing secondary classrooms for band, orchestra, dance, and drama—with one drama room designed as a black box theater—and a new 450-seat auditorium with full support spaces, to be completed for the 2028/29 school year. A separately bid alternate covers the shell of a future lunch preparation kitchen. The fixed limit of construction cost is set at $16,093,075, and bidders must submit detailed cost proposals for preconstruction fees, construction management fees, supervision costs, and temporary construction costs, while the design will evolve through collaborative input from the CM/GC during preconstruction. Proposals must be submitted electronically via Bonfire by August 28, 2026, and must consist of separate, non-pricing technical and cost responses, with the technical submission limited to 15 pages, excluding cover and tab sections, and formatted as a single PDF with seven required tabs and a separate 11” x 17” summary sheet. The contract is governed by the State of Utah’s Agency Standard Terms and Conditions, dated September 16, 2024, which governs all aspects of performance, compliance, and dispute resolution. Key terms include a venue for legal proceedings in Salt Lake City’s Third Judicial District Court, a requirement for contractors to retain records for six years after final payment, and mandatory insurance coverage with minimum limits of $1 million per person/$3 million aggregate for commercial general liability and $1 million combined single limit for commercial automobile liability. Contractors must also maintain workers’ compensation insurance at statutory limits and comply with federal and state employment laws including Title VI and VII of the Civil Rights Act, the Americans with Disabilities Act, Section 504, and Utah’s Executive Order 2019-1. Additional mandatory certifications include participation in E-Verify for all Utah-based employees, compliance with Utah’s anti-boycott statute regarding Israel, and certification that no forced labor products or technology
Utah

POSTED

1 day ago

DEADLINE

in 19 days
View Details