447 Battery and 530 Sansome Street Project

Forecast
2024-007066ENV-447Battery-NOD-FiledState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 447 Battery and 530 Sansome Street Project is a major urban redevelopment initiative in San Francisco involving a Development Agreement between the City and County of San Francisco and EQX Jackson Sq Holdco LLC. The project scope requires the demolition of four existing structures, including commercial buildings at 425, 439-445 Washington Street, 447 Battery Street, and the fire station at 530 Sansome Street. In their place, the developer will construct a 4-story, 31,200-square-foot replacement fire station on the 447 Battery Street parcel and a separate high-rise building reaching up to 41 stories. The high-rise will feature approximately 27,030 square feet of retail space, between 372,580 and 417,770 square feet of office space, and between 128,010 and 189,130 square feet of hotel space accommodating 100 to 200 rooms. To ensure continuity of emergency services, Fire Station 13 operations will temporarily relocate to existing offsite facilities until the new station is completed. The project includes significant infrastructure improvements, such as three below-grade levels for vehicle and bicycle parking under the high-rise, a passenger loading zone on Sansome Street, and the creation of privately maintained public open space along Merchant Street. The project has been granted approval following compliance with the California Environmental Quality Act, including the adoption of a Final Environmental Impact Report and a Mitigation Monitoring Reporting Program. Administrative oversight is led by the San Francisco Public Utilities Commission, with final approvals granted by the San Francisco Planning Commission and the Board of Supervisors.

General Info

San Francisco redevelopment for a new fire station and mixed-use high-rise building.

Place of Performance

Merchant, Washington, San Francisco, CA, 94111

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Full Description

Show more
The 447 Battery and 530 Sansome Street Project, located on the block bounded by Sansome Street to the west, Washington Street to the north, Battery Street to the east, and Merchant Street to the south, would involve demolition of the existing 17,800-square-foot, 3-story commercial building at 425 Washington Street, and the 12,862-square-foot, 2-story commercial building at 439-445 Washington Street; the 20,154-squarefoot, 3-story commercial building at 447 Battery Street; and the 18,626-square-foot fire station at 530 Sansome Street. The project includes a Development Agreement and certain other transaction agreements between EQX Jackson Sq Holdco LLC and the City and County of San Francisco. Prior to demolition of 530 Sansome Street and during construction of the proposed project, Fire Station 13 operations (including personnel and firetrucks) would temporarily relocate to nearby offsite existing San Francisco Fire Department facilities until construction of a replacement fire station is completed. No construction or tenant improvements would be required for temporary relocation. No interruption of fire department service would occur and relocated fire department operations would continue to serve the Financial District neighborhood and the city in general. The project sponsors propose to construct a 4-story replacement fire station and a separate high-rise building up to 41 stories tall. The replacement fire station would be located on the 447 Battery Street parcel and would include approximately 31,200 square feet (including one basement level with 18 vehicle parking spaces and four class 1 bicycle spaces) in a 4-story, approximately 55-foot-tall building {60 feet total to the roof, including amenity space on the fourth floor and rooftop mechanical equipment) on the eastern portion of the project site. The high-rise building, approximately 544 feet tall {574 feet total, including rooftop mechanical equipment), would be located on the remaining three parcels and would include approximately 27,030 square feet of retail uses (cafe, restaurant, and ballroom/pre-function/meeting spaces on levels 1 through 3); between approximately 372,580 and 417,770 square feet of office space; and between approximately 128,010 and 189,130 square feet of hotel space for approximately 100 to 200 hotel rooms. There would be three below-grade levels under the high-rise building, which would provide approximately 74 vehicle parking spaces, 81 Class 1 bicycle parking spaces, and utility rooms. The proposed project would provide 20 class 2 bicycle parking spaces on streets adjacent to the project site, and one passenger loading zone on Sansome Street. The proposed project would improve the entirety of Merchant Street between Battery and Sansome streets with privately maintained public open space that would be maintained by project sponsor for the life of the proposed project.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope repairs, new roofing, and interior reconfiguration. Key technical upgrades include the installation of new HVAC systems, rooftop air-handling units, air-cooled water chillers, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the work covers the replacement of electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project aims to restore residential rooms, bathrooms, common areas, and mechanical rooms that suffered extensive interior damage due to water intrusion. The scope of work includes drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The selected contractor must provide all labor, materials, equipment, and supervision to return the affected spaces to safe residential use, ensuring proper protection of the occupied building and minimal service interruptions. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan with project phasing, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → City and County of San Francisco

Same awarding agency

NAICS: 237990
SLED
Pier 92 Modernization and Plant Replacement ProjectThe Pier 92 Modernization and Plant Replacement Project, managed by the City and County of San Francisco, involves the reconstruction and modernization of an existing sand processing facility at the Port of San Francisco. The project aims to improve environmental controls through the construction of an enclosed warehouse, the installation and upgrading of equipment, the paving of vehicle and equipment areas, and the implementation of a modern stormwater management system. To accommodate these improvements, the facility is seeking to expand its lease area by 34,371 square feet, increasing the total footprint from 190,299 to 224,600 square feet. The project also includes obtaining an Authority to Construct and Permit to Operate from the Bay Area Air District with a proposed annual throughput limit of 800,000 tons. Construction is expected to last up to seven months and will involve the excavation or disturbance of 3,305 cubic yards of soil, while sand processing operations remain active. Environmental reviews conducted under CEQA have identified potential impacts on archaeological resources, which will be managed via accidental discovery procedures, and have addressed public concerns regarding air quality within the Bayview environmental justice community. Key coordinating agencies include the San Francisco Planning Department, the Port of San Francisco, the Bay Area Air District, and the San Francisco Bay Conservation and Development Commission. The project has undergone a comprehensive environmental impact report process with final certification hearings scheduled for October 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Potrero Power Staton Mixed-Use Development ProjectThe Potrero Power Station Mixed-Use Development Project is a multi-phased redevelopment of a 29-acre site along San Francisco's central bayshore waterfront, formerly the site of the Potrero Power Plant. The 2025 modified project expands the scope to approximately 5.6 million gross square footage across 15 development blocks, incorporating residential market-rate and affordable housing, commercial office, retail, hotel, research and development, and industrial production, distribution, and repair uses. The project also includes the creation of waterfront open space, a dock facility, shoreline improvements, and an internal grid of public streets and utilities. Construction began in 2020 with an original estimated completion date of 2035. The project is managed by the City and County of San Francisco and is governed by the Potrero Power Station Special Use District and CEQA guidelines. A critical component of the project is the Mitigation Monitoring and Reporting Program, which mandates strict compliance with environmental standards regarding air quality, noise, and biological resources. Key requirements include the use of renewable diesel, a two-minute idling limit for diesel engines, and the implementation of a Construction Emissions Minimization Plan. Additionally, the project requires the installation of ADA-compliant curb ramps and specific on-street ADA parking. Environmental safeguards are in place to protect marine mammals during pile driving and to manage the discovery of archaeological or paleontological resources, which may temporarily suspend construction.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
PG&E Power Asset Acquisition Project
Solicitation # 2023-005370ENV
The City and County of San Francisco is undertaking the acquisition of Pacific Gas and Electric Company’s electrical transmission and distribution assets within San Francisco and portions of San Mateo County to assume direct ownership, operation, and maintenance of the local electricity grid. This project does not involve natural gas facilities, which PG&E will continue to provide. The acquisition requires substantial physical separation of the existing electrical infrastructure along the San Francisco–San Mateo county boundary to enable independent and reliable operation by both the City and PG&E. Key construction activities include modifying or rebuilding the Martin Substation, constructing approximately 3.8 miles of new underground express distribution feeders routed through public rights-of-way from Arch Street to the Martin Substation in Brisbane, and making localized above- or below-ground modifications to distribution lines near the county line. Construction is expected to take approximately three years following asset transfer. The project’s environmental compliance is governed by California law, with all contractual obligations binding on the City, its successors, and assigns in perpetuity. Termination rights allow either party to end the agreement with thirty days’ written notice, and any unenforceable provisions will be severed without voiding the remainder. Administrative costs are outlined in detail, including annual recurring expenses for chip sealing, groundwater monitoring, trench maintenance, and DTSC oversight, with a total estimated contract value of $1,587,331 based on a thirty-year net present value calculation. An advance payment of $2,900 is required within ten days of full execution for DTSC, with quarterly billing and sixty-day payment terms. Contractors must comply with rigorous environmental and safety protocols, including mandatory Worker Environmental Awareness Program training covering protected species avoidance, hazardous material handling per Cal/OSHA standards, and site-specific Health and Safety Plans addressing chemicals of potential concern and emergency response. Extensive documentation, including permits, waste manifests, laboratory analyses, and chains of custody, must be submitted to DTSC upon completion. Attachments and appendices provide supporting technical data on noise, biological resources, air quality, hazardous materials, and historic gas plant sites, ensuring comprehensive regulatory adherence throughout the project lifecycle.
Power and Communication Line and Related Structures Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS