THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSALS. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME. The Solicitation Number for this announcement is N69450-08-R-1756. Naval Facilities Engineering Command, solicits for Capability Statements from all qualified and interested parties with a priority on: 8(a) HubZone and Service Disabled Veteran Owned Small Business firms-first priority and Unrestricted-second priority to participate in a one-phase best value full and open solicitation for the Air Traffic Control Tower Facility, a ten story facility at NAS JRB Fort Worth, TX. The NAICS Code for the proposed acquisition is 236220, Commercial and Institutional Building Construction, and the small business size standard is $31 Million. The Federal Supply Code is Y199, Construct Misc Bldgs. Under FAR guidelines, the prime contractor must have the capability to perform at least 20 percent of the contract work with its own employees. The Government will use responses to this SOURCES SOUGHT market survey to make appropriate acquisition decisions. A decision will be made to issue this solicitation as a competitive set-aside for 8(a), Service Disabled Veteran Owned, or HubZone Small Business contractors or to issue an unrestricted solicitation, inviting full and open competition. The proposed solicitation will be formatted as a Request for Proposal (RFP) in accordance with requirements designated by sections of the FAR 15.203 and NFAS for a negotiated procurement utilizing the construction selection procedures of FAR 36. This method permits evaluation of proposals based on price competition, technical merits and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. The estimated cost for this acquisition is between $10,350,000 and $11,500,000 for the term of the contract. Design Build for the Air Traffic Control Tower Facility at NAS JRB Fort Worth, TX includes a ten story, 16,422 SF, steel framed building. The height of the control tower provides an operator eye level height greater than 107 feet above ground level. The air traffic control tower will be attached to the north end of building 4205. The control tower shaft will include an elevator and operational spaces for airfield, air to ground traffic shaft with pile foundations. Elevator and stairs will be provided up to the cab. Heating, ventilation and air conditioning will be provided. Voice and data communications will be provided. The Radar Air Traffic Control Facility (RATCF) will be built as an addition to Building 4205. The RATCF will include space for electronics equipment, electronics maintenance and ground electronics vehicle storage (roll-up door), training space, break room and administration. Electrical and mechanical systems, fire protection, and voice and data communications will be provided. The existing air traffic control tower shaft at Building 1425 will be demolished from the top of the second floor and higher. The first two floors will remain and will be covered with a roof. Adjacent walls will be closed/repaired to match existing. This space will be used to house the existing HVAC, fire alarm and other electrical and electronic equipment in operation at Building 1425. CONTRACTOR CAPABILITIES: OFFERORS MUST SUBMIT EVIDENCE OF THE FOLLOWING SPECIFIC CAPABILITIES: Name of Company: Address: Point of Contact: Phone/Fax/Email Address: 1. Recent and relevant construction experience with federal government work within the last 3 calendar years, for projects of similar size, scope, and complexity as a $11.5M Air Traffic Control tower and Radar Air Traffic Control Facility. 1. Recent and relevant construction experience with Design/Build within the last 3 calendar years, for projects of similar size, scope, and complexity as a $11.5M Air Traffic Control tower and Radar Air Traffic Control Facility. 2. Recent and relevant construction experience with UFC (Unified Facility Code) design and construction criteria for solutions of ten stories or greater, including hydraulic elevators within the last 3 calendar years, for projects of similar size, scope, and complexity as a $11.5M Air Traffic Control tower and Radar Air Traffic Control Facility. 3. Recent and relevant construction experience with UFC (Unified Facility Code) design and construction criteria for integration of multiple telecommunications systems, including the resume of a certified RCDD on staff, with work in the last 3 calendar years, for projects of similar size, scope, and complexity as a $11.5M Air Traffic Control tower and Radar Air Traffic Control Facility. 4. Recent and relevant experience in developing change proposals and recommending alternative solutions to design discrepancies within the last 3 calendar years for construction projects of similar size, scope, and complexity as a $11.5M Air Traffic Control tower and Radar Air Traffic Control Facility. 5. Experience in developing and maintaining a construction quality control program. Specific requirements include familiarity with the 3 phases of control for quality and completion of the course entitled ?Construction Quality Management for Contractors?. This course is offered by the Army Corps of Engineers and the Naval Facilities Engineering Command. 6. Experience with phased construction including a demonstrated ability with CPM scheduling using SureTrak software by Primavera Systems. 7. Include proof of available bonding capacity in excess of $11.5M. 8. Provide proof of SBA certification for either 8a or HubZone status. The Capabilities Statement for this sources sought is not expected to be a proposal, but rather short statements regarding the company?s ability to demonstrate existing-or-developed expertise and experience in relation to the areas specified herein. Any commercial brochures or currently existing marketing material may also be submitted with the capabilities statement. Submission of Capabilities statement is not a prerequisite to any potential future offerings, but participation will assist the Navy in tailoring requirements to be consistent with in industry capabilities. This market survey is for information and planning purposes only and should not be construed as a committed be the Government. The Government will not pay for information solicited. Respondents will not be notified of the results of the evaluation. After completing its analysis, the Government will determine whether to limit competition among 8(a), Service Disabled Veteran, or HubZone small business firms or to proceed with issuing an unrestricted solicitation, inviting full and open competition. Offers that do not meet all requirement or submit within the allotted time will not be considered. Electronic submission will NOT be accepted. RESPONSES TO THIS SOURCES SOUGHT MARKET SURVEY MUST BE MAILED TO: Naval Facilities Engineering Command, Southeast, Darrall Lafayette, Contract Specialist, P.O. Box 190010, North Charleston, South Carolina 29410-9010. The package must be marked ?Air Traffic Control Tower Facility, a ten story facility at NAS JRB Fort Worth, TX.? on the outside of the package.