Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

620 East Valley Parkway Affordable Housing Project Ground Lease and Amendment to Disposition and Development Agreement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Diego County is authorizing a 99-year ground lease to facilitate the phased development of a 100 percent affordable senior residential project at 620 East Valley Parkway in Escondido, California, while amending an existing agreement to replace a childcare facility with enhanced communal amenities designed specifically for senior residents. The project will consist of two five-story buildings totaling 136 dwelling units, with Building 1 fronting East Valley Parkway and providing 72,000 square feet of floor area that includes a lobby, offices, bicycle parking, a common space, laundry facilities, and 8 studio units on the first floor, followed by 17 one-bedroom and 3 two-bedroom units on each upper floor. Building 2, located along North Fig Street, spans 36,000 square feet and houses communal amenity spaces and a laundry room, with seven studio and five one-bedroom units on each of its upper floors. A drive aisle running between the buildings provides access to 78 parking spaces and connects to the adjacent Esperanza Crisis Center site. The design incorporates solar façades and rooftop photovoltaic systems, making both buildings all-electric, with energy performance expected to exceed the 2022 California Energy Code and achieve LEED Silver certification. Off-site improvements include sidewalk enhancements, undergrounding of overhead electrical lines, and new utility connections to existing water, sewer, and stormwater infrastructure, including 2-inch water services, fire water and irrigation connections, and sewer laterals tied into existing mains. Stormwater management will follow a Site Water Quality Management Plan using best management practices, with runoff directed through two existing outfalls at the site's northern edge.

General Info

San Diego County approves 99-year lease for 136-unit affordable senior housing with LEED Silver, solar power, and upgraded amenities.

Agency

California → San Diego County

NAICS

236116 - New Multifamily Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

East Valley Parkway and N Fig Street, Escondido, CA, 92025

Set-Aside

NONE

Documents

(1)

NOE - 620 East Valley Parkway Affordable Housing Ground Lease

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego County
Office AddressN/A
Contacts
Marcus LubichProject Manager

Full Description

Show more
The project involves authorization to execute a 99-year ground lease to allow for phased construction of a 100 percent affordable senior residential development and to amend an existing Disposition and Development Agreement to allow for the childcare facility to be replaced with additional robust communal amenity spaces tailored to senior resident population. The project consists of the construction of two buildings with 136 dwelling units for seniors, an approximately 5,100 square foot (SF) communal amenity spaces tailored to senior resident population, and linear park on County-owned property. Each building would be five stories and up to 67 feet in height. Building 1 would total approximately 72,000 square feet (SF) of floor area and Building 2 would total approximately 36,000 SF. Building 1 would front East Valley Parkway and the first level would primarily include accessory spaces, including a lobby, bicycle parking, offices, a common space, and laundry room. Eight studio units would be located on first floor of Building 1, and 17 one-bedroom and 3 two-bedroom units would be located on each of floors two through five. Building 2 would be located along North Fig Street and would include the communal amenity spaces and a laundry room. Floors two through five of Building 2 would each include 7 studio units and 5 one-bedroom units. A drive aisle accessible from North Fig Street would bisect the site between the two buildings and provide access to approximately 78 parking spaces along the drive aisle and to the north along the Esperanza Crisis Center site. The project would meet and exceed the requirements of the 2022 California Energy Code and is anticipated to achieve a Leadership in Energy and Environmental Design (LEED) designation of Silver. The buildings would include solar façades in addition to rooftop photovoltaic systems and would be all-electric buildings. Off-site improvements included as part of the project include sidewalk improvements and utility connections to existing public mains. A series of 2-inch water service connections and additional fire water and irrigation connections to the existing 12-inch water main in East Valley Parkway and 6-inch main in North Fig Street would be constructed. Sewer connections to an existing 10-inch main in North Grape Street would be constructed via 6-inch laterals from the buildings feeding into an 8-inch lateral through the project drive aisle. Two existing outfalls at the northern edge of the site would be used for stormwater runoff, with best management practices (BMPs) to be implemented throughout the site in accordance with a Stormwater Quality Management Plan (SWQMP). Existing overhead electrical lines at the eastern edge of the project site would be undergrounded at the site.

Similar Contracts

Same NAICS industry code

NAICS: 236116
New
SLED
Affordable Housing Development - Homekey+
Solicitation # 27-06
The County of Shasta, through its Department of Support Services, Purchasing Division, is seeking proposals from qualified affordable housing developers to secure funding for predevelopment, acquisition, rehabilitation, and permanent supportive housing projects under the Homekey+ program. The initiative prioritizes Housing First principles to address homelessness among veterans and other vulnerable populations, specifically targeting households where an individual is homeless, chronically homeless, or at risk of homelessness and lives with a behavioral health challenge. Applicants must demonstrate site control for their proposed project and are required to locate their developments within the County of Shasta, excluding the City of Redding limits. Only complete submissions with verified site control will be considered for evaluation. Proposals must be submitted by the deadline of October 12, 2026, and are open to developers with a proven track record in affordable and supportive housing. The solicitation, numbered 27-06, was posted on August 10, 2026, and is managed by the Shasta County Purchasing Department based in Redding, California. Primary contact for questions and submissions is Lynne Davis, Agency Staff Services Analyst II, with secondary support provided by Jessica Moore. All project activities must comply with Homekey+ objectives, ensuring that housing services are integrated with supportive care to promote long-term stability for participants.
Purchasing Department

POSTED

about 21 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236116
New
SLED
Affordable Housing Development And Owner-Occupied Rehabilitation
Solicitation # 20260806016
Shasta County is soliciting proposals under Bid #27-03 for Affordable Housing Development and Owner-Occupied Rehabilitation services, with a response deadline of September 2, 2026, and a solicitation number of 20260806016. The work is to be performed in Redding, California, 96001, and is structured as a personal services agreement rather than a federal procurement governed by the Federal Acquisition Regulation. The contract does not include standardized FAR clauses, DFARS provisions, or federal contract syntax; instead, it uses custom section headings such as Responsibilities of Consultant, Compensation, and Termination of Agreement with bracketed placeholders indicating customizable terms for local application. The agreement begins upon the last signature and may be extended annually contingent upon funding appropriation by the County’s Board of Supervisors, aligning with the fiscal year from July 1 to June 30. The consultant is required to comply with California Civil Code Section 2782.8, HIPAA, Welfare and Institutions Code §10850, and other state and federal regulations, and must maintain specified insurance coverage including cyber liability, professional liability, and workers’ compensation. All work products, data, and reports become the sole property of the County. Confidentiality of client and patient information is mandatory, with a separate HIPAA Business Associate Agreement required. The consultant must not assign obligations without written consent, may not use County property without authorization, and is required to indemnify the County against claims arising from professional services. Payment terms are established but all dollar amounts are redacted as placeholder text, and there is no disclosed estimated contract value. No specific evaluation factors, cost breakdowns, or socioeconomic set-asides are outlined, and the document includes no formal Section K representations, UEI or CAGE code requirements, or federal procurement administration data such as COR/COTR information, invoicing methods, or accounting codes. The contract is administered under local county policies, with notices and amendments requiring written agreement by both parties per the Shasta County Contracts Manual.
Shasta County

POSTED

4 days ago

DEADLINE

in 22 days
View Details
NAICS: 236116
New
SLED
Ax Sherwood Avenue Residential ProjectThe City of Los Altos is forecasting a residential redevelopment project at Sherwood Avenue that involves demolishing existing commercial and single-family structures to make way for seven new three-story townhouse buildings totaling 33 units, each equipped with a private garage and a maximum height of 36.5 feet. The project aims to capitalize on the State Density Bonus Law to secure a concession concerning the bedroom distribution for affordable housing units, while also seeking waivers from multiple development standards including commercial floor area limits, setbacks, building step-backs, articulation requirements, open space allocation, ground-floor design, window recesses, entrance orientation, loading provisions, and pedestrian-scaled entrance features. These waivers are intended to facilitate the proposed design and density while maintaining compatibility with the neighborhood context. The project is positioned as part of a broader effort to increase housing density and diversity in Los Altos, with a focus on mixed-use and transit-oriented development principles even though no commercial components are retained beyond the initial demolition. The primary point of contact is Brittany Whitehill, Senior Planner at the city, who can be reached via email or phone, with additional correspondence handled by Jia Li of Alpha Inbay. The project is publicly listed under CEQA Net with a posted date of August 7, 2026, and is expected to progress through environmental review and permitting processes typical for residential developments in California. The location is clearly defined as Los Altos, California, with a ZIP code of 94024, and no federal or state set-aside provisions are indicated for this municipal initiative.
City of Los Altos

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 236116
New
SLED
810 Wilton Ave (ENV-2026-213-CE)The project at 810 Wilton Ave in Los Angeles involves the demolition of an existing single-family residence and the construction of a new six-story residential building containing 16 dwelling units, with two units designated for Extremely Low Income Households. The development will provide 20,031 square feet of residential floor area and meet a maximum Floor Area Ratio of 4.22:1, with a height limitation of 64 feet and eight inches. The building will include five ground-floor automobile parking spaces, two short-term and sixteen long-term bicycle parking spaces, and 2,561 square feet of open space distributed as 901 square feet of ground floor landscaping, a 1,160 square-foot roof deck, and a 500 square-foot recreation room. As an in-fill multifamily project, it qualifies for the Class 32 Categorical Exemption under environmental review. The project is pursuing incentives under the Transit Oriented Communities (TOC) Affordable Housing Program to exceed standard development standards. It seeks a height increase to allow a maximum building height of 67 feet, surpassing the city’s typical 45-foot limit, and a reduction in side yard setbacks from nine feet to six feet and 3.6 inches to accommodate the building’s design. These adjustments are permitted under TOC incentives to promote density and affordability near transit corridors. The development is managed by the City of Los Angeles, with Filomena Fuchs as the primary contact, and is submitted by applicant Jafar Shahbaz through BBAS Studios, with all documentation accessible via the CEQANet portal.
City of Los Angeles

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 236116
New
Federal
Pueblo Pintado Staff Quarters Design Build
Solicitation # 75H70126R00056
The Indian Health Service is conducting a sources sought notice to gather market information for the planned design-build construction of 82 new LEED-certified staff quarters and associated amenities in Pueblo Pintado, New Mexico, to support the new Pueblo Pintado Health Center. The project, estimated between $50 million and $100 million, involves comprehensive site development including underground utilities, roads, sidewalks, lighting, security infrastructure, recreational facilities such as basketball and tennis courts, playgrounds, picnic areas, RV sites, and a housing support building, all designed to meet sustainability goals and cultural context in a remote Navajo Nation location. The contract is anticipated to be awarded as a competitive two-phase firm-fixed-price design-build under FAR Part 15, with selection based on best-value tradeoff, and is expected to commence in late spring or early summer of 2027 with a two-year performance period. The project falls under NAICS code 236116 and is subject to the Navajo Preference in Employment Act. The government intends to require a Project Labor Agreement (PLA) post-award and is soliciting input on labor market conditions, including the availability of union and non-union labor, potential impacts on competition and cost, and the applicability of a PLA given the remote location of the site. Respondents are requested to provide company details, small business certifications including Native American-owned (IEE/ISBEE), 8(a), HUBZone, WOSB, or SDVOSB status, bonding capacity, and project experience from the past six years with similar large-scale residential construction. IEE/ISBEE firms must submit a completed IHS representation form and Bureau of Indian Affairs Certificate of Degree of Indian Blood documentation, with personally identifiable information redacted. Responses are due by 2:00 PM PT on August 21, 2026, and must be submitted to Matt Sanders at matt.sanders@ihs.gov; no proposals are being accepted and no reimbursement will be provided for response costs. This notice is strictly for acquisition planning purposes under FAR Part 10 and does not constitute a solicitation or commitment to award.
Division Of Engineering Svcs - Seattle

POSTED

5 days ago

DEADLINE

in 10 days
View Details
NAICS: 236116
New
SLED
Development Plan (RD24-00008), Tentative Map (RT26- 00001), Conditional Use Permit (RCUP24-00004), And Regular Coastal Permit (RRP24-00006) – 217 S Myers BeachThe project at 217 South Myers Street in Oceanside, California, involves the demolition of an existing cottage and the construction of five condominium units distributed across two three-story buildings. Located within the Appealable area of the Coastal Zone and the Townsite Neighborhood Planning Area, the site is zoned as Downtown Subdistrict 5 with a General Plan Land Use designation of Downtown and a Local Coastal Program Land Use Plan designation of High Density Residential. The development requires approval of multiple permits including a Development Plan, Tentative Map, Conditional Use Permit, and Regular Coastal Permit to ensure compliance with local and coastal regulations. All activities must align with the stringent land use and environmental standards applicable to the coastal zone and high-density residential area. The project is overseen by the City of Oceanside, with key contacts including Senior Planner Dane Thompson and architect Kirk Moeller, who serve as primary points of communication for planning and design matters. The permits were posted for public review on August 6, 2026, and the project is listed under the California Environmental Quality Act system with the project number 2026080179. Construction will occur in a densely structured urban setting where density, design consistency, and coastal access are critical considerations, requiring adherence to the Local Coastal Program and municipal zoning codes governing the Downtown Subdistrict.
City of Oceanside

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 236116
New
SLED
University Station Residential ProjectThe University Station Residential Project involves the demolition of four existing office buildings totaling 216,000 square feet and two parking garages to make way for a new mixed-use residential development. The project will include up to 297 multi-family residential units in a five-story building reaching a maximum height of 64 feet above grade, along with up to 111 three-story townhouse units spread across 26 buildings with a maximum height of 38 feet. Thirteen of the townhouse units will be located on a 0.94-acre parcel currently within the City of San José, while the remainder of the townhouses and the main residential building will be situated on the Santa Clara parcel. The project will achieve an average density of 37 dwelling units per acre and will feature an 8.5-foot-wide sidewalk along the frontage of El Camino Real and Campbell Avenue to improve pedestrian access. To facilitate development, the 0.94-acre parcel in San José will be annexed into the City of Santa Clara, which requires formal detachment from San José and annexation into Santa Clara. Upon approval, the Santa Clara General Plan will be amended to designate the annexed parcel for Santa Clara Station Mixed Use, encompassing both Regional Commercial and High Density Residential land uses, and the parcel will be rezoned to Mixed Use-Regional Commercial (MU-RC). The project is being led by Bixby Land Company with key contacts including Senior Planner Steve Le and Project Manager Nick Towstopiat, and is listed under a forecast notice issued by the City of Santa Clara with a posted date of August 6, 2026. The development aims to transform underutilized commercial property into a higher-density residential community consistent with transit-oriented growth principles.
City of Santa Clara

POSTED

5 days ago

DEADLINE

N/A
View Details