Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Harvest in Newark Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Harvest in Newark Project proposes the development of 274 rental units across 83 two-story duplexes and 18 three-story townhome buildings, offering a mix of two-, three-, and four-bedroom layouts, each with private direct access garages. The architectural design will reflect Spanish colonial-inspired styles to align with the regional character of Newark, California. In addition to residential structures, the project includes a clubhouse featuring leasing and management offices, a resident lounge, business center, game room, and fitness facility. Recreational amenities will consist of a community swimming pool and spa, outdoor seating areas, a children’s play area, and a dedicated dog park. The development will also enhance existing off-site walking trails adjacent to the Ohlone College District’s Newark Center Campus and incorporate a stormwater treatment area in the southeastern corner of the property to manage runoff. Utility infrastructure will be integrated with regional systems, including water and wastewater connections to the Alameda County Water District and Union Sanitary District, and electrical service via Pacific Gas & Electric. Solid waste and recycling services will be provided by Republic Services. The project will provide 718 on-site parking spaces, comprising 509 garage spaces and 39 covered spaces for residents and 170 surface spaces for guests. Primary access to the site will be through a gated, 26-foot-wide road from Cherry Street to the northeast, with potential secondary access from Mowry Avenue to the southwest for emergency vehicle use. A 26-foot-wide internal road will connect directly to the Ohlone College District’s proposed student housing project to ensure functional circulation between the two developments. All construction and design elements are intended to meet local standards and support sustainable, community-focused living in the Newark area.

General Info

274 rental units with garages, clubhouse, pool, dog park, stormwater area, and 718 parking spaces in Spanish colonial style.

Agency

California → City of Newark

NAICS

236116 - New Multifamily Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

Cherry Street, Mowry Avenue, Newark, CA, 94560

Set-Aside

NONE

Documents

(3)

Harvest in Newark Project Notice of Preparation

PDFnop

Harvest in Newark Project Notice of Preparation

PDFnotice-of-preparation

Notice of Preparation for Harvest in Newark Project

PDFnotice-of-preparation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Newark
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Newark
Office AddressN/A
Contacts
Carmelisa LopezSenior Planner
Todd ChambersVice President
Lesley OwningPrincipal Planner

Interested Companies (1)

Show more
HELIX Environmental Planning
La Mesa, California

Full Description

Show more
The proposed project would include construction of 274 rental units consisting of 83 two-story duplex buildings (166 total units) and 18 three-story, six-unit townhome buildings (108 total units). The project would include a variety of floor plans, with a mix of two-, three-, and four-bedroom units, each with a private direct access garage. The architectural style for the proposed buildings would be consistent with the regional character of Spanish colonial-inspired styles. The proposed project would construct a clubhouse building which would include leasing/management offices, a resident lounge and business center, game room, and fitness room. The project would also include a community swimming pool and spa, outdoor seating areas, a tot lot play area, and a dog park. The project would improve and expand the existing adjacent off-site walking trails on the Ohlone College District's (District) Newark Center Campus. A stormwater treatment area would be constructed in the southeastern corner of the project site. Other utility improvements would include water and wastewater treatment connections to existing Alameda County Water District (ACWD) and Union Sanitary District (USD) infrastructure in the project vicinity and electrical connections to Pacific Gas & Electric (PG&E) infrastructure. Solid waste and recycling would be provided by Republic Services. The project would include construction of a total of 718 on-site parking spaces, including 509 garage and 39 covered spaces for residents and 170 surface parking spaces for guests. Primary vehicular access to the project site would be provided by a gated and paved 26-foot-wide road from Cherry Street to the northeast. A secondary access road and/or emergency vehicle access (EVA) road may be constructed from Mowry Avenue to the southwest. A 26-foot-wide road would be constructed in the southwest corner of the project site to provide circulation with the District’s proposed Newark Center Student Housing Project immediately northwest of the proposed project.

Similar Contracts

Same NAICS industry code

NAICS: 236116
New
SLED
The Bloc
Solicitation # CPC-2021-9959-TDR-SPR, ENV-2021-9959-EIR
The Bloc project, managed by the Los Angeles Department of City Planning under solicitation numbers CPC-2021-9959-TDR-SPR and ENV-2021-9959-EIR, involves the expansion of a mixed-use development located at 700 South Flower Street, 700 West 7th Street, and 711 South Hope Street. The scope of work includes the construction of a residential tower with up to 466 units, the addition of two above-ground parking levels atop the existing nine-story podium building, and the enclosure of the existing rooftop parking level. To accommodate the new tower, 24,342 square feet of existing theater and retail space within the podium will be demolished. The final development will span a 4.3-acre site with a total floor area of 1,894,988 square feet and reach a maximum height of 710 feet, or 53 stories. Additionally, the project establishes a Sign District featuring digital displays, supergraphics, and various on- and off-site signage. The project has been processed in accordance with the California Environmental Quality Act, with the Los Angeles City Council granting approval on September 16, 2025. The project is subject to a certified Environmental Impact Report and the adoption of a mitigation reporting and monitoring plan to address significant environmental effects. Key administrative contacts include City Planner Kathleen King and Project Applicant Dan Cote. The development integrates with existing site structures, which currently include a 26-story hotel and a 33-story office building.
City of Los Angeles

POSTED

1 day ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS