Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Micro-Community Projects

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sacramento is advancing three micro-community projects aimed at addressing homelessness among seniors aged 55 and older, each featuring prefabricated 120-square-foot housing units supported by essential on-site amenities. Project Site 1 includes 40 units, six ADA-compliant shared bathrooms, one additional two-stall bathroom, two laundry facilities, an outdoor dining area with cooking equipment, and a 2,700-square-foot dog run, with unit pads elevated three feet above ground level using ground screws to mitigate flood risk in a designated FEMA floodplain. Project Site 2 comprises 28 units, three ADA-compliant bathrooms, two two-stall bathrooms, two laundry facilities, and an outdoor dining area, with a designated dog run on the southwestern side. Project Site 3 includes another 40 units, four ADA-compliant bathrooms, one two-stall bathroom, two laundry facilities, an outdoor dining area, and a 2,800-square-foot dog run with an optional kennel nearby. All sites will incorporate parking, landscaping, and utility improvements. Residents are permitted to have up to two small or one medium dog or cat, provided the animals are registered, vaccinated, and spayed or neutered at no cost to the resident. Dogs must be leashed at all times, and animal waste must be collected daily by residents and staff and disposed of in sealed containers. Common amenities across all sites include shared bathrooms with ADA features, laundry facilities, and outdoor dining spaces equipped with sinks and electric cooking devices. The development is part of a broader city initiative to provide safe, stable housing for unhoused seniors while accommodating pet companionship through structured and sanitary pet management protocols. All projects are scheduled under the City of Sacramento’s planning framework with contact points for inquiries directed to the Facilities Manager and Principal Planner.

General Info

Sacramento builds micro-communities with 108 prefab units for unhoused seniors 55+, pet-friendly, ADA bathrooms, laundry, dining, and flood-elevated pads.

Agency

California → City of Sacramento

NAICS

236116 - New Multifamily Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

(1)

City of Sacramento Micro-Community Projects Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Sacramento
Office AddressN/A
Contacts
James ChristensenFacilities Manager
Scott JohnsonPrincipal Planner

Full Description

Show more
The proposed projects are a part of the City's efforts to address homelessness within Sacramento. Each proposed project would include the development of a "micro-community" for unhoused seniors (aged 55 years and older) that would include 120-sf prefabricated units as well as various associated on-site amenities, such as shared bathrooms, gathering space, and dog-run areas, as discussed in further detail below. Pets would be limited to two small or one medium dog or cat per resident and would be required to be registered, vaccinated, and spayed/neutered. Such services would be provided free to residents. Project Site 1 The proposed project would include the development of a "micro-community" for seniors with a total of 40, 120-sf prefabricated units. The project would also include six shared bathrooms which would each include an Americans with Disabilities Act (ADA)-compliant shower, lavatory, and toilet; one shared two-stall bathroom; and two shared laundry facilities. An outdoor dining area with a sink, two electric cooking devices, and seating would be provided. A 2,700-sf dog run would be included on the southeastern portion of the site. A portion of Project Site 1 is located within a FEMA floodplain. Thus, development of Project Site 1 would include elevating the micro-community unit pads above the base flood elevation using ground screws to reduce risk of flooding. The ground screws would be installed along the perimeter of the proposed units and would raise the units approximately three feet above ground level. The existing utility shed, utility pole, and trees would remain as is. Project Site 2 The proposed project would include the development of a "micro-community" for seniors with a total of 28, 120-sf prefabricated units. The proposed project would also include three shared bathrooms which would each include an ADA-compliant shower, lavatory, and toilet; two shared two-stall bathrooms; and two shared laundry facilities. An outdoor dining area with a sink, two electric cooking devices, and seating would be provided. A dog run would be included on the southwestern portion of the site. Pets would be limited to two small or one medium dog or cat per resident and would be required to be registered, vaccinated, and spayed/neutered. Such services would be provided free to residents. Project Site 3 The proposed project would include the development of a "micro-community" for seniors with a total of 40, 120-sf prefabricated units. The proposed project would also include four shared bathrooms which would each include an ADA-compliant shower, lavatory, and toilet; one shared two-stall bathroom; and two shared laundry facilities. An outdoor dining area with a sink, two electric cooking devices, and seating would be provided. A 2,800-sf dog run would be included on the northwestern portion of the site. An optional kennel located south of the dog run would be provided as well. Development of all three project locations would also include associated parking and access, landscaping, and utility improvements. Dogs would be required to be leashed at all times. Animal waste would be collected and disposed of in sealed containers daily by residents and on-site staff.

Similar Contracts

Same NAICS industry code

NAICS: 236116
New
SLED
The Bloc
Solicitation # CPC-2021-9959-TDR-SPR, ENV-2021-9959-EIR
The Bloc project, managed by the Los Angeles Department of City Planning under solicitation numbers CPC-2021-9959-TDR-SPR and ENV-2021-9959-EIR, involves the expansion of a mixed-use development located at 700 South Flower Street, 700 West 7th Street, and 711 South Hope Street. The scope of work includes the construction of a residential tower with up to 466 units, the addition of two above-ground parking levels atop the existing nine-story podium building, and the enclosure of the existing rooftop parking level. To accommodate the new tower, 24,342 square feet of existing theater and retail space within the podium will be demolished. The final development will span a 4.3-acre site with a total floor area of 1,894,988 square feet and reach a maximum height of 710 feet, or 53 stories. Additionally, the project establishes a Sign District featuring digital displays, supergraphics, and various on- and off-site signage. The project has been processed in accordance with the California Environmental Quality Act, with the Los Angeles City Council granting approval on September 16, 2025. The project is subject to a certified Environmental Impact Report and the adoption of a mitigation reporting and monitoring plan to address significant environmental effects. Key administrative contacts include City Planner Kathleen King and Project Applicant Dan Cote. The development integrates with existing site structures, which currently include a 26-story hotel and a 33-story office building.
City of Los Angeles

POSTED

1 day ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS