Albee Creek Campground Water Plant Upgrades
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Albee Creek Campground Water Plant Upgrades project, managed by the California Department of Parks and Recreation, aims to improve electrical service efficiencies at the Humboldt Redwoods State Park water treatment plant. The scope of work includes demolishing an existing shed, pouring a new 20-by-30-foot concrete slab for water tank reinstallation, and constructing a new 10-by-12-foot electrical shed. Additional infrastructure improvements involve excavating a 400-foot trench between the water plant and Combo Building 1 to install a 2-inch PVC electrical conduit and a 3-inch HDPE waterline. The project also requires the installation of a new 550-gallon water tank located between the treatment plant and the existing sand filtration tanks.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
