Alvarez Stream Crossing and Pond Decommissioning Project (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-42771-R1C)
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
NAICS
N/A
Place of Performance
approximately 10.7 miles north of the town of Redwood Valley, CASet-Aside
NONE
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Full Description
Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-42771-R1C, pursuant to Section 1602 of the Fish and Game Code to Jose Alvarez.
The Project is limited to two encroachments. The first encroachment is to perform maintenance on an existing low water crossing on Long Branch Creek. Maintenance at this crossing will consist of installing three rock rolling dips on the eastern approach to the crossing and rocking 100 feet of both road approaches with 4-inch minus rock. The rock rolling dips shall be located at 120 feet, 180 feet, and 220 feet up the eastern approach. The existing crossing approaches shall be maintained by the Permittee at the beginning of each dry season, as needed, to create a drivable slope to facilitate use of the crossing. Vehicles shall not be operated on the crossing when surface water is present.
The other proposed encroachment is to remediate and decommission an existing hydrologically connected pond. Excavated material that was side cast onto a slope above a stream to the north of the pond shall be pulled back away from the stream and back into the pond following the Unstable fill removal and treatment Best Management Practice (BMP) document provided with the Notification. The excavated material will then be compacted and revegetated. The berm of the pond has a shallow U-shape referred to as the the chute in the Notification. The chute will be reconstructed, with the lowest part of the U-shape being one foot lower than the sides. The chute and reconstructed slopes leading downslope into the stream shall be no steeper than a 2:1 slope. Jute netting and seed shall be applied for erosion control. Permittee shall use the seed mix specified in the project description in the Notification. Once the pond is filled, the decommissioned pond area shall be planted with appropriate species as described in the Notification. The rush species shall be planted in December or January following project implementation once the soil is saturated beyond the first several inches.