Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Arioto-Cress New Pier (Lake Alteration Agreement EPIMS Notification No. PLA- 65204-R2)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife, Region 2, has executed Lake Alteration Agreement EPIMS Notification Number PLA-65204-R2 for the construction of a new residential pier for applicant Lee Arioto. Located at Lake Tahoe in Placer County, California, the project is classified under NAICS code 237990. The project is exempt under California Code of Regulations title 14, sections 15303 and 15304, as it involves a small accessory residential structure and minor alterations without the removal of mature trees. The scope of work includes a pier extending approximately 114.6 feet, featuring a 6-inch-thick concrete landing with steel steps and a causeway that widens from 8 feet to 15 feet. The pierhead measures 15 feet wide by 45 feet long and includes two adjustable catwalks measuring 3 feet wide by 30 feet long. Construction requires driving eighteen 10-3/4 inch diameter steel hollow tube pilings into the lakebed, including two pilings for public access stairs. Additionally, the project incorporates 18 square feet of fish habitat enhancement through the construction of two 9 square foot clean gravel and cobble pyramids on the north and south sides of the pier.

General Info

Lee Arioto to build 114.6-foot residential pier with habitat enhancement, approved by California Fish and Wildlife.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
Contacts
Patrick MoeszingerSenior Environmental Scientist, Specialist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake Alteration Agreement EPIMS Notification Number PLA-65204-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Lee Arioto. The project is limited to the construction of a new residential pier. The pier will extend approximately 114.6 feet, plus an additional 4.33 feet for a 6-inch-thick concrete landing with steel steps. The pier causeway is 8 feet-wide widening to 15 feet-wide, along with two (2) adjustable catwalks 3 feet-wide by 30 feet-long at the lakeward end of the pierhead. The pierhead is 15 feet-wide by 45 feet-long. Eighteen (18) 10-3/4” diameter steel hollow tube piling will be driven into the lakebed, including two (2) piling for the public access stairs spanning the pier. The project includes 18 square feet of fish habitat enhancement, consisting of two (2) 9 square foot clean gravel and cobble pyramids constructed on the north and south sides of the pier.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS