Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Arioto-Cress New Pier (Lake Alteration Agreement EPIMS Notification No. PLA- 65204-R2)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife, Region 2, has executed Lake Alteration Agreement EPIMS Notification Number PLA-65204-R2 for the construction of a new residential pier for applicant Lee Arioto. Located at Lake Tahoe in Placer County, California, the project is classified under NAICS code 237990. The project is exempt under California Code of Regulations title 14, sections 15303 and 15304, as it involves a small accessory residential structure and minor alterations without the removal of mature trees. The scope of work includes a pier extending approximately 114.6 feet, featuring a 6-inch-thick concrete landing with steel steps and a causeway that widens from 8 feet to 15 feet. The pierhead measures 15 feet wide by 45 feet long and includes two adjustable catwalks measuring 3 feet wide by 30 feet long. Construction requires driving eighteen 10-3/4 inch diameter steel hollow tube pilings into the lakebed, including two pilings for public access stairs. Additionally, the project incorporates 18 square feet of fish habitat enhancement through the construction of two 9 square foot clean gravel and cobble pyramids on the north and south sides of the pier.

General Info

Lee Arioto to build 114.6-foot residential pier with habitat enhancement, approved by California Fish and Wildlife.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
Contacts
Patrick MoeszingerSenior Environmental Scientist, Specialist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake Alteration Agreement EPIMS Notification Number PLA-65204-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Lee Arioto. The project is limited to the construction of a new residential pier. The pier will extend approximately 114.6 feet, plus an additional 4.33 feet for a 6-inch-thick concrete landing with steel steps. The pier causeway is 8 feet-wide widening to 15 feet-wide, along with two (2) adjustable catwalks 3 feet-wide by 30 feet-long at the lakeward end of the pierhead. The pierhead is 15 feet-wide by 45 feet-long. Eighteen (18) 10-3/4” diameter steel hollow tube piling will be driven into the lakebed, including two (2) piling for the public access stairs spanning the pier. The project includes 18 square feet of fish habitat enhancement, consisting of two (2) 9 square foot clean gravel and cobble pyramids constructed on the north and south sides of the pier.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS