Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Clearwell Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Clearwell Replacement Project, managed by the SWRCB Division of Drinking Water District 14 for the City of Poway, involves the comprehensive replacement of the 10 MG clearwell at the Lester J. Berglund Water Treatment Plant in Poway, California. The scope of work includes replacing the existing floating cover, liner, overflow structure, and appurtenances, with the final clearwell replacement consisting of two 4 MG prestressed concrete tanks. To maintain operations during construction, a temporary bypass system will be implemented, featuring two 1.4 MG above ground storage tanks at the Lake Poway Recreation Area softball field, an above ground pump station at the plant, and associated pipelines. Additionally, a permanent underground bypass pipeline will be installed between the plant and the Lake Poway Road Transmission Main. This project is currently categorized as a forecast under NAICS code 237990, with a posted date of June 29, 2026. It has been granted a Notice of Exemption under Class 2 and Class 11 Categorical Exemptions of the California Code of Regulations, as the work involves replacement without capacity expansion and the use of temporary accessory structures. All temporary facilities are slated for removal upon project completion. The primary point of contact for the project is District Engineer Joseph Guzman.

General Info

Replace aging clearwell with two new 4M-gal tanks, install temporary bypass and permanent pipeline, then remove all temporary structures.

Agency

California → SWRCB, Division of Drinking Water, District 14

Place of Performance

Poway, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Drinking Water, District 14
Contacts1 person available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Drinking Water, District 14
Office AddressN/A
Contacts
Joseph GuzmanDistrict Engineer

Full Description

Show more
Project consists of the replacement of the existing floating cover, liner, overflow structure and appurtenances for the 10 MG clearwell at the Lester J. Berglund Water Treatment Plant (WTP). Additionally, a permanent underground bypass pipeline will be installed between the WTP and the Lake Poway Road Transmission Main. As part of this project, a temporary bypass system will be built to divert treated water during replacement of the 10 MG clearwell. Temporary facilities include two 1.4 MG above ground storage tanks located at the Lake Poway Recreation Area softball field, an above ground pump station at the WTP, and related above ground pipelines. The clearwell replacement will consist of two 4 MG prestressed concrete tanks. Following completion of the Project, the temporary facilities will be removed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS