Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

SILVER SPRINGS TENTATIVE SUBDIVISION

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized a Streambed Alteration Agreement for the SILVER SPRINGS TENTATIVE SUBDIVISION project under section 1602 of the Fish and Game Code, granting approval to the True Life Companies for modifications to Green Spring Creek. The approved work includes constructing two concrete free-span bridges with steel components, concrete footings, headwalls, and retaining walls to cross the creek, alongside five High-Density Polyethylene storm drainpipe outfalls linked to roadway and drainage systems within a single-family residential development comprising 101 lots. These alterations are intended to support infrastructure needs while managing creek flow and stormwater runoff. The project is managed through El Dorado County, with environmental oversight provided by the California Department of Fish and Wildlife, and all correspondence and compliance matters should be directed to Caitlyn Oswalt, Environmental Scientist, or Amelia Pedri of the county planning department. The agreement was officially posted on June 29, 2026, as a forecast notification, and no solicitation or procurement process is currently active. The project location is within California, and all work must adhere to the conditions outlined in the authorized Streambed Alteration Agreement to minimize impacts on aquatic habitats and maintain regulatory compliance.

General Info

True Life Companies approved to build bridges and storm drains across Green Spring Creek for 101-lot subdivision.

Agency

California → El Dorado County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Silver Springs Units 2A and 3 Streambed Alteration Agreement ELD-52171-R2

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado County
Contacts2 people available
OfficeN/A
Organization / Agency
California → El Dorado County
Office AddressN/A
Contacts
Caitlyn OswaltEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number ELD-52171-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the True Life Companies. The project is limited to two concrete free-span concrete and steel bridge including concrete footings, headwalls, and retaining wall that will span an existing channel of Green Spring Creek, and 5 High-Density Polyethylene (HDPE) storm drainpipe outfalls associated with roadways and drainage infrastructure within a 101 single-family residential development.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. The scope of work includes dredging within federal jurisdiction to a depth of -12 feet Mean Lower Low Water with a 1-foot overdepth, involving the removal and ocean disposal of gravel, sand, silt, and clay. Additionally, the project requires revetted mole repairs, which encompass clearing and grubbing, CRM wall repair, tree and vegetation removal, and the reworking or installation of stone to fill voids. The performance period is 200 calendar days from the notice to proceed. The solicitation is an invitation for bid under NAICS code 237990, with a response deadline of September 30, 2026. Bids must be submitted in sealed envelopes, as electronic submissions are not permitted. Evaluation is based on a pass/fail gate for compliance and completeness, with a bid guarantee required at 20 percent of the bid price or 3 million dollars, whichever is less. The contract emphasizes strict quality management, requiring the use of the USACE National Dredging Quality Management Program and a physical on-site presence for the Quality Control Manager. Payment will be processed through the USACE Finance Center, and the project must adhere to EM 385-1-1 safety requirements and specific environmental protections for the Hawaiian hoary bat pupping season.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 12 hours ago

DEADLINE

in 13 days
View Details