Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Watson Water Diversion Removal and Stream Crossing Project (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-65336-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized James Watson to proceed with two controlled streambed alterations under EPIMS Notification No. EPIMS-MEN-65336-R1C. The first alteration involves upgrading an existing 12-inch culvert to a 24-inch diameter culvert, including complete removal of the old structure, excavation, backfilling, compaction, and rock armoring to prevent erosion. Concurrently, approximately 25 feet of stream channel directly upstream will be restored by removing 2.31 cubic yards of accumulated sediment and reshaping the streambed to a 6-inch width and 1-foot depth with 2:1 side slopes. The second alteration entails the decommissioning of obsolete water diversion infrastructure, requiring removal of a 55-gallon barrel and between 0.65 and 1.3 cubic yards of fill material from the stream, with a minimal disturbance footprint of about 12 square feet. All work is limited in scope and designed to reduce environmental impact while improving stream hydrology and habitat conditions. The project is managed by the California Department of Fish and Wildlife, Region 1 - Northern Region, with Penny Lancaster serving as the primary point of contact.

General Info

James Watson to upgrade culvert, restore stream channel, and remove obsolete diversion infrastructure under CDFW authorization.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

approximately 8.8 miles north of the town of Laytonville, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-65336-RIC Notice of Exemption for Watson Water Diversion Removal

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Penny LancasterEnvironmental Scientist
James WatsonPlease contact Penny Lancaster of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS- MEN-65336-R1C, pursuant to Section 1602 of the Fish and Game Code to James Watson. The Project is limited to two encroachments. One encroachment is to upgrade an existing 12-inch diameter stream crossing culvert to a 24-inch diameter culvert and restore approximately 25 feet of stream channel directly above the culvert. Work for this encroachment will include excavation, removal of the existing culvert, replacement with a new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Restoration of the 25-foot length of stream channel immediately upstream of the culvert will consist of removal of approximately 2.31 cubic yards of aggraded sediment and shaping of a new streambed 6-inches wide and 1-foot deep with 2:1 slopes. The second encroachment is to decommission water diversion infrastructure. Work will consist of removing a 55-gallon barrel and approximately 0.65-1.3 cubic yards of fill from a stream, with a disturbance footprint of approximately 12 square feet.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid by the U.S. Army Corps of Engineers Honolulu District, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, under NAICS code 237990. Key requirements include adherence to USACE EM 385-1-1 safety standards, Davis-Bacon Act prevailing wages, and specific ASTM standards for stone materials. Awardees must provide a project manager, superintendent, quality control manager, and a site safety and health officer. The contract includes liquidated damages of 2,297 dollars per calendar day of delay and requires a bid guarantee as well as performance and payment bonds. Invoicing is conducted monthly, with a requirement to provide a breakdown of job pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
International
Port Repairs at Bella Bella facility British Columbia
Solicitation # T8080-260226
Transport Canada is soliciting offers under solicitation T8080-260226 for priority structural repairs at the Bella Bella Public Port Facility in British Columbia. The project aims to address critical deficiencies identified in the 2024 Routine Detailed Inspection by restoring the structural integrity of the approach and wharf head, replacing bearing piles, cross braces, mid-rails, and safety ladders, and reinstating pile cap connections. The objective is to mitigate urgent safety risks, ensure continued vessel access and community use, and extend the facility's functional service life. Field work is anticipated to begin in Fall 2026 and must be completed by December 1, 2026, with all final deliverables and close-out documentation due by December 31, 2026. The contract will be awarded based on a trade-off model considering the highest combined rating of technical merit and price, weighted at 60 percent and 40 percent respectively. To be compliant, offerors must meet all Mandatory Technical Criteria, including the provision of a detailed work plan and two marine repair client references from the last five years. Technical merit is further evaluated through point-rated criteria focusing on schedule alignment and resource allocation. The agreement is structured as an implied firm fixed price contract with a lump sum payment basis. The government retains sole responsibility for inspection and acceptance at the destination in the National Capital Region. Contractors must adhere to strict integrity and ethics requirements, including compliance with anti-forced labour regulations and international sanctions.
Department of Transport

POSTED

about 20 hours ago

DEADLINE

in 18 days
View Details