Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Assessing New Electricity Rate Structures to Support LDES systems that operate for 8 or 12 hours

Forecast
300-25-009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Aspen will support the California Energy Commission in evaluating and validating new revenue pathways and financing models designed to enable the deployment of long-duration energy storage systems that provide 8 to 12 hours or more of continuous service to the state’s electrical grid. The work focuses on moving beyond the current industry standard of four-hour storage by identifying economic structures that properly value the unique grid services these longer-duration systems provide, such as extended reliability, resilience, and capacity during multi-hour peak events or prolonged renewable intermittency. This effort is foundational to creating fair and sustainable payment mechanisms that reflect the true economic value of long-duration storage, enabling broader commercial adoption and integration. The project will inform the CEC’s collaboration with the California Public Utilities Commission and the California Independent System Operator to modernize the state’s energy storage compensation frameworks, ensuring future regulatory and market rules accommodate emerging LDES technologies. The results will directly influence the design of new rate structures and incentive programs that make long-duration storage financially viable and attractive to investors and developers. The work will be conducted primarily in Sacramento, California, with primary contact from the Energy Commission’s Senior Engineer Michael Gravely and Aspen’s Project Manager Tom Murphy, and is part of a broader strategic push to future-proof California’s electricity infrastructure for deep decarbonization and grid stability.

General Info

Aspen supports CEC in developing fair payment models for 8–12 hour energy storage to enable grid resilience and investor adoption.

Place of Performance

Folsom Blvd and Watt Ave, Sacramento, CA, 95826

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
Aspen will assist the California Energy Commission in identifying, validating, and stress-testing revenue pathways and financing structures that can support the deployment of long-duration energy storage (LDES) technologies that provide approximately 8 to 12 hours and longer durations of service to the California grid. This information is critical to allow these LDES systems to received future payments for the services they provide that exceed the current standard of four hours. This knowledge will allow the CEC to work with the CPUC and CAISO to update the energy storage revenue options the State offers for all emerging LDES technologies so these technologies can be integrated into the California Electric Grid of the future.

Similar Contracts

Same NAICS industry code

More opportunities from California → Energy Commission

Same awarding agency

NAICS: 541715
SLED
Advanced Energy-efficient and Fire-resistive Envelope Systems Utilizing Vacuum Insulation for Manufactured Homes (REVISED)
Solicitation # EPC-19-043
The California Energy Commission has awarded a contract for the project titled Advanced Energy-efficient and Fire-resistive Envelope Systems Utilizing Vacuum Insulation for Manufactured Homes. This research initiative aims to demonstrate the effectiveness of advanced insulation and air sealing technologies, specifically vacuum insulated panels, to improve the overall energy performance of all-electric manufactured accessory dwelling units. The project begins with laboratory testing in Berkeley, California, to evaluate thermal performance, followed by the design and construction of up to three prototype single-family homes. These prototype units will be built in Altadena, Los Angeles County, on lots previously affected by the 2025 fires. Managed by the Energy Commission with project oversight from Dr. Kaushik Biswas and Jeanie Mar, the initiative focuses on utilizing prefabricated envelope systems and state-of-the-art air sealing to benefit current and future manufactured home communities. The project has been granted a CEQA Notice of Exemption, as the laboratory research and prototype construction are determined to have no significant environmental impact. This comprehensive effort combines theoretical lab validation with real-world application to advance energy efficiency and fire resistance in manufactured housing.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
Corby Battery Energy Storage System Project
Solicitation # 24-OPT-05
North Bay Interconnect, LLC and Corby Energy Storage, LLC are proposing the construction and operation of the Corby Battery Energy Storage System (BESS) Project in Solano County, California. The facility will feature a 300-megawatt, 1,200-megawatt-hour system utilizing LG Energy Solution lithium-ion batteries. The project site encompasses approximately 40.3 acres and includes a project substation, inverters, and ancillary infrastructure such as sound barriers, stormwater retention basins, and a SCADA system. Interconnection to the Pacific Gas and Electric Company Vaca-Dixon Substation will be achieved via a 1.1-mile, 230-kilovolt generation tie line consisting of both overhead and underground segments. The initial installation will include 303 BESS enclosures, with planned augmentations every three years starting around year six to maintain output, eventually reaching up to 341 enclosures. The project is overseen by the California Energy Commission and is subject to rigorous environmental and regulatory compliance, including the California Environmental Quality Act and Assembly Bill 205 regarding prevailing wages and a skilled workforce. Construction is estimated to take 14 to 15 months. Technical standards for the build follow a comprehensive list of codes including NFPA, ANSI, and ASME, with oversight provided by a Delegate Chief Building Official and a Safety Monitor to ensure Cal OSHA compliance. Hazardous materials transportation must adhere to DOT and PHMSA regulations. The project involves a minimum investment of 100 million dollars in California and has undergone extensive review by agencies such as the California Department of Fish and Wildlife and the Native American Heritage Commission to mitigate impacts on special-status species and tribal cultural resources.
Power and Communication Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541715
SLED
Composite WiRe Wrap: Advancing Grid Capacity and Wildfire Safety in California
Solicitation # EPC-25-056
The California Energy Commission is funding applied research and development for GirdWrap, Inc.’s Composite WiRe Wrap technology, aimed at enhancing the power capacity, structural integrity, and wildfire safety of existing electrical grid infrastructure. This innovation allows for direct installation on current power lines, increasing transmission capacity and resilience without the need for expensive and time-consuming full-scale rebuilds. The project addresses critical challenges facing California’s grid, including congestion, renewable curtailment, and the urgent need to integrate growing volumes of renewable energy and electric loads while reducing costs driven by wildfire mitigation. The solution supports statewide energy and climate goals by enabling cost-effective grid modernization that improves reliability and affordability for ratepayers. As part of the initiative, a twelve-month large-scale pilot test will be conducted at two demonstration sites managed by San Diego State University to validate the technology’s performance under real-world environmental conditions. The pilot will assess the composite wrap’s effectiveness in boosting power delivery, structural performance, and safety in the context of California’s unique climate and wildfire risks. The project underscores a strategic effort to deploy scalable, low-cost grid upgrades that accelerate clean energy adoption and enhance system resilience. Alexander Wyckoff of the California Energy Commission serves as the primary point of contact, with Talieh Zargar, CTO and Co-Founder of GirdWrap, Inc., as a key technical lead.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS