Atascadero Mutual Water Company Water Treatment Plant Project

Forecast
DEV24-0084State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Atascadero Mutual Water Company Water Treatment Plant Project, identified as Project No. DEV24-0084, involves the construction of a groundwater treatment facility in San Luis Obispo County, California. Located within the existing AMWC Corporation Yard at the northwest corner of the State Route 41 overpass over Sycamore Road, the plant is designed to treat per- and polyfluoroalkyl substances detected in production wells adjacent to the Salinas River. The project is planned in two phases, with Phase I currently proposed to meet a peak summer demand of 8.1 million gallons per day, with a future upgrade path to 12 million gallons per day in Phase II. The facility will feature treatment vessels in the open air, various components under metal canopies, and a 3,800 square foot prefabricated metal Operations Center. Additional infrastructure includes chemical storage with covered chain-link fencing, downward-facing pole-mounted and LED lighting, and native landscaping. Due to geotechnical conditions, the project requires ground improvements such as over-excavation and rapid impact compaction. Environmental review under the California Environmental Quality Act concluded with a Mitigated Negative Declaration, certifying that the project will not have a significant effect on the environment. Key compliance requirements include nesting bird surveys, cultural resource monitoring, and a mandatory noise assessment prior to final inspection to ensure nighttime exterior noise levels do not exceed 45 dBA.

General Info

AMWC groundwater treatment plant construction in California to remove PFAS from production wells.

Place of Performance

S.R. 41 at Sycamore Road, Atascadero, CA, 93422

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Atascadero
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Kelly GleasonPlanning Manager
John NeilGeneral Manager
Ethan KnoxEnvironmental Planner

Interested Companies (1)

Rincon ConsultantsMonterey, CA

Full Description

Show more
The proposed Atascadero Mutual Water Company (AMWC) Water Treatment Plant (WTP) project involves construction of a facility to treat for per- and polyfluoroalkyl substances detected within the AMWC production wells located adjacent to the Salinas River between State Route 41 and Chico Road. The WTP would be located within a portion of AMWC’s existing Corporation Yard at the northwest corner of the overpass of State Route 41 over Sycamore Road. Several components of the WTP would be located under metal canopies, the treatment vessels would be located in the open air, and the Operations Center would be enclosed in a prefabricated metal building that would be about 20 feet in height and approximately 3,800 square feet in size. Chemical storage facilities would be located under a metal canopy with covered chain-link fencing surrounding the chemical containment areas. The project includes installation of new outdoor lighting, including downward-facing pole-mounted lights and chain-mounted LED lights under canopies (shielded by quarter-height panels). Native landscape plants would be placed along the Sycamore Road frontage. Due to existing geotechnical conditions at the project site, ground improvements including over-excavation of materials, rapid impact compaction, and reconstruction of the over-excavation materials into a structural backfill would be conducted in certain areas to densify the ground beneath the project site and improve the soil conditions to be suitable for the proposed project. The proposed project would not result in increased groundwater extraction from AMWC’s production wells beyond baseline conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
CPK2504 - Eldridge Park Improvements
Solicitation # 2026-ITB-049
The City of Sugar Land has issued Invitation for Bid 2026-ITB-049 for the Eldridge Park Improvements project located at 2511 Eldridge Rd, Sugar Land, TX. The scope of work requires all labor, materials, and supervision to complete a Base Bid consisting of site preparation, tree protection, selective demolition, parking lot pavement and curb construction, waterline installation and connection to the City main, irrigation, grading, hydroseeding, ADA-compliant sidewalks, playground walls, and dumpster enclosure renovation. Additionally, the project includes two optional add-alternates: Add Alternate 1 for building improvements and Add Alternate 2 for the construction of a 210 by 345 foot synthetic turf field featuring an underground detention system, fencing, and furnishings. Bids must be submitted electronically via the OpenGov procurement portal by November 12, 2026, at 11:00 am. Respondents are required to submit a detailed bid pricing form covering the Base Bid, Owner Set Cash Allowances, and both Add Alternates, as well as complete a mandatory vendor questionnaire and acknowledge compliance with all insurance requirements. The selected contractor will be required to enter into the City of Sugar Land Standard Contract for Civil Engineering Construction Projects. The contract will be awarded by the City Council based on the terms provided in the Invitation to Bid.
Engineering

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
PIER B ON-DOCK RAIL SUPPORT FACILITY RAIL YARD ACCESS IMPROVEMENTS
Solicitation # HD-S3215
Solicitation HD-S3215, issued by the Long Beach Harbor Department for the Port of Long Beach, covers rail yard access improvements for the Pier B On-Dock Rail Support Facility. The scope of work includes the realignment, relocation, resurfacing, and rehabilitation of existing railroad tracks and the construction of new lead tracks within the Pier B rail yard and Pico Avenue corridor. Key technical requirements involve the installation of new railroad signal systems, modification of the signal system at CP Gaspur, and the implementation of special trackwork such as turnouts and crossovers. The project also encompasses extensive demolition of tracks, pavement, and utilities, as well as earthwork, grading, storm drain improvements, and the relocation of street lighting, all phased around active railroad operations. The contract requires strict adherence to AREMA manuals and CPUC General Orders, with a heavy emphasis on quality control and safety. Deliverables include a Site-Specific Safety Plan, a Railroad Work Plan, and certified Acceptance Test Reports, with testing for equipment and cabling performed by a NETA-certified independent agency. Bidders must submit electronic bids through the Port of Long Beach PB System, including a comprehensive proposal package and an SBE/VSBE Commitment Plan. The project is subject to various federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Americans with Disabilities Act. Performance security is required in the form of payment and performance bonds for 100% of the contract price, and bid security must be at least 10% of the base bid.
Port of Long Beach

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
46108 CONSTRUCTION
Solicitation # 46108-C
Project No. 46108-C is a unit price construction contract for the Cayuga Inlet Flood Risk Reduction and Restoration project located at 900 Taber Street in Ithaca, New York. Issued by the New York State Department of Environmental Conservation and the Office of General Services, the project has an estimated value between 23 million and 24 million dollars. The scope of work encompasses comprehensive site preparation, earthwork, and hydraulic dredging operations, including the management of filtrate from geotextile tube dewatering and the off-site disposal of organic, dredge, and construction debris. Key deliverables include a Marine Traffic Control Plan, daily hydraulic dredge reports, and detailed subsurface investigation reports. The project also requires pre-construction and progress bathymetric and topographic surveys, as well as the establishment of a site management facility for staging and spoil management. Bids are due by December 9, 2026, and must be submitted via Bid Express or as sealed paper bids to the Office of General Services in Albany. The contract will be awarded to the apparent low bidder based on a determination of bid responsiveness and bidder responsibility, which includes an evaluation of financial data, past performance on similar contracts, and the qualifications of key personnel such as the Project Manager and Site Safety Officer. Bidders must provide bid security of 599,200 dollars and, upon award, furnish performance and labor and material bonds for 100 percent of the contract price. Compliance with New York State Labor Law, prevailing wage schedules, and MWBE/SDVOB utilization plans is required. All imported materials must be approved by the Director's Representative and verified by a qualified geotechnical testing laboratory.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Freedom Park Boardwalk Repairs - Boardwalks 1 & 2
Solicitation # 26-8700
Solicitation 26-8700 is an invitation to bid issued by the Collier County Board of County Commissioners for the repair and restoration of Boardwalks 1 and 2, as well as Outlooks 1 and 2, at Freedom Park in Florida. The project has an anticipated budget of 1,300,000 dollars, which includes a 198,120 dollar Owner's Allowance for unforeseen conditions. The scope of work involves replacing deteriorated decking, structural supporting timber, fasteners, and hardware, as well as repairing damaged pilings and support beams. Technical requirements specify the use of IPE Wood and 5500 psi Type IV Portland Cement, with strict adherence to FDOT and ASCE standards and environmental protections for mangroves. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and selected alternates. Bidders must provide a 5% bid bond and, upon award, furnish performance and payment bonds for 100% of the contract amount. The project timeline mandates completion within 134 calendar days from the Notice to Proceed, with work generally limited to weekdays between 7:00 a.m. and 7:00 p.m. Bids must be submitted electronically via the OpenGov portal by November 13, 2026, at 3:00 p.m. Contractors are required to hold a valid State of Florida General Contractors or Building Contractor license and must comply with all Environmental, Health, and Safety requirements, including OSHA and EPA regulations.
Procurement

POSTED

about 20 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → City of Atascadero

Same awarding agency

NAICS: 237120
SLED
Atascadero Creek Lake Fill Pipeline Repair ProjectThe City of Atascadero is undertaking the Atascadero Creek Lake Fill Pipeline Repair Project to restore a pipeline that transports water from Atascadero Creek to Atascadero Lake during high-flow events. The project involves the replacement and repair of approximately 350 linear feet of degraded, sediment-impacted pipeline starting at the inlet, along with the repair of associated concrete hold-downs and maintenance of existing intake structures and diversion boxes. To achieve this, the project requires approximately 96 cubic yards of excavation to remove the old pipe and the removal of riparian vegetation adjacent to and above the pipeline. The new pipeline will be of equivalent capacity and installed in the same alignment as the existing one to ensure full functionality. Located at 9930 Carmelita Ave in San Luis Obispo County, the project has undergone environmental review in compliance with the California Environmental Quality Act. A Mitigated Negative Declaration was approved on August 18, 2026, following a public review period from July 2 to August 1, 2026. The environmental process addressed potential impacts on air quality, biological resources, and cultural resources, with mitigation measures implemented to reduce these impacts to less than significant levels. Key coordinating agencies include the U.S. Army Corps of Engineers and the California Department of Fish and Wildlife. Project administration is managed by the City of Atascadero, with primary points of contact including Associate Planner Erick Gomez, Planning Manager Kelly Gleason, and Associate Civil Engineer Joe Murphy.
Oil and Gas Pipeline and Related Structures Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS