Atascadero Mutual Water Company Water Treatment Plant Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Atascadero Mutual Water Company Water Treatment Plant Project, identified as Project No. DEV24-0084, involves the construction of a groundwater treatment facility in San Luis Obispo County, California. Located within the existing AMWC Corporation Yard at the northwest corner of the State Route 41 overpass over Sycamore Road, the plant is designed to treat per- and polyfluoroalkyl substances detected in production wells adjacent to the Salinas River. The project is planned in two phases, with Phase I currently proposed to meet a peak summer demand of 8.1 million gallons per day, with a future upgrade path to 12 million gallons per day in Phase II. The facility will feature treatment vessels in the open air, various components under metal canopies, and a 3,800 square foot prefabricated metal Operations Center. Additional infrastructure includes chemical storage with covered chain-link fencing, downward-facing pole-mounted and LED lighting, and native landscaping. Due to geotechnical conditions, the project requires ground improvements such as over-excavation and rapid impact compaction. Environmental review under the California Environmental Quality Act concluded with a Mitigated Negative Declaration, certifying that the project will not have a significant effect on the environment. Key compliance requirements include nesting bird surveys, cultural resource monitoring, and a mandatory noise assessment prior to final inspection to ensure nighttime exterior noise levels do not exceed 45 dBA.

General Info

AMWC groundwater treatment plant construction in California to remove PFAS from production wells.

Agency

California → City of Atascadero

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

S.R. 41 at Sycamore Road, Atascadero, CA, 93422

Set-Aside

NONE

Documents

(7)

SCH 2025111111 Atascadero Mutual Water Company Water Treatment Plant Project Memorandum

PDFmemorandum

Notice of Completion for Atascadero Mutual Water Company Water Treatment Plant Project

PDFnotice-of-completion

_LCI Addendum Letter

ZIP

Atascadero Mutual Water Company Water Treatment Plant Project Notice of Determination

PDFnotice-of-determination

Atascadero Mutual Water Company Water Treatment Plant Project Summary

PDFenvironmental-summary

Notice of Completion Attachment - Schools Near Project Site

PDFother

Atascadero Mutual Water Company Water Treatment Plant Project Mitigated Negative Declaration DEV24-0084

PDFmitigated-negative-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Atascadero
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Atascadero
Office AddressN/A
Contacts
Kelly GleasonPlanning Manager
John NeilGeneral Manager
Ethan KnoxEnvironmental Planner

Interested Companies (1)

Show more
Rincon Consultants
San Diego, California

Full Description

Show more
The proposed Atascadero Mutual Water Company (AMWC) Water Treatment Plant (WTP) project involves construction of a facility to treat for per- and polyfluoroalkyl substances detected within the AMWC production wells located adjacent to the Salinas River between State Route 41 and Chico Road. The WTP would be located within a portion of AMWC’s existing Corporation Yard at the northwest corner of the overpass of State Route 41 over Sycamore Road. Several components of the WTP would be located under metal canopies, the treatment vessels would be located in the open air, and the Operations Center would be enclosed in a prefabricated metal building that would be about 20 feet in height and approximately 3,800 square feet in size. Chemical storage facilities would be located under a metal canopy with covered chain-link fencing surrounding the chemical containment areas. The project includes installation of new outdoor lighting, including downward-facing pole-mounted lights and chain-mounted LED lights under canopies (shielded by quarter-height panels). Native landscape plants would be placed along the Sycamore Road frontage. Due to existing geotechnical conditions at the project site, ground improvements including over-excavation of materials, rapid impact compaction, and reconstruction of the over-excavation materials into a structural backfill would be conducted in certain areas to densify the ground beneath the project site and improve the soil conditions to be suitable for the proposed project. The proposed project would not result in increased groundwater extraction from AMWC’s production wells beyond baseline conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS