Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Backup Power Generation Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221111
SLED
Relicensing of Helms Pumped Storage ProjectThe project involves the relicensing of Pacific Gas and Electric Company’s Helms Pumped Storage Project under FERC No. 2735, with the goal of continuing operations while enhancing environmental protections and public access. PG&E seeks to maintain water transfers between Courtright Lake and Lake Wishon for power generation and storage, while replacing and rehabilitating recreation facilities, redesignating approximately 36 miles of roads and one mile of trails as official Project infrastructure, and adjusting the FERC Project boundary to better reflect operational needs. The Project includes underground tunnels, penstocks, a powerhouse, switchyard, transmission lines, and ancillary facilities, all situated within Fresno and Madera Counties along the North Fork Kings River. Environmental compliance is central to the license renewal, requiring adherence to a suite of state and federal regulations including the Clean Water Act, Endangered Species Act, and California Environmental Quality Act. Numerous condition-specific obligations are embedded in the licensing framework, enforced through detailed exhibits that serve as operational mandates rather than standard federal contract clauses. These include maintaining minimum water flows and quality, implementing adaptive management strategies, monitoring fish populations and hatchery performance, protecting endangered and threatened species, conducting archaeological surveys, controlling erosion, restoring disturbed areas, and limiting noise and seasonal operations. PG&E is responsible for annual reporting, public notifications, emergency response, cultural resource protection, wildlife habitat management, and providing public recreation access under approved plans. Oversight is coordinated by the State Water Resources Control Board, with key contacts for environmental compliance and project management provided. Submissions for environmental certification are due by December 19, 2025, and compliance is measured through annual reports and agency inspections rather than traditional procurement metrics. While no formal contract value, pricing structure, or acquisition type is specified, the project’s scope implies long-term operational and environmental management responsibilities spanning the lifetime of the new FERC license, with no indication of small business set-asides or socioeconomic classifications applying to the contractor.
State Water Resources Control Board

POSTED

about 1 month ago

DEADLINE

N/A
NAICS: 221111
SBIR / STTR
Energy Technologies
Solicitation # EN
The Energy Technologies solicitation seeks innovative proposals across a broad spectrum of energy generation, storage, and conversion systems with a focus on mobile and off-grid applications. It welcomes ideas that offer compelling advantages over existing solutions, particularly in emerging areas such as carbon conversion, disruptive improvements to conventional energy resources like natural gas extraction, and nature-inspired processes aimed at reducing carbon and resource intensity throughout the energy lifecycle. Proposals that integrate data and computational technologies with energy systems are strongly encouraged, especially where the synergy between digital innovation and energy application is central to the proposed solution. The scope spans from microscopic energy storage for wearable devices to large-scale power plant technologies, emphasizing technological scalability and sustainability. This is a small business set-aside opportunity under the SBIR/STTR mandate, restricted to organizations with fewer than 500 employees, and is classified under NAICS code 221111 for electric power generation. Managed by the National Science Foundation, the solicitation was posted on May 22, 2026, with a submission deadline of July 7, 2027. While no specific physical place of performance is required, applicants must demonstrate the potential for practical implementation and impact in the U.S. energy landscape. The initiative prioritizes breakthroughs that advance clean, efficient, and resilient energy technologies while fostering innovation within small businesses to address critical national energy challenges.
National Science Foundation

POSTED

3 months ago

DEADLINE

in 10 months
NAICS: 221111
SLED
Camp Far West Hydroelectric Relicensing Project
Solicitation # CFW-amend_2021100570_NOD_signed
The Camp Far West Hydroelectric Project, a 6.8-megawatt facility on the Bear River in Yuba County, California, operates under a revised water quality certification issued by the State Water Resources Control Board on October 22, 2025, amending the original certification dated May 16, 2022. The project includes Camp Far West Reservoir, dam, spillway, intake tower, powerhouse, switchyard, and two recreation areas, and the amendment primarily updates two conditions: Condition 2(D) concerning the evaluation of flows under State Clearinghouse Number 2021100570 and Condition 16 regarding the auxiliary spillway project under SCH No. 2018092009. The South Sutter Water District serves as the Lead Agency, with oversight and approval responsibilities resting with the State Water Resources Control Board, which determined that the amended certification complies with the California Environmental Quality Act, supported by a Negative Declaration finding no significant environmental impacts. There is no formal contract value, pricing structure, or procurement mechanism identified, as this is an environmental regulatory action rather than a federal procurement contract; consequently, no Federal Acquisition Regulation clauses, payment terms, invoicing systems, or contractor assessment criteria apply. Performance obligations center on continued compliance with revised flow conditions and spillway design standards to ensure water quality and ecological integrity, with no specified timeline for implementation or delivery milestones outlined. While physical access to supporting environmental documentation such as the Environmental Impact Report and Negative Declaration is available at the Water Rights Library in Sacramento, there are no formal packaging, inspection, acceptance, or reporting procedures defined within the regulatory amendment itself. Key point of contact for environmental compliance is James Kyle Noss, Environmental Scientist at the State Water Resources Control Board, and Hayden Cornwell of the South Sutter Water District, though neither is formally designated as a contracting officer or representative. The project operates under state environmental law and Federal Energy Regulatory Commission licensing, but no federal acquisition systems, contractual forms, clauses, or socioeconomic certifications are involved, distinguishing it from traditional contracting frameworks.
South Sutter Water District

POSTED

10 months ago

DEADLINE

N/A
NAICS: 221111
SLED
Yuba River Development Project and the Narrows Hydroelectric Project FERC Relicensings
Solicitation # 2025FG-00026
The Yuba County Water Agency is seeking relicensing from the Federal Energy Regulatory Commission for the Yuba River Development Project and the Narrows Hydroelectric Project for 50-year terms. Located across Yuba, Sierra, and Nevada Counties, the projects aim to ensure the continued operation and maintenance of hydropower facilities. While the Narrows Project requires no new facilities, the Yuba River Development Project includes the construction of a new Tailwater Depression System at the New Colgate Powerhouse, installation of outlet pipes at the Our House and Log Cabin Diversion Dams, and the replacement of a gate at the Lohman Ridge Diversion Tunnel. Additionally, the agency plans to enhance recreation at New Bullards Bar Reservoir by adding two campgrounds, a picnic site, and a trail. The projects are subject to rigorous environmental compliance under CEQA and NEPA, requiring adherence to the Clean Water Act Section 401 and the Federal Power Act Section 4(e). Key regulatory requirements include permits from the USACE, USFS, and CDFW. A Mitigation Monitoring and Reporting Program has been established to manage impacts on biological resources, including mandatory preconstruction surveys for semi-aquatic species and migratory birds, and strict prohibitions on heavy equipment operation in flowing water. Contractors must also implement utility coordination plans and follow the USFS Transportation System Management Plan for work on National Forest System lands. The project has undergone public review and received a Notice of Determination certifying that it will not have a significant environmental effect provided mitigation measures are adopted.
Yuba County Water Agency

POSTED

10 months ago

DEADLINE

N/A

AI Contract Overview

Show more

This contract involves the provision and maintenance of mobile or temporary backup power generation systems to ensure at least 95% uptime during power outages at LSA Lincoln. It is a subcontract opportunity released on June 5, 2026, with a response deadline set for June 19, 2026. The contract is designated as a Total Small Business Set-Aside under FAR 19.5, targeting small businesses that meet the SBA criteria. The work falls under the NAICS code 221111, which pertains to electric power generation, transmission, and distribution. The contract is issued by the Department of Defense through the W7M1 Uspfo Activity Dc Arng agency, with the place of performance identified as North Pole. Potential contractors must ensure reliable power backup solutions to maintain critical operations in the event of outages, reflecting the government’s focus on operational continuity and resilience in key defense installations.

General Info

Small business subcontract for backup power systems ensuring 95% uptime at LSA Lincoln, due June 19.

Agency

Department Of Defense → W7M1 Uspfo Activity Dc ArngView Agency

NAICS

221111 - Hydroelectric Power GenerationView NAICS

Place of Performance

NORTH POLE, DC, USA

Set-Aside

SBA

Documents

This scope was carved out of W912R1-26-Q-A020.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

EXORD 290-25 DCNG Logistics Support Area

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7M1 Uspfo Activity Dc Arng
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W7M1 Uspfo Activity Dc Arng
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide and maintain mobile or temporary backup power generation systems to ensure ≥95% uptime during outages at LSA Lincoln.

More opportunities from Department Of Defense → W7M1 Uspfo Activity Dc Arng

Same awarding agency

NAICS: 238210
Federal
Temporary Power Generation and Electrical IntegrationThe contract requires the provision and integration of temporary power generators to sustain HVAC operations, with a focus on electrical distribution and load management to ensure uninterrupted climate control functionality. The work involves deploying and connecting generator systems capable of handling the electrical demands of critical heating, ventilation, and air conditioning infrastructure, ensuring reliability during scheduled or emergency power outages. Technical coordination is essential to align generator capacity with existing electrical loads and to implement proper distribution mechanisms that prevent overloads and maintain operational stability. This subcontract is associated with the Department of Defense under the agency name W7M1 Uspfo Activity Dc Arng and is classified under NAICS code 238210, indicating it pertains to electrical contracting services. The place of performance is located in Washington D.C. with a ZIP code of 20003, suggesting the work will occur at a federal facility in the national capital region. The contract was posted on June 22, 2026, and is positioned as a subcontract, meaning the prime contractor will likely manage the overall scope while engaging specialized vendors for generator supply and integration. No set-aside type is specified, indicating the opportunity is open to all eligible contractors without preferential treatment based on business size or certification.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 months ago

DEADLINE

N/A
View Details