Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Beltz 10 Aquifer Storage and Recovery & Beltz 11 Well Injection Pilot Tests

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Cruz Water Department is conducting a feasibility study to evaluate the viability of diverting excess surface water to the Santa Cruz Mid County Groundwater Basin. This project involves pilot testing aquifer storage and recovery (ASR) at the Beltz 10 well to demonstrate potential applications in the Purisima Aquifer system and well injection at the Beltz 11 well to investigate raising water levels in the Tu aquifer. The scope of work includes downhole cleaning, well modifications to establish distribution system connections, and the installation of a 2.5-inch diameter monitoring well using the direct rotary method. This monitoring well will be used to collect essential water level and water quality data to inform the design and permitting of a future full-scale project. The pilot testing phase is scheduled to occur between 2026 and 2027, lasting up to 150 days. The Beltz 10 ASR test will consist of three injection and recovery cycles with expected recoveries of 0.44, 3, and 13 million gallons. The Beltz 11 injection test will involve cycles with expected recoveries of 0.1 and 1 million gallons, with a potential storage of 10 million gallons in the final cycle. Construction of the monitoring well is estimated to take 12 working days, with all activities restricted to weekdays between 8am and 5pm to comply with county noise ordinances. The project is categorized as exempt under California Environmental Quality Act Guidelines 15301 and 15306 due to negligible environmental impact.

General Info

Santa Cruz Water Department feasibility study for aquifer storage and recovery pilot testing.

Agency

California → City of Santa Cruz

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

34th Ave and Roland Drive, CA, 95062

Set-Aside

NONE

Documents

(1)

Santa Cruz Beltz 10 ASR and Beltz 11 Well Injection Pilot Tests Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Cruz
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Santa Cruz
Office AddressN/A
Contacts
Heidi LuckenbachWater Director

Full Description

Show more
The City of Santa Cruz Water Department is seeking to pilot test aquifer storage and recovery and well injection at its existing Beltz 10 well facility, which has two wells on site, Beltz 10 and Beltz 11, as part of a feasibility study to assess the viability of diverting excess surface water to the Santa Cruz Mid County Groundwater Basin. The Beltz 10 pilot test requires installing a monitoring well at the City's existing Beltz 10 well facility. The pilot testing is expected to last up to 150 days from 2026 to 2027. The City of Santa Cruz Water Department is seeking to pilot test aquifer storage and recovery (ASR) and well injection at its existing Beltz 10 well facility, which has two wells on site, Beltz 10 and Beltz 11 , as part of a feasibility study to assess the viability of diverting excess surface water to the Santa Cruz Mid County Groundwater Basin. The Beltz 10 well facility is shown on figure one. The ASR pilot testing of the Beltz 10 well seeks to field demonstrate the potential application of ASR in the in the A/AA unit Purisima Aquifer system. A new monitoring well will be installed as part of this work. The injection pilot testing of the Beltz 11 well seeks to investigate the potential to raise water levels in the Tu aquifer. The pilot testing results will be used to assess viability of the storage of drinking water underground at the Beltz 10 well facility and will provide the basis for the design and permitting for a long-term full-scale ASR and/or well.injection project. Preparation of Beltz 10 and Beltz 11 wells for pilot testing will include downhole cleaning procedures and modifications to the wells to establish a connection to the distribution system, retain or exchange pumps and add appurtenances. The ASR pilot test at Beltz 10 requires installing a monitoring well at the City's existing Beltz 10 well facility. This new monitoring well will be used to collect water level and water quality data. The monitoring well will be 2.5 inches in diameter. Drilling will be performed using the direct rotary method with bentonite-based fluid, which will be hauled offsite for disposal. Higher turbidity discharges from well development will be routed to the to the Beltz Water Treatment Plant (Beltz WTP) reclaim tank, which drains to the sanitary sewer system. Lower turbidity discharges from well development will be routed via the existing raw water pipeline to the unnamed creek at 30th Ave, a tributary to Moran Lake. A monitoring well vault and manhole will be installed to provide access for instrumentation, monitoring, or sampling. All construction activities will occur during working hours Monday through Friday 8am to 5pm consistent with County noise ordinance requirements. Construction of the monitoring well will require 12 working days. Some tree limbs will be required to be removed to allow the drill rig to access the site. The ASR pilot test at Beltz 10 will involve three repeated injection storage and recovery cycles with increasing quantities of water. Cycle 1 is expected to recover about 0.44 million gallons (mg). Cycle 2 is expected to recover about 3 mg. Water from Cycles 1 and 2 will be routed via the existing raw water pipeline to the unnamed creek at 30th Ave, a tributary to Moran Lake. Cycle 3 injection operations, if water quality pilot testing results from Cycles 1 and 2 are favorable, will result in the recovery of 13 mg that will be treated at the Beltz WTP will go into the distribution system. Water levels will be monitored after recovery. The injection pilot test at Beltz 11 will involve two repeated injection storage and recovery cycles at with increasing quantities of water extracted after injection. Cycle 1 is expected to recover about 0.1 million gallons (mg). Cycle 2 is expected to recover about 1 mg. Cycle 3 injection operations, if water quality pilot testing results from Cycles 1 and 2 are favorable, will result in the storage of 10 mg. Water levels at an existing monitoring well will be monitored to assess the response to injection at Beltz 11. Noise typical of existing operation noise will occur during pilot testing. The pilot testing is expected to last up to 150 days from 2026 to 2027.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS