Beltz 10 Aquifer Storage and Recovery & Beltz 11 Well Injection Pilot Tests
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Santa Cruz Water Department is conducting a pilot test at its existing Beltz 10 and Beltz 11 well facility to evaluate the feasibility of aquifer storage and recovery and well injection as a means to store excess surface water in the Santa Cruz Mid County Groundwater Basin. The project involves modifying both wells for integration with the municipal distribution system, including downhole cleaning, pump adjustments, and installation of necessary appurtenances. A new 2.5-inch diameter monitoring well will be installed at the Beltz 10 facility using direct rotary drilling with bentonite-based fluid, with all waste material hauled offsite. This monitoring well, equipped with a vault and manhole, will collect data on water levels and quality throughout the pilot period, which is expected to last up to 150 days between 2026 and 2027. All construction will occur during weekday business hours from 8 a.m. to 5 p.m. to comply with local noise ordinances, and limited tree limb removal will be performed only as needed for drill rig access. The ASR pilot at Beltz 10 will involve three staged injection and recovery cycles, beginning with a recovery of 0.44 million gallons, followed by 3 million gallons, and potentially up to 13 million gallons in the third cycle if water quality results from the first two cycles are favorable. Water from the first two cycles will be discharged to an unnamed creek via the raw water pipeline, while water from Cycle 3, if approved, will be treated at the Beltz Water Treatment Plant and introduced into the distribution system. The Beltz 11 injection pilot will involve two to three cycles injecting up to 10 million gallons total, with water levels monitored at an existing well to assess aquifer response. Discharges from well development are managed based on turbidity levels, with high-turbidity water directed to the treatment plant reclaim tank and low-turbidity water routed to the creek. The results of these tests will inform the design and permitting of a potential long-term, full-scale ASR system. Environmental compliance is governed by CEQA Class 1 and Class 6 categorical exemptions, with all activities constrained to the existing facility footprint and no expansion permitted. No formal procurement structure, contract value, or contractor selection criteria are outlined, indicating this is an internally managed feasibility study.
General Info
Agency
NAICS
Place of Performance
34th Ave and Roland Drive, CA, 95062Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
