Big Pine Fuel Reduction School St.
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California Forestry and Fire Protection, Department of
NAICS
561730 - Landscaping ServicesView NAICS
Place of Performance
CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia Forestry and Fire Protection, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
Contacts
Full Description
Show more
This project consists of fuel reduction within and adjacent to the riparian zone associated with the irrigation channel west of and paralleling School St in Big Pine, CA on Los Angeles Department of Water and Power property. The riparian zone primarily consists of black locust, cottonwood, and willows with a mix of herbaceous and woody understory. Fuel reduction within the riparian zone will include a combination of: removing 50% of black locust trees under 6 inches in diameter, starting with the smallest diameter material until 50% removal is achieved; limbing 75% of retained trees up to 6 ft. from the ground; pruning 50% of dead material from retained trees reachable with a pole saw; removing dead and down material up to 4 inches in diameter; removing of non-native live understory; retaining native live understory and large diameter down material to the maximum extent possible. Large diameter down material may be redistributed throughout the project area to reduce fuel density. The project also includes upland treatments both west and east of the irrigation channel, including the maintenance of the fuel break west of the LADWP access road. Additionally, removal of invasives, dead and downed material, debris, and up to 85% removal of native vegetation will occur in the upland area between the eastern bank of the irrigation channel and the western residential property boundary. All removal of vegetation will occur manually. Cut trees and large diameter brush suitable for firewood or fence post use will be cut to length and stacked. The remainder of cut material will be chipped, burned via curtain burning, or hauled away. Staged material and chips will not be placed in or where they may enter the irrigation channel. Equipment utilized within the riparian zone is limited to hand-operated equipment such as chainsaws. Operation of other equipment, such as chippers or air curtain burners, will not occur within the riparian zone and will be limited to established roadways, inclusive of established dirt roads. Maintenance will occur as necessary to maintain the standards listed above and may occur as frequently as an annual basis.
Similar Contracts
Same NAICS industry code
