Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Big Pine Fuel Reduction – School St.

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Forestry and Fire Protection, Department of

NAICS

561730 - Landscaping ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE Big Pine Fuel Reduction BDU

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Forestry and Fire Protection, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
Contacts

Full Description

Show more
This project consists of fuel reduction within and adjacent to the riparian zone associated with the irrigation channel west of and paralleling School St in Big Pine, CA on Los Angeles Department of Water and Power property. The riparian zone primarily consists of black locust, cottonwood, and willows with a mix of herbaceous and woody understory. Fuel reduction within the riparian zone will include a combination of: removing 50% of black locust trees under 6 inches in diameter, starting with the smallest diameter material until 50% removal is achieved; limbing 75% of retained trees up to 6 ft. from the ground; pruning 50% of dead material from retained trees reachable with a pole saw; removing dead and down material up to 4 inches in diameter; removing of non-native live understory; retaining native live understory and large diameter down material to the maximum extent possible. Large diameter down material may be redistributed throughout the project area to reduce fuel density. The project also includes upland treatments both west and east of the irrigation channel, including the maintenance of the fuel break west of the LADWP access road. Additionally, removal of invasives, dead and downed material, debris, and up to 85% removal of native vegetation will occur in the upland area between the eastern bank of the irrigation channel and the western residential property boundary. All removal of vegetation will occur manually. Cut trees and large diameter brush suitable for firewood or fence post use will be cut to length and stacked. The remainder of cut material will be chipped, burned via curtain burning, or hauled away. Staged material and chips will not be placed in or where they may enter the irrigation channel. Equipment utilized within the riparian zone is limited to hand-operated equipment such as chainsaws. Operation of other equipment, such as chippers or air curtain burners, will not occur within the riparian zone and will be limited to established roadways, inclusive of established dirt roads. Maintenance will occur as necessary to maintain the standards listed above and may occur as frequently as an annual basis.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS