Bldg. 12 Inspect Water Intake and Remove Zebra Mussels

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Mid-AtlanticView Agency

NAICS

N/A

Place of Performance

ML: GREAT LAKES, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Mid-Atlantic
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project, Utilities. Project Title: Bldg. 12 - Inspect Water Intake and Remove Zebra Mussels. Funding Source: CNIC Funded FY Requested: FY2027, Q3 Barracks/UH: No MWR Pool/Gym: No Project Details/SOW: Problem Statement: Previous inspections of the water intake revealed zebra mussels attached to the inside of the intake that need to be removed and sand inside the intake that needs to be monitored. Zebra mussels were last removed from the interior of the central intake in the summer of 2024. The intake was last inspected in summer of 2025. This inspection is to determine if the presence of mussels is worse or the same as the 2025 inspection results, to monitor the level of sand in the intake and to remove zebra mussels from both the inside and outside of the intake line and crib structure. Location: GLMAIN-PW-SA-INTK. Proposed Solution: Issue a contract to 1) monitor and measure the zebra mussels inside the intake line 2) remove zebra mussels from the center intake pipe and crib and 3) video inspect 3-500’ sections the interior of the intake to monitor the presence of mussels and sand and 4) take cross section profile sonar measurements of the intake line to measure the amount of sand in the intake. Justification: Zebra mussels growth and sand can reduce the flow through the intake line. CRM Comments: No issues. In this instance, the proposed SOW is being performed on ordinary infrastructure EV NEPA comments: If L84, likely CatEx #8 - HRichtfort 9/19/25 RPM Comments: Approved. APM Comments: No issues, approved.