Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

F--BLM FY26 GJFO MASTICATION

Awarded
140L3726Q0065Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to vegetation treatment by mastication across two units totaling 611 acres in Mesa County, Western Colorado, at an average elevation of 7,200 feet, under the National Interagency Fire Center of the Department of the Interior. The work focuses on reducing Pinon/Juniper and Mixed Mountain Shrub vegetation, requiring mastication of 75% of mixed mountain shrub and all juniper under 8 inches in diameter at breast height, while adhering to environmental constraints including slopes under 30% and crown cover under 45%. Operations must cease if rutting exceeds 3 inches or excessive soil disturbance occurs, and all activities must comply with strict environmental and safety protocols, including prohibitions on hazardous waste disposal, fueling near drainage areas, and damage to cultural, paleontological, or scientific resources. The performance period runs from July 15 to November 15, 2026, with work required to begin within 10 days of the Notice to Proceed and complete within 113 calendar days, and deliverables are to be submitted to 2815 H Road, Grand Junction, CO. This is a combined synopsis and solicitation for commercial items under FAR Part 12, structured as a Total Small Business Set-Aside with NAICS code 115310 and a size standard of $34 million. All offerors must be registered and active in SAM, submit a Unique Entity Identifier and CAGE code, and comply with a range of incorporated clauses and representations, including those related to debarment prohibitions, tax certification, and internal confidentiality agreements. Payment is based on actual acres completed, inspected, and accepted by the Contracting Officer’s Representative or Project Inspector, with a minimum Acceptable Quality Level of 85% per treatment area. Re-inspections due to non-conformance are the contractor’s financial responsibility, including a 21% overhead administrative cost. Invoices must be submitted electronically via the Treasury’s Invoice Processing Platform with supporting documentation including OF-286 forms, receipts for travel, and detailed line-item information. Contractors are also obligated to protect section corners and benchmarks, remove all debris, comply with fire restrictions, and submit a release of claims using Form DI-137 prior to final payment. Proposals must be submitted by June 10, 2026, via email to the designated point of contact, with pricing held firm for 60 days and

General Info

Small business set-aside for forestry mastication services, issued by National Interagency Fire Center.

Agency

Department Of The Interior → National Interagency Fire CenterView Agency

Contract Value

$129,532

NAICS

115310 - Support Activities for ForestryView NAICS

Place of Performance

ID

Set-Aside

NONE

Awardee

MOUNTAINSCAPE FORESTRY LLCView Profile

Award Issued Date

Documents

(9)

B08_Attachment_6_CorcoranMasticationFY26.zip

ZIP

B08_Attachment_7_FarmersMasticationFY26.zip

ZIP

B08_Attachment_2_Corcoran_Map.pdf

PDF

Wage Determination 1976-1351 Rev 79 for Colorado Service Contracts

PDFwage-determination

B08 Attachment 1 GJFO FY26 Mastication Statement of Work

PDFsow

B08_Attachment_3_Farmers_Unit_Map.pdf

PDF

RFQ 140L3726Q0065 Mastication Services for BLM Grand Junction Field Office

PDFrfq

B08 Attachment 8 Clauses and Provisions

PDFclauses

B08_Attachment_4_Western_Map.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Interagency Fire Center
Contacts1 person available
OfficeBOISE, ID, 83705, USA
Organization / Agency
Department Of The Interior → National Interagency Fire Center
View Agency Profile
Office AddressBOISE, ID, 83705, USA
Contacts
Rosales Daniel

Full Description

Show more
FY26 GJFO MASTICATION

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
Florida Forest Service Statewide Wildfire Mitigation Services
Solicitation # ITB FFS 26 27 04
The Florida Department of Agriculture and Consumer Services, through the Florida Forest Service, is soliciting bids under ITB FFS 26 27 04 to establish fixed-rate Term Agreements for statewide wildfire mitigation services. The scope of work includes forestry mowing, mulching, chopping, vegetation grinding, tree removal, and land preparation services across various service levels. The Department intends to award up to ten agreements per service level within each FFS Region to responsive and responsible vendors offering the lowest initial term sub-total based on a maximum rate unit price per acre. The contract features an initial three-year term with the possibility of three one-year renewals and a single extension of up to six months. Selected contractors must adhere to strict performance standards, including mulching vegetation to two to three inches above ground level and ensuring no residue exceeds three feet in height. Operational requirements include the presence of a contractor foreman on-site to avoid financial penalties and the use of certified pile burners for on-site debris disposal via air curtain incinerators. Insurance mandates include general liability of one million dollars per occurrence, automobile liability of three hundred thousand dollars, and worker's compensation per Florida Statutes. Bids must be submitted in sealed packages by September 30, 2026, and include specific certifications regarding lobbying, debarment, and drug-free workplace programs. Payment is contingent upon annual legislative appropriation and is processed following a five-business-day inspection and approval period.
Department of Agriculture and Consumer Services

POSTED

about 20 hours ago

DEADLINE

in 19 days
View Details
NAICS: 115310
New
SLED
East Fork Scott River Forest Health Implementation Project
Solicitation # 2025-47-065
The East Fork Scott River Forest Health Implementation Project, managed by the Shasta Valley Resource Conservation District in Siskiyou County, California, focuses on improving forest health, enhancing wildlife habitat, and reducing the risk of severe wildfires within the Beaver Valley Headwaters Preserve. The project involves hazardous fuels and vegetation treatments across up to 397 acres, including an initial 263 acres and a subsequent amendment adding 134 acres on lands managed by The Wildlands Conservancy. Key deliverables include 186 acres of ridgeline shaded fuel breaks, 124 acres of shaded fuel breaks along Highway 3, 38 acres of pile burning, and the removal of invasive Dyer's Wood along roads. Implementation methods consist of non-commercial manual thinning, pruning, mastication, chipping, hand piling, and pile burning. The project is conducted under the California Environmental Quality Act (CEQA) and has been granted a Negative Declaration, indicating no significant environmental impacts. Strict operational standards are in place, including the exclusion of heavy equipment from specific watercourse buffers and the prohibition of vehicle operations during saturated soil conditions. Special protections are mandated for cultural resources and the California Condor, with specific noise and habitat disturbance buffers around occupied nests. Project oversight includes inspections of refueling areas and adherence to a Categorical Waiver of Waste Discharge Requirements to ensure water quality and erosion control. Primary points of contact for the project include District Manager Rod Dowse, Forester Dan Blessing, and Project Coordinator Renee Main.
Shasta Valley Resource Conservation District

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 115310
New
SLED
Caltrans District 4 Vegetation Management Program Corridor -Contract 3 Wildfire Adaptation Fuel Reduction Vegetation and TreeThe Caltrans District 4 Vegetation Management Program Corridor Contract 3 is a wildfire adaptation project focused on fuel reduction and tree removal across approximately 1,697.34 acres at 27 locations along the State Highway System in eight Bay Area counties, including Alameda, Contra Costa, Marin, Napa, Santa Clara, Solano, Sonoma, and San Mateo. The primary objective is to reduce wildfire ignition risk and establish shaded fuel breaks to ensure consistent roadway access for the public and emergency first responders. The scope of work includes clearing vegetation within 10 feet of the edge of pavement to bare soil, removing invasive and diseased vegetation, reducing ladder fuels in native shrublands, and removing trees under 10 inches DBH while prioritizing the preservation of larger trees. These activities will be executed using manual, mechanical, and herbicide treatments. The project operates under a statutory CEQA exemption based on Governor Newsom's wildfire State of Emergency Proclamation and must adhere to the Statewide Fuels Reduction Environmental Protection Plan. On-the-ground activities are required to commence by October 15, 2026, with a performance period of up to two years. All work must be performed by or under the direction of a qualified responsible party, such as a registered professional forester or certified arborist. Compliance will be monitored through on-site inspections by various state agencies, including the State Water Board and CAL FIRE, to verify the implementation of best management practices.
Caltrans, District 4 - Bay Area/Oakland

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 115310
New
SLED
Fall 2026 Herbicide Release
Solicitation # RFP-2025-0147
Tuolumne County is soliciting proposals under RFP-2025-0147 for qualified contractors to perform chemical herbicide release on approximately 973 acres within the Rim Fire burn scar in the Stanislaus National Forest. The project aims to support the growth of seedlings planted in 2025 and 2026 by reducing competing vegetation. All work must be completed by October 31, 2026, or upon the first significant rain event or senescence of deciduous vegetation. The project is managed by the County with program administration and project oversight provided by the subcontracted Yosemite River's Alliance. Eligible contractors must possess a California Agriculture Pest Control Operator License with Category E Forest, a Pest Control Business License, and registration as a Farm Labor Contractor with the US Department of Labor. Requirements include at least three years of experience in forested environments, a clean bankruptcy record for the past five years, and the ability to provide a foreman fluent in English. The award will be based on best value, weighted 40 percent on reasonable cost and 30 percent on qualifications and experience. Operational standards mandate strict adherence to the Rim Fire Restoration and Reforestation Record of Decisions, including specific herbicide mixing ratios, nozzle pressure of 15 psi, and the use of factory-sealed containers no larger than 2.5 gallons. Contractors are responsible for all spill clean-up costs and must follow comprehensive fire prevention and spill reporting procedures. Performance is monitored through BMP implementation checklists and periodic inspections by the County or Forest Service. Proposals are due by September 23, 2026, and must be submitted in PDF format.
County Administration Office

POSTED

1 day ago

DEADLINE

in 11 days
View Details

More opportunities from Department Of The Interior → National Interagency Fire Center

Same awarding agency

NAICS: 238990
Federal
Y--ADOBE FIRE FENCE REPAIR
Solicitation # 140L3726Q0162
The National Interagency Fire Center, under the Department of the Interior, is soliciting a firm fixed price contract for the reconstruction of approximately 4.5 miles of 4-wire fence in Elko County, Nevada. This project is necessary to protect emergency stabilization and rehabilitation treatments and manage grazing following the 2026 Adobe Fire. The scope of work includes the removal and replacement of 23,776 feet of fencing, installation of steel pipe posts, and the use of specific materials such as SCH40 pipe and bar stock for brace rail attachments. The contractor is responsible for providing all labor, equipment, and materials, including the proper disposal of removed materials at approved landfills or recycling centers. The contract has a period of performance of 220 days from the notice to proceed. Award will be based on the lowest price among responsible quoters who meet all technical and regulatory requirements. Key compliance mandates include adherence to the Davis-Bacon Act for prevailing wages, the Buy American Act for domestic construction materials, and the submission of performance bonds totaling 100 percent of the original contract price. Contractors must provide weekly progress reports and coordinate regularly with the Bureau of Land Management for field inspections. Proposals are due by September 14, 2026, and must be submitted electronically to the contracting officer.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS