This Government Contract opportunity from Department Of Defense was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Borrow Material Supply and Placement

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 19 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
FY 2027 Patching and Repair Project
Solicitation # PE-66204-NONST-2027-000000005
The FY 2027 Patching and Repair Project is a unit price contract issued by the City of Walnut Grove, Georgia, for asphalt patching and mill, patch, and inlay services. The scope of work includes providing all labor, materials, and equipment necessary for repairs at various locations, such as Greenhill Way, Valley Drive, Woodland Circle, and Walnut Court. Key technical requirements include the use of asphalt containing hydrated lime and adherence to GDOT 652 and 653 standards for striping and marking, as well as MUTCD Chapter 6 for temporary traffic control. The contract term is 180 calendar days from the notice to proceed, with a mobilization period of 60 business days. Work is restricted to between 7:00 AM and sundown on weekdays, with specific restrictions for residential areas on weekends and a total prohibition of work on Sundays and select holidays. The contract will be awarded to the lowest responsible bidder who is prequalified by the Georgia Department of Transportation. Bidders must submit a comprehensive proposal including a 5% bid bond, bidder qualifications, and proof of insurance. The successful contractor is required to provide a 100% performance-payment bond and a certificate of insurance naming the City of Walnut Grove as additionally insured within seven days of the award. Payments are processed monthly based on certified invoices for services performed and accepted. Final payment is contingent upon the submission of all test results, including cores and photo reports, and the completion of a final site cleanup.
City of Walnut Grove

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project
Solicitation # 2600030
The MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project is a construction solicitation issued by the City of Lawrence, Kansas, with a response deadline of October 13, 2026. The project focuses on street maintenance and reconstruction, featuring the installation of 8,000 square yards of concrete separated bike lanes, pavement reconstruction via milling and overlay, storm sewer improvements, and the replacement of sidewalks, including two blocks of 5-foot-wide sidewalk infill. Additional work includes improvements at the 19th and Mass Streets intersection and partial disturbance of a 16-foot-wide grass planter strip. Contractors must coordinate concurrent relocation efforts with AT&T and Black Hills Energy, who are permitted to operate within the contractor's temporary traffic control. The contract requires substantial completion within 340 calendar days and final completion within 365 calendar days of the Notice to Proceed. Bidders must provide an electronic bid bond of at least 5 percent of the bid amount and are subject to KDOT required documents, Davis-Bacon and Related Acts, and Buy America domestic steel requirements. Evaluation for award considers total cost, bidder location, and Disadvantaged Business Enterprise participation efforts. Technical standards include NEMA TS-1 for traffic signals and NSF 61 for potable water materials. Payment is structured through a mix of unit pricing and lump sum for demolition, with payments due within 30 days after completion. Final acceptance by the City is followed by a joint inspection 11 months later.
MSO - CMED

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
EMERGENCY CULVERT REPLACEMENT PROJECT¿ FOR THE UPSON COUNTY BOC - Rocky Bottom Road
Solicitation # PE-77031-NONST-2026-000000021
The Upson County Board of Commissioners is soliciting sealed bids for the Emergency Culvert Replacement Project on Rocky Bottom Road in Georgia. The scope of work involves two separate pipe crossings, specifically the demolition and replacement of approximately 60 linear feet of 84-inch corrugated metal pipe and 60 linear feet of 72-inch corrugated metal pipe, along with other improvements detailed in the project plans. All work must be completed within 45 consecutive calendar days following the receipt of the Notice to Proceed. Bidders must be properly licensed in the State of Georgia and comply with E-Verify requirements. A mandatory pre-bid conference is scheduled for September 22, 2026, at 10:00 AM at the Thomaston-Upson County Government Complex, with sealed bids due by 10:00 AM on October 6, 2026. Submission requirements include a bid bond of at least 5% of the base bid, while the successful contractor must provide performance and payment bonds each totaling 100% of the contract amount. Comprehensive insurance coverage is required, including general liability, commercial automobile liability, and worker's compensation, each with minimum limits of 1,000,000 dollars per occurrence or accident. The project is managed by Chris Brazell of EMC Engineering Services, Inc.
Upson County Board of Commissioners

POSTED

about 21 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract entails the procurement, import, and placement of approximately 12,000 cubic yards of borrow material to reinforce levees, with all material required to meet U.S. Army Corps of Engineers specifications. The work falls under a subcontract classified as a Total Small Business Set-Aside, ensuring exclusive eligibility for small businesses as defined by the SBA. The North American Industry Classification System code is 237310, indicating it pertains to water and wastewater construction. The solicitation is managed by the Department of Defense through the W075 Endist Sacramento office, with performance centered in Sacramento. The opportunity was posted on July 7, 2026, and responses are due by July 22, 2026, providing a four-week window for bidding. All activities must align with federal requirements for material quality, logistics, and placement to ensure structural integrity of the levee system.

General Info

12,000 cubic yards of borrow material for Sacramento levees under small business set-aside, per USACE specs, due July 22, 2026.

Agency

Department Of Defense → W075 Endist SacramentoView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Sacramento, CA, USA

Set-Aside

SBA

Documents

This scope was carved out of W9123826BA010.

The full solicitation package (16 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CA

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W075 Endist Sacramento
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Procurement, import, and placement of approximately 12,000 cubic yards of borrow material meeting USACE specifications for levee reinforcement.

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

NAICS: 237990
New
Federal
USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CA
Solicitation # W9123826BA010
The United States Army Corps of Engineers Sacramento District is soliciting a firm-fixed-price, design-bid-build construction contract for levee improvements supporting the American River Common Features Natomas Basin. The project focuses on Reach I Contract 2 and Reach H, involving approximately 2.18 miles of landside slope flattening from Gateway Oaks Drive to Northgate Boulevard. Key scope elements include the excavation and reuse of 15,000 cubic yards of levee embankment fill, the import of 12,000 cubic yards of fill, utility relocations, the construction of a 12-foot maintenance road, and tree and stump removal. Additionally, the work includes the exposure and backfill of a 12-inch asbestos cement waterline. Due to environmental and structural constraints, activities impacting the levee prism are restricted to the period between April 15 and November 1. The project is estimated to cost between 10 million and 13 million dollars and is designated as a total small business set-aside under NAICS code 237990. The performance period is 590 calendar days from the receipt of the Notice to Proceed. Award will be granted to the responsive and responsible offeror providing the lowest price for all contract line items. Bids must be submitted electronically via the PIEE system by September 16, 2026. Contractors are required to maintain a quality control system compliant with FAR 52.246-12 and adhere to USACE EM 385-1-1 safety standards. Payment will be processed through the Resident Management System in accordance with FAR 52.232-27, with a 14-day payment window following the receipt of a complete pay request package.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 561730
New
Federal
IIS USFS Tanbark Hazard Tree Removal
Solicitation # W9123826QA035
Solicitation W9123826QA035 is a firm-fixed-price contract issued by the Department of Defense, W075 Endist Sacramento, for hazard tree removal and trimming services at the United States Forest Service Tanbark Administrative Site within the San Dimas Experimental Forest in California. This total small business set-aside, specifically designated for HUBZone and SDVOSB entities, requires the contractor to provide all personnel, equipment, and supervision to fell 75 trees, grind and remove slash, and maintain stumps at a six-inch height. Additional requirements include providing a biological monitor and performing washout stabilization. The project is governed by a 116-day period of performance running from October 1, 2026, to January 31, 2027, and requires specialized qualifications, including a certified arborist and a certified crane operator. The award will be based on price only, provided the offeror is determined responsible and the pricing is not unrealistically low or unbalanced. Key deliverables include pre-work submittals such as an Environmental Protection Plan, an Accident Prevention Plan, and a project schedule. All work must comply with USACE EM 385-1-1 safety standards and the Tanbark Flat Arborist Tree Inventory. Proposals are due by September 22, 2026, at 6:00 PM, with a mandatory site visit held on September 3, 2026. Invoicing and reporting shall be conducted through the Wide Area WorkFlow system.
Landscaping Services

POSTED

2 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS