Bouldin Island Multi-Benefit Levee Setback Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bouldin Island Multi-Benefit Levee Setback Project, led by Reclamation District No. 756, involves the setback and rehabilitation of approximately 5,000 linear feet of levee along the Mokelumne River in Stockton, San Joaquin County. The primary objectives are to create a 20-foot-wide waterside planting bench for shaded riverine aquatic habitat, upgrade the levee to meet Bulletin 192-82 standards, and replace the Camp 5 Pump Station and its associated outfall pipes. Technical specifications include the placement of 80,000 cubic yards of fill, 18,000 tons of clean quarry stone for slope protection, and 4,000 tons of aggregate base for the levee crest access roadway. The project is subject to strict environmental compliance under the California Environmental Quality Act, with a Mitigated Negative Declaration indicating no significant impacts provided mitigation measures for biological and cultural resources are implemented. Construction is scheduled to begin on May 31, 2025, and span two years, with work restricted to specific seasonal windows: general construction from May 1 to November 1, waterside work from July 1 to November 1, and in-water work from August 1 to October 31. Additionally, the project must adhere to CalGEM guidelines regarding the re-abandonment of any impacted oil, gas, or geothermal wells and comply with California Department of Fish and Wildlife regulations concerning endangered species and migratory birds.

General Info

Reclamation District 756 will rehabilitate 5,000 feet of levee in Stockton starting May 2025.

Agency

California → Reclamation District 756

Place of Performance

State Route 12, Stockton, CA, 95242

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 756
Contacts2 people available
OfficeN/A

Interested Companies (1)

MBK EngineersSacramento, CA

Full Description

Show more
Reclamation District No. 756 plans to implement a levee setback on approximately 5,000 linear feet of levee along the Mokelumne River on Bouldin Island to create a waterside planting bench for Shaded Riverine Aquatic habitat, rehabilitate the levee to sustainably meet Bulletin 192-82 standards, and replace the District’s Camp 5 Pump Station.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
RFP2026-015 Ingleside on the Bay Drainage Improvements
Solicitation # RFP2026-015
San Patricio County is soliciting sealed bids for the Ingleside on the Bay Drainage Improvements Project (RFP2026-015) in Ingleside, Texas. The scope of work includes ditch cleaning and reshaping, storm sewer cleaning, storm pipe installation and replacement, and the installation of storm inlets. Additionally, the project involves the full-depth reconstruction of several street segments—specifically Parkview Place, Live Oak Street, and Bayshore Drive/Court—using flexible asphalt pavement sections, as well as the installation of wastewater force mains. Key technical requirements include the use of RC Pipe (Class IV) in various diameters, adherence to AASHTO pavement design guides, and a minimum 95% maximum dry density for shoulder material compaction. The contract will be awarded to the responsive and responsible bidder providing the lowest or best bid. Bidders must submit a statement of qualifications and a proposed calendar day schedule, as shorter schedules are preferred. Bids are due by 2:00 PM on December 16, 2026, and can be submitted electronically via the County's eBidding platform or physically with a thumb drive. For contracts exceeding $100,000, a bid bond of 5 percent is required, along with performance and payment bonds. The project is subject to Davis-Bacon prevailing wage rates, the Contract Work Hours and Safety Standards Act, and various federal non-discrimination and labor regulations. There is no specified set-aside status for this solicitation.
San Patricio County

POSTED

about 8 hours ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS