Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Bridge Construction (Five-Span Structure)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the design-build or construction of a five-span bridge over the Coachella Valley Stormwater Channel, encompassing all required substructure, superstructure, and deck placement components, with full compliance to Caltrans or applicable local engineering and safety standards. The project is classified as a subcontract and is being procured by the City of Coachella under NAICS code 237310, which corresponds to highway, street, and bridge construction. All work must be performed at the specified location in Coachella, California, with a zip code of 92236, and must meet all technical and regulatory requirements for infrastructure projects in the region. The solicitation was posted on July 9, 2026, and proposals are due by August 19, 2026, at 9:00 PM Pacific Time. The project does not have a set-aside designation, meaning it is open to all eligible contractors without preference or restriction based on business size or ownership type. Interested parties must submit their bids through the designated online platform linked in the contract details, and all submissions must be fully responsive to the technical specifications and performance criteria outlined for the bridge construction. There is no designated point of contact listed, so inquiries should be directed through the official bidding portal.

General Info

Design-build bridge over Coachella Valley Stormwater Channel due August 19, 2026, open to all contractors.

Agency

California → City of CoachellaView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Coachella, CA, 92236, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260708017.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Avenue 50 Bridge Over Coachella Valley Stormwater Channel Improvement Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Coachella
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Coachella
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design-build or construction of a five-span bridge over the Coachella Valley Stormwater Channel, including substructure, superstructure, and deck placement, compliant with Caltrans or local standards.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Coachella

Same awarding agency

NAICS: 237310
SLED
Avenida De Platina Neighborhood Pavement Rehabilitation Project
Solicitation # ST-135
The Avenida De Platina Neighborhood Pavement Rehabilitation Project involves the full removal of four inches of asphalt, aggregate base, and subgrade, followed by the placement of a new four-inch thick asphalt layer across the neighborhood. The scope extends to the removal and reconstruction of speed humps, upgrades to traffic signage and pavement striping, and the adjustment of manholes, cleanouts, and water valves to match the final grade. All work must be performed in a professional and workmanlike manner to the satisfaction of the City of Coachella. The project is governed by California state statutes rather than federal FAR clauses, requiring strict compliance with the Public Contract Code, Labor Code provisions including prevailing wage rates under Sections 1725.5 and 1771.1, and SB 854 mandates for electronic certified payroll submissions to the Department of Industrial Relations. Contractors must hold an active California license in Class A, C-32, or C-12 and be registered with DIR for the duration of the project. A 10% bid security in the form of cash, certified check, or bid bond is mandatory, and successful bidders must furnish performance and payment bonds each equal to 100% of the contract price, issued by a surety admitted in California. The contract will be awarded on a Lowest Price Technically Acceptable basis to the lowest responsive and responsible bidder who meets all legal, licensing, and bonding requirements. Performance is limited to 30 working days from the Notice to Proceed, with time being of the essence. All contract documents must be obtained through PlanIT Print Works, and sealed bids must be physically delivered to the City’s Engineering Office by 10:00 a.m. on August 19, 2026. No electronic submissions are permitted, and failure to comply with any mandatory requirement will render a bid non-responsive. The City of Coachella, through Leonard R. St. Sauver, serves as the primary point of contact for all project inquiries and oversight.
Highway, Street, and Bridge Construction

POSTED

23 days ago

DEADLINE

in 3 days
View Details