Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Bridge Culvert Installation and Structural Excavation

Open
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Municipal District of Pincher Creek No. 9 involves the removal of an existing 2490 mm x 1750 mm x 20.1 m CSP arch and the subsequent installation of a 2700 mm diameter CSP with steel substrate holders. The scope of work includes structural excavation for a 32 m length and the delivery of a fully installed and backfilled bridge culvert in accordance with SSBC Edition 17, 2020. The project is located in the Municipal District of Pincher Creek No. 9, Canada, under NAICS code 237990. To be eligible, contractors must hold COR, TLC, or COREL certification. There is no specified set-aside status for this opportunity.

General Info

Subcontract for removing and installing a CSP bridge culvert in Pincher Creek.

Place of Performance

Municipal District of Pincher Creek No. 9, AB, CAN

Set-Aside

NONE

Documents

This scope was carved out of AB-2026-07650.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Municipal District of Pincher Creek No. 9 - Invitation to Bid - Bridge Culvert Replacement and Other Work - BF 76203

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 14 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Municipal District of Pincher Creek No. 9 - Invitation to Bid - Bridge Culvert Replacement and Other Work - BF 76203
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMunicipal District of Pincher Creek No. 9
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of existing structure and installation of new CSP for prime contractors on Municipal District of Pincher Creek No. 9 bridge projects. Removes and disposes of 2490 mm x 1750 mm x 20.1 m CSP arch, performs structural excavation for 32 m length, and installs 2700 mm diameter CSP with steel substrate holders per SSBC Edition 17, 2020. Requires COR, TLC, or COREL certification. Delivers installed and backfilled bridge culvert.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Ashley River Scenic Blue Trail Obstruction Clearing
Solicitation # 2027-09
Dorchester County is seeking qualified firms to provide obstruction clearing services for a 4-5 mile segment of the Ashley River Scenic Blue Trail, located between Ashley River Park/Bacons Bridge Road and Highway 17A. The primary objective is to restore safe motorized recreational navigation by establishing a continuous navigable passage with a minimum clear width of 25 feet. The scope of work includes cutting, repositioning, chipping, and disposing of woody debris and natural obstructions, as well as removing incidental non-vegetative debris, all while adhering to SCDNR Best Management Practices. The project is funded in whole or in part through the Recreational Trails Program administered by the South Carolina Department of Parks, Recreation and Tourism. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of navigation clearing segments, contractor haul, county haul, and a fixed $5,000 disposal fee allowance. Bids must be submitted via the online supplier portal by December 1, 2026, at 2:00 PM. The selected contractor must provide a Project Manager or Superintendent with at least three years of experience in marine waterway-clearing. Substantial completion of the work is required within 180 calendar days of the Notice to Proceed, with final completion due within 30 days thereafter. This project is subject to federal-aid construction provisions, including the Davis-Bacon and Related Act and various non-discrimination and safety standards.
Purchasing Services Division

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # 27032
The County of Greenville is seeking proposals from qualified general contractors for site improvements at Northside Park, located at 101 West Darby Road, Taylors, SC. The project is divided into three distinct phases: Phase 1 (East Side), Phase 2 (West Side), and an Alternate phase for the Waterpark Parking Lot. The scope of work includes demolition of existing concrete, asphalt, fencing, and benches; site work and grading; installation of heavy-duty concrete paving, concrete curb and gutter, and a 27'x40' pavilion shade structure; and landscaping including the installation of 26,627 square feet of sod. The County reserves the right to award these phases individually or in any combination. The anticipated notice to proceed is December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals were due by November 25, 2026. Contractors must comply with ADA Title II guidelines, the Occupational Safety and Health Act of 1970, and the Prison Rape Elimination Act of 2003. Key contractual requirements include the submission of a bid bond, a performance and payment bond for the total contract price, and the maintenance of all required insurance for the life of the contract. Liquidated damages of $250.00 per calendar day will be assessed if work is not completed within 90 calendar days from the notice to proceed. There is no set-aside status for this solicitation.
PARKS ADMINISTRATION

POSTED

about 5 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
Wet Weather Basin Improvements
Solicitation # 100022
The Wet Weather Basin Improvements project, solicitation number 100022, is a construction effort managed by the Central Contra Costa Sanitary District in Martinez, California. The primary objective is to achieve 500-year flood protection by raising berms around Wet Weather Basins B, C, and D. The scope of work includes significant earthwork, levee raising, grading, backfill, and the demolition of existing utilities and structures. To enhance treatment plant resiliency, the project incorporates the installation of new mechanical screens, gates, and electrical systems for security, lighting, and sump pump controls, alongside the implementation of Process Control and Instrumentation Systems. The contract will be awarded to the lowest bidder and requires strict adherence to safety protocols, including confined space entry and hot work. Contractors must comply with California Labor Code prevailing wage requirements and ADA standards. Key deliverables include technical submittals, operation and maintenance manuals, and a baseline schedule due within 30 days of the Notice to Proceed. Project administration and payment will be managed through Procore. The project also includes specific requirements for piping identification, the use of stainless steel or plastic tags for valves, and compliance with NSF Standard 61 for materials in contact with process water. There is no set-aside status specified for this solicitation.
Central Contra Costa Sanitary District (Central San)

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237990
New
SLED
Barefoot Beach Restoration - Grant Funded
Solicitation # 25-8576
The Barefoot Beach Restoration project is a grant-funded, turn-key construction contract managed by the Collier County Facilities and Redevelopment agency in Florida. With an anticipated budget of $1,087,934.87, the project focuses on repairing and restoring park facilities and site improvements damaged by Hurricane Ian. The scope of work includes civil and site improvements such as pavement and curb restoration, ADA upgrades, and the installation of mobi mats and outdoor shower pads. Additionally, the contractor is responsible for restoring the concessions structure and chickee hut, replacing fencing and gates across multiple parking lots and the beach entrance, and installing new monument signage and lighting. A bid alternate is also included for the cleaning and maintenance of the butterfly garden and pond. Bids are due electronically by January 12, 2027, at 3:00 P.M. local time. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount and a 5 percent bid bond. The project timeline requires work to commence within five calendar days of the Notice to Proceed, with a general completion timeline of 150 calendar days. All work must adhere to the latest Florida Building Code, Florida Accessibility Code, and ADA requirements. The contractor is required to use the Procore project management platform for all RFIs and submittals and must comply with FEMA Public Assistance funding provisions, including non-discrimination and federal labor laws. There is no specific set-aside status for this solicitation.
Facilities & Redevelopment

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Municipal District of Pincher Creek No. 9

Same awarding agency

NAICS: 237310
New
International
Municipal District of Pincher Creek No. 9 - Invitation to Bid - Bridge Culvert Replacement and Other Work - BF 76203
Solicitation # AB-2026-07650
The Municipal District of Pincher Creek No. 9 is soliciting sealed tenders for the replacement of a bridge culvert at Bridge File 76203, carrying a local road over Ernst Creek near Maycroft, Alberta. The project involves the removal and disposal of an existing 2490 mm x 1750 mm x 20.1 m corrugated steel pipe (CSP) arch and the installation of a new 2700 mm diameter x 32 m long CSP. The scope of work includes mobilization, site occupancy, traffic accommodation, care of water, fish capture and release, total suspended solids testing, structural excavation, granular and non-granular backfill, and the installation of heavy rock riprap, brush layering, and straw rolls. Due to environmental constraints, instream work is strictly limited to the window between August 16, 2027, and August 31, 2027, with all contract work to be completed by September 30, 2027. Tenders must be submitted via email in an unprotected searchable PDF format by 11:00 am Alberta MST on December 3, 2026. Submissions must include all required tender forms and a digital bid bond equal to 10% of the total sum tendered. The contract will be awarded to the lowest compliant bidder, who must provide evidence of experience, qualifications, and financial capability. A mandatory prerequisite for the award is a valid Certificate of Recognition (COR), Temporary Letter of Certification (TLC), or Certificate of Recognition Equivalency Letter (COREL); notably, a Small Employer Certificate of Recognition (SECOR) is not acceptable. Payments will be made in Canadian funds with a 10% holdback, and the project carries a warranty period of two years for bridge structures and one year for other work.
Highway, Street, and Bridge Construction

POSTED

about 4 hours ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS