Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

California Aqueduct Reach 4 Verizon Fiber Optic Line Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Aqueduct Reach 4 Verizon Fiber Optic Line Repair project involves the repair of an existing fiber optic service line within the California Department of Water Resources right of way in Fresno County. The scope of work spans from milepost 104.42R to 105.85R on the right side of Reach 4 of the California Aqueduct. Key activities include the installation of a prefabricated concrete handhole at MP 104.42R, the excavation of a 1,478-foot trench to an existing handhole at MP 104.70R, and the removal and offsite disposal of damaged trace wire, duct, and fiber optic cable. Verizon will install new high-density polyethylene duct and trace wire, pull new fiber optic cable to the southernmost handhole at MP 105.85R, and splice the new cable into undamaged portions of the existing line. Following installation, all excavated areas will be backfilled, compacted, and recontoured to match the original topography. The project is managed by Cody Nelson of the Department of Water Resources and is categorized as a ministerial and emergency project, qualifying for a categorical exemption under CEQA Section 15305(b) for the issuance of minor encroachment permits.

General Info

Verizon fiber optic line repair and installation at California Aqueduct Reach 4, Fresno County.

Agency

California Water Resources, Department of

Place of Performance

Approximately 1.65 miles SE of intersection of Russell Ave and Aqueduct., CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Cody NelsonPlanner Scheduler/UC Supervisor

Full Description

Show more
Verizon requests encroachment permission to repair its existing fiber optic service line located in the Department of Water Resources right of way. The repair requires installation of a new handhole at MP 104.42R. Verizon’s contractor will excavate an approximately 15-feet wide by 15-feet long by 3-feet deep area. A prefabricated 2-foot wide by 3-foot long by 3-foot-high concrete handhole will be placed into the excavation and the area around it will be backfilled and compacted; the concrete cover will remain exposed as an access point for installing and splicing new fiber optic cable. Once the handhole is installed, an approximately 1,478-foot long by 6-inch wide, 3-feet-deep trench will be excavated between the new handhole and an existing handhole at MP 104.70R. The trench will expose damaged trace wire, duct, and fiber optic cable. The duct and trace wire between MP 104.42R and MP 104.70R will be removed as well as the fiber optic cable between MP 104.42R and MP 105.85R. The removed materials will be disposed of at an appropriate offsite location. A new high-density polyethylene (HDPE) duct and trace wire will be placed in the trench and connected to the handhole and remaining duct. The trench will then be backfilled and compacted. New fiber optic cable will be installed by removing handhole covers, placing new cable through the handhole into the duct at MP 104.42R and pulling it through to the southernmost handhole at MP 105.85R. When the new cable is in place, the concrete covers will be placed over the handholes, and the area over the MP 104.70R handhole will be backfilled, compacted. Verizon will connect the new fiber optic cable by removing the handhole covers at MP 104.42R and MP 105.85R splicing the ends of the new fiber optic cable into the undamaged portions of the existing cable. When splicing is complete, the concrete covers will be placed over the handholes and the area over the covers will be backfilled, compacted, and recontoured to match the original topography.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
IFB-26-27-015-Brookview Road Transmission Pole Access Road
Solicitation # IFB-26-27-015
The City of Danville is soliciting bids from Virginia-licensed contractors for the construction of an access road off Brookview Road to provide access to electrical transmission poles. Located within a 100-foot wide city easement on parcel 00182, the scope of work includes mobilization, clearing, grubbing, grading, the installation of storm culverts and structures, curb and gutter construction, and paving. The project also requires the implementation of erosion and sediment control measures, a stormwater BMP, and the delivery of an as-built survey. All work must comply with federal, state, and local regulations, including permits from the DEQ and USACE, and contractors must maintain a minimum clearance of 20 feet from energized transmission lines. Bids are due by October 8, 2026, at 2:00 PM, and will be awarded to the lowest responsive and responsible bidder based on the total combined lump sum price, with consideration given to the proposed completion time. The project timeline specifies substantial completion within 60 calendar days and final completion within 75 calendar days from the Notice to Proceed. Required financial securities include a 5% bid bond and 100% performance and payment bonds, with the performance bond remaining in effect for one year after final acceptance. Additionally, a 5% retainage will be withheld from invoices until final completion. Liquidated damages for delays are set at $500 per day.
City of Danville

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 237130
New
SLED
Water Meter Gateway Tower
Solicitation # CIP PW 26-30
The City of Lathrop is soliciting bids for the Water Meter Gateway Tower project (CIP PW 26-30) located at 2908 Hemsworth Court, Lathrop, California. The project involves the construction of an 80-foot tall, self-supporting triangular lattice steel data transmission tower that is TIA-222-I compliant and capable of withstanding 110 mph wind gusts. The scope of work includes providing CA engineer-stamped plans, constructing a drilled concrete pier and pad, installing a city-furnished NEMA 3-rated equipment cabinet, and running electrical and communication conduits to a control hut. Additional site work includes asphalt removal and replacement and the installation of a traffic-rated concrete box. The facility is designed to support multiple gateway antennae for transmitting data from telemetrically-enabled water meters to City offices. The contract will be awarded to the lowest bidder based on the base bid price, with an engineer's estimate of 125,000 dollars. Work must commence within 10 working days of the Notice to Proceed and be completed within 40 working days. Bidders must provide a 10 percent bid bond, and the successful contractor must provide 100 percent performance and payment bonds, along with a 10 percent warranty bond. As a public works project, compliance with California Labor Code Section 1700 regarding prevailing wages is mandatory. Bids must be submitted in a sealed envelope to the City Clerk by October 20, 2026, and must include proof of current DIR registration. Progress payments will be processed monthly upon review by the project engineer.
City of Lathrop

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
EIE490 Microreactor Synchronization, Eielson AFB, Alaska
Solicitation # W911KB279A007
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence through a Request for Information for the EIE490 Microreactor Synchronization project at Eielson Air Force Base, Alaska. This initiative involves the design and construction required to install a 45MWth/5 Mwe nuclear microreactor, specifically focusing on extending water, power, communications, and heating systems to support plant operations. A primary objective is the synchronization of the nuclear microreactor and the Combined Heat and Power Plant with the base electrical and steam heating distribution grids. The project is funded via MILCON with a target budget of approximately 135 million dollars. The project timeline indicates that planning and development began in December 2025, with a planned construction award in fiscal year 2028, substantial completion by October 2030, and fiscal closeout in fiscal year 2031. Key site challenges include a high water table and likely soil contamination, including PFAS. The government is currently evaluating the most effective contracting vehicle, considering options such as a standard FAR-based Firm-Fixed-Price contract or an Other Transaction Authority approach like Construction Manager at Risk. This RFI is voluntary and intended for market research under NAICS code 237130 to determine industry capabilities and the optimal project delivery method.
W2SN Endist Alaska

POSTED

4 days ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission is soliciting proposals for the installation of a new underground electrical service system at Jacques Cartier Park North in Gatineau, Quebec. The project aims to provide a permanent, higher-capacity power supply to support major events, such as Winterlude, while reducing reliance on diesel generators. The scope of work includes the removal of existing electrical infrastructure and the installation of a new 600V Hydro-Quebec service, a main distribution cabinet, low-voltage distribution for the park and Maison du Vélo, and the provision of power pedestals for temporary event connections. The project is divided into two phases: Phase 1 (Core Scope) focuses on infrastructure and civil works in the western portion of the park near Laurier Street, including chambers CT-1 and CT-2, while Phase 2 (Option Scope) extends to the south-east and north-east kiosks and associated pull manholes. The contract has a one-year term with an option to extend for an additional year. Bidders must be Canadian suppliers and hold specific Régie du bâtiment du Québec (RBQ) licenses, including subclasses 1.4, 1.5, 1.7, and 16, with the electrical subclass requiring a valid CMEQ license. Additionally, the contractor or their subcontractor must be recognized by Hydro-Quebec to perform underground civil and electrical distribution work. Key project requirements include the protection of significant trees, adherence to a spill prevention and response plan, and the reinstatement of the park to its original condition. Award decisions will be based on a two-tiered financial framework; if the combined price for both phases exceeds the budget, the NCC may award the contract for Phase 1 only to the top-ranked proponent. Performance and labour and material payment bonds are required at 50 percent of the project value.
National Capital Commission

POSTED

4 days ago

DEADLINE

in 2 days
View Details
NAICS: 237130
New
SLED
Overhead Contact System Rehabilitation Project Phase 4A – Tasman West/East
Solicitation # C26152F
The Overhead Contact System Rehabilitation Project Phase 4A – Tasman West/East, solicitation number C26152F, is issued by the Santa Clara Valley Transportation Authority for work in Santa Clara, California. The project involves the detailed engineering design, procurement, delivery, installation, and testing of an Overhead Contact System (OCS) within the Tasman West Corridor, specifically on Tasman Drive and East Java Drive. Key technical requirements include the installation of new 300 kcmil contact wire, registration insulators, in-span insulators, and surge arresters, extending from traction power substation feeder breakers to the light rail vehicle pantograph. The contractor must provide detailed construction staging schedules to maintain light rail service and perform a pre-construction survey of all OCS and structural components. Bidders must undergo a rigorous pre-qualification process involving a scored questionnaire, where a total score of 57 to 76 is required to pass. Evaluation factors include the firm's claims history and average gross revenue. Qualified contractors must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 aggregate, as well of workers' compensation insurance. Because work occurs in an active light rail environment and involves the agency's only LRV wash facility, strict adherence to safety procedures and close operational coordination are mandatory. All submissions must be made electronically via the VTA eProcurement portal by the response deadline of November 13, 2026.
Santa Clara Valley Transportation Authority

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS