A00001 to Solicitation CGC CHANDELEUR 2010 DRYDOCK AVAILABILITY is posted 12/18/09. Deadline for receipt of quotations is extended to 4pm EST 12/22/09. The U.S. Coast Guard Surface Fleet Logistics Command intends to issue a commercial Request for Quotes (RFQ) to Small Businesses only. The NAICS code is 336611 and the small business size standard is less than 1,000 employees. The Coast Guard intends to conduct the procurement in accordance with FAR Part 12, Acquisition of Commercial Items, and FAR Subpart 13.5, Test Program for Certain Commercial Items. The RFQ will be issued on or about November 13, 2009. The RFQ will be issued via the Federal Business Opportunity (FEDBIZOPPS) web page at www.fbo.gov. Hard copies of the solicitation and specification will not be issued. A CD-ROM containing all applicable drawings will be sent via U.S. mail if requested. Submit requests far enough in advance to allow sufficient time for processing. Submit requests to Ms. Kathryn Stark at
contact@example.gov. The acquisition is for DRYDOCK REPAIRS to the USCGC CHANDELEUR (WPB-1319), a 110 FOOT B Class Patrol Boat. The home pier of the vessel is located at 100 MacArthur Causeway, Miami Beach, FL 33139. The performance period is forty-two (42) calendar days and is expected to begin on or about 08 FEBRUARY 2010 and end on or about 22 MARCH 2010. There is a geographical restriction associated with this availability. The vessel is restricted to traveling to a facility located within 576 nautical miles from the vessel's homeport in Miami Beach, Florida Travel distances within the restriction allow for two days (48 hrs) of underway transit each way. The scope of the acquisition is for various repairs including but not limited to: Routine Drydocking, Provide Temporary Logistics, Clean and Inspect Fuel Service Tanks, Clean and Inspect Fuel Stowage and Overflow Tanks, Clean and Inspect Oil and Oily Waste Tanks, Clean and Inspect Sewage Collection and Holding Tanks, Clean and Inspect Grey Water Collection and Holding Tanks, Clean Sewage Piping System, Clean Grey Water Piping System, Clean and Disinfect Potable Water Tanks, Preserve Oil and Oily Water Tanks - 100%, Preserve Oil and Oily Water Tanks - Partial, Preserve Sewage Collection and Holding Tanks - 100%, Preserve Sewage Collection and Holding Tanks - Partial, Preserve Grey Water Collection and Holding Tanks - Partial, Preserve and Disinfect Potable Water Tanks - Partial, Preserve Forward Peak Compartment, Preserve Forward Void, Clean and Inspect Heat Exchangers, Inspect MDE Exhaust System, Overhaul Duplex Sea Strainers, Overhaul Stabilizing Fins, Remove, Inspect, and Reinstall Propellers, Remove, Inspect, and Reinstall Propeller Shafts, Overhaul Mechanical Shaft Seal Assemblies, Renew Water-Lubricated Propeller Shaft Bearings, Remove, Inspect and Reinstall Rudder Assemblies, Overhaul Steering Gear Components, Preserve Weather Decks, Preserve Underwater Body - - 100%, Renew Speed Doppler, Renew Depth Indicating Transducer, Inspect and Maintain Cathodic Protection System, Renew Capastic Fairing, Perform Aluminum Hull and Structural Repairs - 1/4" Plate, Perform Aluminum Hull and Structural Repairs - 5/16" Plate, Perform Hull and Structural Plating Repairs -Crack (Aluminum), Perform Hull and Structural Plating Repairs - Eroded Weld (Aluminum), Perform Hull and Structural Plating Repairs - Overlay Welding (Aluminum), Perform Hull and Structural Plating Repairs - Crack, (Steel), Perform Hull and Structural Plating Repairs - Eroded Welds (Steel), Perform Hull and Structural Plating Repairs - Overlay Welding (Steel), Perform Hull and Structural Plating Repairs -Corrugated Plate (4.0-Pound), Perform Steel Hull and Structural Plating Repairs (5-Pound), Perform Steel Hull and Structural Plating Repairs (6.0-Pound or 5.63-Pound), Perform Steel Hull and Structural Plating Repairs (7.5-Pound or 7.65-Pound), Perform Steel Structural Member Repairs -Steel Studs, Remove, Reinstall and Realign Main Diesel Engine, Remove, Reinstall and Realign Reduction Gear Assemblies, Preserve Bilge Surfaces In Various Locations, Renew Insulation in Aft Steering and Battery Space Compartment, Perform Aluminum Hull and Structural Repairs - 3/16 Plate, Renew Structural Closures, Renew Furnishings, Renew Through-Deck Packing Glands, Renew Sea Valves, composite labor rate; GFP report; and laydays. All welding and brazing shall be accomplished by trained welders who have been certified by the applicable regulatory code performance qualification procedures. This requirement will be evaluated using past performance as an evaluation factor. It is incumbent upon contractors to monitor the FEDBIZOPS web page for the RFQ release and subsequent amendments. FEDBIZOPPS also contains an option for automatic notification service. For information concerning this acquisition contact Ms. Kathryn Stark at
contact@example.gov.