Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Homeland Security was posted on November 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CGC SYCAMAORE HYDROTASTIC TESTING SERVICE

Closed
70Z08526Q260000288Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
DIBBS
LADDER, EXTENSION
Solicitation # SPE8E9-27-T-0349
Solicitation SPE8E9-27-T-0349, issued by the Department of Defense DLA Troop Support Construction and Equipment MRO SVC I, is for the procurement of one extension ladder under NSN 5440-01-537-4071. The delivery is required within 167 days after receipt of order, with a need ship date of April 26, 2027, and a final delivery date of September 24, 2027. The item is to be delivered to the DLA Distribution Depot at Hill AFB, Utah. All quotes must be submitted via the DLA Internet Bid Board System by November 9, 2026. The contract mandates strict adherence to quality and packaging standards, requiring compliance with ASTM D3951 for packaging, MIL-STD-129 for marking, and MIL-STD-130N for identification. Manufacturers must maintain an inspection system complying with SAE AS9003 or ISO 9001. Inspection and acceptance will occur at the origin. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and approval from the DLA controlling authority to access export-controlled data subject to ITAR or EAR regulations. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The procurement is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Evaluation for award may include a HUBZone price evaluation preference, and offerors must certify their small business status and compliance with prohibitions on covered defense telecommunications equipment.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
U.S. NAVY VESSEL VOYAGE REPAIR AVAILABILITY (VRA)
Solicitation # N6817127QN004
Solicitation N6817127QN004 is a Request for Quotation issued by NAVSUP Fleet Logistics Center Sigonella, Site Naples, for a Vessel Voyage Repair Availability (VRA) for the USNS T Whitney (LCC 20) in Gaeta, Italy. The scope of work includes 10 Category A work items and 3 Not Separately Priced (NSP) items, focusing on hull and structural steel repairs, communication and navigation calibration, auxiliary machinery piping and hose hydrostatic testing, HVAC duct repairs, and habitability outfitting. The period of performance is scheduled from December 1, 2026, through December 15, 2026. This is a Firm-Fixed-Price contract that is not set aside for small businesses. Award will be granted based on the Lowest Price Technically Acceptable (LPTA) criteria, requiring offerors to be rated as acceptable in technical capability before price evaluation. Key technical requirements include providing proof of an ISO9001 or 14001 Quality Management System, ABS welding certifications for mild carbon steel, and the use of a certified Marine Chemist or Industrial Hygienist for gas free certifications. Amendment 0001 specifically clarifies that costs for asbestos removal and disposal for the fire room LP drain piping repairs must be excluded from initial bids and will instead be handled via Condition Found Reports and Change Orders. Invoicing must be processed electronically through Wide Area Work Flow (WAWF).
Navsup Flc Sigonella Naples Office

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 336611
New
Federal
PIPE/TUBING
Solicitation # 70Z04027Q60718Y00
The U.S. Coast Guard Surface Forces Logistics Center is seeking quotes for a Firm Fixed Price Purchase Order under solicitation 70Z04027Q60718Y00 for various industrial piping and tubing materials. The requirement includes seven specific items: 4 inch stainless steel 304L seamless pipe, 4 inch rectangular aluminum tubing, 1 inch copper tubing, 2 inch seamless steel pipe, 10 inch carbon steel DOM tubing, 6 inch rectangular 6061-T6 aluminum tubing, and 8.625 inch seamless 321 stainless steel pipe. All items have a requested delivery date of May 17, 2027. This is a total small business set-aside under NAICS code 336611, and the award will be based on best value, considering the ability to provide the complete requirement, adherence to the timeframe, and price. Eligible vendors must have an active SAM.gov registration and submit quotes that include all delivery and freight charges, as shipping is required FOB Destination. Deliveries must be made to the U.S. Coast Guard Yard Baltimore Facilities Management in Maryland, adhering to MIL-STD-2073-1E for packaging and MIL-STD-129R for marking and barcoding. Payments are NET 30 and must be processed through the IPP.gov portal. The solicitation is governed by FAR Part 12 for commercial products and services, including specific clauses regarding telecommunications and video surveillance prohibitions and DEI discrimination.
CG-SEA-C23

POSTED

about 10 hours ago

DEADLINE

in 15 days
NAICS: 336611
New
Federal
3389 Large Class Hopper Dredge (LCHD-ESS)
Solicitation # W912BU26RA031
Solicitation W912BU26RA031 is a request for proposals for the design, construction, testing, and delivery of one Large Class Hopper Dredge (LCHD-ESS) to replace the aging Dredge ESSAYONS for the U.S. Army Corps of Engineers, Portland District. The vessel will support missions across Washington, Oregon, California, Alaska, and Hawaii. Key technical specifications include a 6,500 cubic yard hopper capacity, diesel-electric power, azimuthing thruster propulsion, and a loaded draft of 26 feet or less. The vessel must be Jones Act compliant, meet PANAMAX beam requirements, and adhere to ABS classing. Delivery is FOB destination at U.S. Moorings in Portland, Oregon, with a total period of performance of 1,675 calendar days divided into four phases: Planning and Scheduling, Engineering, Construct and Test, and Sea Trials and Delivery. The government will award a fixed-price commercial supply contract with economic price adjustment based on best overall value. Evaluation factors include Technical Approach, Past Performance, Small Business Participation, and Price, with the combined non-price factors weighted approximately equal to price. Proposals must be submitted electronically via the PIEE Solicitation Module by April 15, 2027. Requirements include a bid guarantee, as well as performance and payment bonds equal to 5% of the original contract price. Additionally, the contractor must maintain CMMC Level 2 (Self) cybersecurity status for systems processing federal contract information. To encourage competition, the government has included a stipend provision of up to $1.5 million for eligible unsuccessful offerors.
W2SD Endist Philadelphia

POSTED

about 10 hours ago

DEADLINE

in 6 months

AI Contract Overview

Show more

The contract involves providing specialized technical support for hydrostatic testing of CO2 cylinders onboard the USCGC SYCAMORE (WLB-209), a 225-foot vessel operated by the Coast Guard. The primary objective is to ensure the structural integrity and operational reliability of the fire suppression system by verifying that the CO2 cylinders meet pressure standards through hydrostatic testing. The contractor is responsible for all aspects of the process, including safely removing the cylinders from their mounts, transporting them to an approved testing facility, conducting the tests in compliance with federal and industry regulations, and reinstalling the cylinders once testing is complete. The scope also includes documenting the condition of each cylinder before testing, managing any failures by replacing cylinders as authorized, and ensuring the system is properly re-armed and leak-free after reinstallation. The contract emphasizes strict adherence to safety and regulatory standards, with detailed procedures for handling, testing, and disposal of cylinders. It requires qualified personnel with documented training and experience in hydrostatic testing. The work must be completed by December 1, 2025, with the primary performance location being the USCGC SYCAMORE in Newport, Rhode Island, and the testing conducted at an approved external facility. Deliverables include detailed documentation of each cylinder’s condition, test results, certification from the testing facility, and records of any replacements or repairs. The contract is set aside for small businesses under the SBA, with a focus on compliance with applicable specifications and standards, and it involves coordination with designated Coast Guard personnel to ensure proper execution and acceptance of the work.

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Newport, RI, 02841, USA

Set-Aside

SBA

Documents

1

CO2 Hydrotest Statement of Work

DOCX, High priority: read this first4 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more

Statement of work for USCGC SYCAMORE CO2 Cylinder Hydrostatic Testing


CGC SYCAMORE has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).


1.0 GENERAL


1.1 Background


The 225’ WLB asset, USCGC SYCAMORE utilizes CO2 cylinders as part of its fire suppression systems. These cylinders require periodic hydrostatic testing to ensure their structural integrity and prevent failure, which could compromise the effectiveness of the fire suppression system and are critical to the unit’s ability to get underway.


1.2 Scope


 The scope of this contract is defined by the efforts and tools required to support USCGC SYCAMORE (WLB-209). The Contractor shall provide all labor, materials, and tools necessary to remove bottles, deliver to testing facility, perform hydrostatic testing on the CO2 cylinders as outlined below, and reinstall in accordance with applicable regulations and MPC procedures.


1.3 Objective


The goal is to perform hydrostatic testing on the CGC SYCAMORE's CO2 cylinders to verify their pressure integrity, identify any cylinders that fail to meet specified operational standards, and ensure the CO2 fire suppression system remains operational and reliable.


1.4 APPLICABLE DOCUMENTS


1.4.1 Compliance Documents


The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:


  • Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000 General Requirements, 5550 Fire Prevention and Response

2.0 SPECIFIC REQUIREMENTS/TASKS


2.1 CO2 Cylinder Removal, Transport, Hydrostatic Testing, and Reinstallation


2.1.1 Removal and Preparation: The Contractor shall:


  • Remove all CO2 cylinders to be tested from mounting racks and brackets, as directed by the Engineer Officer (EO) or designated representative. The number of cylinders to be tested is 12.
  • Carefully handle the cylinders, ensuring they are held or laid horizontally on the deck to prevent them from standing freely on their end.
  • Document the cylinder location, serial number (if applicable) and any visible damage on each cylinder.
  • Work with ship’s forces Lockout/Tagout procedures related to disconnecting the CO2 system before cylinder removal, referencing COMDTINST 9077.1 (series).
  • Prepare the cylinders for transportation to the testing facility, ensuring they are securely packaged and transported in accordance with DOT regulations.

2.1.2 Hydrostatic Testing: The Contractor shall:


  • Deliver cylinders to hydrostatic testing facility.
  • Ensure the hydrostatic testing is performed in accordance with all applicable regulations.
  • Monitor the testing process to ensure compliance with regulations and quality control standards.

2.1.3 Post-Test Inspection and Handling: The Contractor shall:


  • Receive tested cylinders from the test facility.
  • For cylinders that pass:
    • Ensure the new hydrostatic test date is correctly stamped on the CO2 cylinder shoulder and paper tags and logs as required by the EO.
  • For cylinders that fail:
    • Inform the EO (POC: CWO-2 Frank Levitsky. contact@example.gov ) or the EPO’s designated representative immediately.
    • At the approval of the asset manager in section 8, replace the CO2 cylinder with a new or re-certified cylinder that meets or exceeds OEM specifications. Ensure the replacement cylinder meets all DOT regulations.
    • Dispose of the failed cylinder in accordance with all applicable federal, state, and local regulations.
  • Handle all cylinders with care, maintaining them in a horizontal position or secured manner until re-installed.

2.1.4 Re-installation and System Re-Arming:


The Contractor shall:


  • Install CO2 cylinders into mounting racks and brackets.
  • Ensure all cylinder brackets are tight.
    • NOTE: There is no torque value required, do not over tighten.
  • Re-arm the CO2 system, (Refer to MPC R-C-17973, R-S-1574, R-S-17582, or R-S-17926 – Ensure the correct MPC is referenced and remove the others.).
  • Ensure all safety devices are free of leaks and functioning correctly.

2.1.5 Final Steps:


The Contractor shall:


  • Notify EO of any discrepancies, repairs, or future actions.
  • Work with ship’s force to reconnect necessary Operating Components and Remove Lockout/Tags-plus Material and Hardware IAW COMDTINST 9077.1 (series).
    • Remove Red Danger Tags from actuation stations.
  • Remove warning signs.
  • Ensure ventilation systems to CO2 protected spaces are operating normally.
  • Restore equipment to the normal status.
  • Record any maintenance actions.

2.2 Documentation The contractor will provide the following documentation to the EO and Asset Manager.


  • The location, serial number and damage documented prior to testing.
  • Documentation for each cylinder showing Pass/Fail status and if replacement cylinder installed.
  • DOT certification from the testing facility.
  • Any other required documentation.

3.0 CONTRACTOR PERSONNEL


The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. Personnel performing the hydrostatic testing shall have documented training and experience in hydrostatic testing procedures and be certified to do so. All personnel shall be familiar with CO2 cylinder handling safety procedures.


4.0 OTHER APPLICABLE CONDITIONS


4.1 Period of Performance


The period of performance for this contract shall be agreed upon between the ship’s EO, Asset Manager, and be completed no later than December 1, 2025.


4.2 Place of Performance


The primary place of performance will be the USCGC SYCAMORE (WLB-209) for cylinder removal and installation, and the Contractor's approved testing facility for the hydrostatic testing.


Address:


CWO Frank Levitsky


CGC SYCAMORE


47 Chandler St.


NAVSTA Newport


Newport, RI 02841


5.0 GOVERNMENT FURNISHED RESOURCES


None.


6.0 CONTRACTOR FURNISHED PROPERTY


The Contractor must furnish all facilities, materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in section 2.0 and 5.0. This includes, but is not limited to: transportation of cylinders, hydrostatic testing services, approved testing facility, replacement cylinders (if needed), all necessary tools, safety equipment, and documentation materials.


7.0 GOVERNMENT ACCEPTANCE PERIOD


The EO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EO will sign for the service notifying that the deliverable has been accepted.


8.0 DELIVERABLES


  • Documentation for each CO2 cylinder, including serial number, initial condition, and hydrostatic testing result (pass/fail).
  • Certification from the testing facility, verifying compliance with USCG regulations.
  • Documentation of any replacement cylinders used, including manufacturer's specifications and compliance.
  • Verification of proper CO2 system re-arming, including leak testing results.
  • Delivery of all required documentation to the EO and Asset Manager (ENS Marcos Saldarriaga. Phone: +1 (555) 000-0000. E-mail: contact@example.gov ) upon completion of the work.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS