Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

City of Redding Pump House 1 Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Redding is undertaking the Pump Station 1 Replacement Project to modernize its water diversion infrastructure on the Sacramento River by relocating its licensed point of diversion approximately 0.3 miles upstream, near the Diestelhorst Bridge in Shasta County, California. This initiative involves constructing a new state-of-the-art fish screen, intake, and pumping plant to replace the existing facility, while simultaneously demolishing the old structure and restoring Jenny Creek to an open channel as part of broader environmental mitigation efforts. The project requires amendments to Water Rights Licenses 1849, 2640, and 5677 and is subject to strict regulatory oversight by the Central Valley Regional Water Quality Control Board and the State Water Resources Control Board under the California Environmental Quality Act. Compliance with CEQA mandates the adoption of a Final Environmental Impact Report, a Mitigation Reporting and Monitoring Plan, and a Statement of Overriding Considerations, all of which have been approved and are publicly accessible at Redding City Hall and online. The project is solicited under number 5A45CR00668, with an issuance date of April 17, 2026, and formal approval granted on October 8, 2025. The City of Redding serves as both the applicant and the contracting entity, with no external federal procurement structure or FAR-compliant contract clauses identified. There is no published contract value, pricing details, or defined period of performance, and no formal evaluation factors, payment instructions, or contracting officer designations are specified, reflecting a locally administered environmental infrastructure initiative rather than a federal acquisition. Key contacts include Amber Kelley, City of Redding’s Environmental Compliance Manager, and Lynn Coster of the Central Valley Regional Water Quality Control Board, who oversee compliance and coordination. All deliverables are tied to environmental outcomes, including ecological restoration and regulatory adherence, with no conventional commercial or logistical requirements such as packaging, invoicing systems, or delivery terms outlined. The absence of federal procurement elements underscores the project’s reliance on state environmental law and local governance to advance its objectives.

General Info

Redding replaces Pump Station 1, relocates diversion upstream, installs fish screen, restores Jenny Creek, and amends water rights under state environmental rules.

Agency

California → City of Redding

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Benton drive, Redding, CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for City of Redding Pump Station 1 Replacement Project

PDFnotice-of-determination

5A45CR00668 Pump Station 1 Replacement Project CEQA Notice of Determination

PDFceqa-notice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Redding
Office AddressN/A
Contacts
Mina Mohammadzadehwater resource control engineer
Amber Kelley/Lily TroyEnvironmental Compliance Manager

Full Description

Show more
The City of Redding requested minor changes to its water right Licenses 1849, 2640, and 5677 to allow the relocation of its licensed point of diversion (PS No.1) approximately 0.3 miles upstream of its existing location on the Sacramento River. The new PS No.1 will include a new state-of-the-art fish screen, intake, and pumping plant to replace the existing diversion.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details