Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Coastwide Beach and Dune Ecosystem Restoration

Closed
W9127826RA011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
2026-012-247A Meramec Greenway: Unger County Park Tail Realignment
Solicitation # 247A
Great Rivers Greenway is soliciting electronic bids via Bid Express for the Meramec Greenway: Unger Park Realignment project in St. Louis County and Fenton, Missouri. The scope of work includes the realignment of the Meramec Greenway within Unger Park and a trail extension to the terminus at Soccer Park Road and Yarnell Road. Key project components include the construction of a new trailhead with a parking lot, modifications to the Unger Park Disc Golf Course, the creation of two lookouts above the Meramec River, and the installation of landscaping, site amenities, and wayfinding signage compliant with 2023 MUTCD and 2010 ADA standards. All work must be executed according to California Department of Transportation standards and regulations, with specific requirements for plant quality and earthwork density testing. Bids are due by December 15, 2026, and must include a complete Equipment Hourly Rates Schedule and a 5% bid security. The contract will be awarded to the apparent low bidder, provided they are deemed responsible and qualified, with the requirement to submit an AIA Form A305 qualification statement within two business days of a request. The successful contractor must comply with Missouri prevailing wage laws, provide performance and payment bonds via AIA Document A312, and adhere to a detailed work schedule with monthly electronic updates. Administrative requirements include a structured payment process where the Developer's Representative issues a Certificate for Payment within seven days of receiving an application. Additionally, contractors must comply with the Anti-discrimination Against Israel Act and USACE permit conditions.
Great Rivers Greenway

POSTED

about 4 hours ago

DEADLINE

in 29 days
NAICS: 237990
New
SLED
Thickener Improvements Project
Solicitation # 2026-28-WRF
The City of Cumberland, Maryland, is soliciting bids for the Thickener Improvements Project (City Project No. 2026-28-WRF) at the John J. DiFonzo Water Reclamation Facility. The scope of work includes the replacement of the thickener drive and the sandblasting and tar painting of all exposed metal on the thickener system using Mortarclad, Series 218 by TNEMEC. The contractor must ensure the facility remains operational during construction and is responsible for capturing and disposing of all debris offsite. Key deliverables include the submission of fall protection plans at least seven calendar days prior to mobilization and the delivery of final as-built drawings in both hard copy and digital AutoCAD and PDF formats. Bids must be submitted via the city's online solicitation website by 2:00 p.m. on December 17, 2026, and must include a proposal guaranty of at least 5% of the total bid. The contract will be awarded to the responsible and responsive bidder offering the lowest evaluated bid price. For contracts exceeding $100,000, a performance bond of 100% of the contract price and a payment bond are required. Payment is processed monthly for work exceeding $500 net, with a 10% retainage per payment capped at 5% of the total contract value. All work must adhere to OSHA safety standards and MDOT SHA Section TC-7.03 for force account work.
City of Cumberland

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
Streambank Stabilization and Utility Pole Repair Project
Solicitation # 7898988
The Streambank Stabilization and Utility Pole Repair Project is a critical infrastructure initiative for the Village of Johnson, Vermont, following a July 2024 flood that eroded the Gihon River bank and compromised a utility pole providing power to essential facilities, including the fire station and wastewater treatment plant. The project requires a qualified contractor to provide all labor, materials, and equipment to secure the utility pole and stabilize the stream bank. The work must be completed and demobilized by July 30, 2027, with construction access managed via Route 15. The project is funded through the VT DEC Design/Implementation Block Grant via the LCPC and Watersheds United Vermont, with an estimated probable cost between $100,000 and $200,000. The contract will be awarded to the lowest responsive bidder, with evaluations based on personnel qualifications, past similar projects, and the ability to meet the project timeline. Bidders must submit a sealed bid by December 7, 2026, including a bid guarantee of 5%, a non-collusion affidavit, a debarment affidavit, and a worker classification compliance form. The selected contractor must provide performance and payment bonds for 100% of the contract price and maintain comprehensive insurance, including $1,000,000 per occurrence and $2,000,000 for products/completed operations. Additionally, the State of Vermont has established a 10% participation goal for Disadvantaged Business Enterprises. Final payment is contingent upon a site inspection and approval by the project engineer from DuBois & King, Inc.
Department of Economic Development

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 237990
New
SLED
DNR-250064
Solicitation # DNR-250064
The Ohio Department of Natural Resources is soliciting bids for the Shawnee Marina Seawall Slip project located at the Shawnee State Forest in Stout, Scioto County. The scope of work involves the construction of a seawall slip, specifically requiring the installation of W18x97 steel piles and the drilling of shafts both above and below rock. The project is subject to domestic steel use requirements per Ohio Revised Code Section 153.011 and must adhere to AWS D1.1 structural welding standards. The general contract is estimated at $1,502,347.00, with five additive alternates available for additional 10ft seawall sections at $82,000.00 each. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid security form, a power of attorney, and an EDGE affidavit, with a project participation goal of 5.0 percent for EDGE-certified businesses. Compliance with prevailing wage rates, Equal Employment Opportunity requirements, and various state executive orders regarding domestic services and Russian institutions is mandatory. The contractor is required to provide a critical path construction progress schedule and must maintain materials in original containers on-site. Payment is processed via contractor payment requests, with a draft pencil copy required one week prior to formal submission and payment issued within 30 days of acceptance by the Architect/Engineer.
Ohio Department of Natural Resources

POSTED

about 5 hours ago

DEADLINE

in 3 days
NAICS: 237990
New
SLED
DNR-250078
Solicitation # DNR-250078
The Ohio Department of Natural Resources (ODNR) is soliciting bids for the Lake Logan Dam Improvements project located in Falls Township, Hocking County, Ohio. This general contracting project focuses on critical infrastructure upgrades, including a Lake Drain Tower pedestrian access bridge, parking lot catch basins, piping, and concrete gutters, with an optional alternate for a spillway pedestrian crossing bridge. The estimated period for substantial completion of all work is 365 days. The contract includes specific financial allowances for parking lot restoration at 150,000 dollars and monitoring instrumentation at 130,000 dollars, while the alternate spillway bridge is valued at 150,000 dollars. The project is designated as a state of Ohio prevailing wage project and requires strict adherence to ACI 301 concrete standards and ASTM E329 or ASTM C1077 testing documentation. The contractor is responsible for all construction means, methods, and safety programs, with water-control measures requiring approval from ODNR Dam Safety. Bidders must provide comprehensive certifications regarding Ohio ethics laws, conflict of interest laws, and Executive Orders 2019-12D and 2022-02D. Required submission materials include a bid bond or cashier's check, drug-free workplace certificates, and EDGE program commitments, with original security documents due to the contracting authority within three days of the bid.
Ohio Department of Natural Resources

POSTED

about 5 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Federal
Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging
Solicitation # W912PM27BA002
The U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center, is soliciting bids for a firm-fixed-price contract to perform maintenance dredging at the Calcasieu River Bar Channel in Louisiana, Pascagoula Harbor in Mississippi, and Panama City Harbor in Florida. The project requires a self-propelled, trailing suction-type hopper dredge capable of operating 24 hours a day, seven days a week. Specific depth requirements include -45 feet MLLW for Calcasieu, -46 feet MLLW for Pascagoula, and -40 feet MLLW for Panama City. Performance is scheduled to begin in the Calcasieu River Bar Channel by January 30, 2027, followed by Pascagoula Harbor from April 1 to July 31, 2027, and Panama City Entrance Channel from August 1 to September 30, 2027. Award will be made as a whole to a single responsible bidder based on the lowest price, with a 10 percent price evaluation preference for HUBZone small businesses. Bidders must select one of four bid lots based on their dredge's pump size and hopper capacity. Key requirements include registration in the System for Award Management, submission of bids via the PIEE website in PDF format, and the provision of a bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less. The successful contractor must adhere to EM 385-1-1 safety standards, implement sea turtle protection measures, and provide a certified chief surveyor. Performance and payment bonds are required at 100 percent of the original contract price upon award.
W074 Endist Wilmington

POSTED

about 7 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Coastwide Beach and Dune Ecosystem Restoration project, solicitation W9127826RA011, is a Firm-Fixed-Price contract issued by the U.S. Army Engineer District, Mobile. This 8(a) sole source procurement focuses on ecosystem restoration in Hancock County, Mississippi, specifically targeting the population of dune footprints with vegetation and the installation of sand fencing to promote natural dune building and sand accumulation. The scope of work includes the removal of invasive species, the collection and planting of 169,670 planting units, and the restoration of temporary support facilities. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars. Performance is subject to strict quality and safety standards, including mandatory compliance with USACE EM 385-1-1 and the provision of a dedicated Site Safety and Health Officer. Final acceptance is based on an 80 percent survival rate of installed plant types and 80 percent area occupancy across four designated planting zones. The contractor must provide specialized personnel, including a Professional Land Surveyor as Party Chief and qualified turtle and bird monitors. Administrative requirements include the use of the Resident Management System for invoicing and a minimum self-performance requirement of 15 percent for the prime contractor. Proposals must be submitted via PIEE by October 30, 2026.

General Info

US Army project for beach and dune ecosystem restoration in Hancock County, Mississippi.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Hancock County, Mississippi, AL, 39525

Set-Aside

8A

Documents

2
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ADVANCE NOTICE: Rail Modernization ProgramOpen now, due in 318 days
  • Request for Quote for The Recharge Master Plan Update at Montclair BasinOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
Contacts2 people available
OfficeMOBILE, AL, 36602-3630, USA

Full Description

Show more
The intent of this specification is to populate the proposed dune footprint with dune vegetation in a planting scheme that will naturally accumulate sand and promote natural dune building. Planting will be completed following the sand fence installation. Sand fencing and plantings are designed to promote additional growth of the dune system by disrupting the flow of windblown sand.

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 562910
New
Federal
Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP)
Solicitation # W9127827RA002
The Fiscal Year 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP) is a small business set-aside solicitation for a single-award, 10-year firm-fixed-price contract. With an estimated value between 25 million and 100 million dollars, the project covers comprehensive performance-based environmental remediation at Eglin Air Force Base, Hurlburt Field, and Tyndall Air Force Base in Florida. The scope of work includes investigation, design, construction of remedial systems, operation and maintenance, and remedy optimization across 58 Installation Restoration Program sites and 5 Military Munitions Response Program sites. Key activities range from preliminary assessments and remedial investigations to long-term management and site closeout, with specific tasks such as RCRA permit renewals and well abandonment. The government will utilize a Best Value Tradeoff analysis for the award, where non-price factors—specifically technical approach, risk management, project management, and past performance—are significantly more important than price. Proposals must be submitted via the Procurement Integrated Enterprise Environment between December 7 and December 18, 2026, in two separate volumes covering technical/management approaches and administrative/pricing requirements. Contractors must adhere to strict safety and environmental standards, including EM 385-1-1 and OSHA 29 CFR 1910.120, and comply with rigorous hazardous materials packaging and labeling regulations. Administration of the contract will be handled through the Wide Area WorkFlow system for invoicing and payments.
Remediation Services

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Pensacola Harbor Navigation Channel Maintenance Dredging
Solicitation # W9127827BA002
Solicitation W9127827BA002 is an Invitation for Bid issued by the Department of Defense, W074 Endist Mobile, for the Pensacola Harbor Navigation Channel Maintenance Dredging project. The scope of work requires the contractor to provide all labor, management, and equipment, including hydraulic cutterhead pipeline, trailing suction hopper, or mechanical dredges, to perform maintenance dredging from Station 202+00 to 301+00. The project involves excavating sand to a depth of 30 to 39 feet and placing the material along Perdido Key Beach. All dredging and placement activities must be completed by April 1, 2027, with the contractor utilizing the USACE Dredging Quality Management Program for monitoring. This is a Firm-Fixed Price contract that will be awarded to the overall low bidder for the Base Bid, with a 10 percent price evaluation preference available for HUBZone small business concerns. Bids are due by November 24, 2026, and must be submitted electronically via the Procurement Integrated Enterprise Environment. The contract includes liquidated damages of 5,534.00 dollars per calendar day of delay and requires performance and payment bonds. Compliance with the Davis-Bacon Act, EM 385-1-1 safety standards, and FDEP environmental permits is mandatory. Acceptance of the work is based on the removal of 95 percent of the material from the required dredging prism, verified by high-frequency survey data.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
Federal
KC-46A ADAL Apron and Hydrant Fueling Pits
Solicitation # W9127825RA068
Solicitation W9127825RA068 is a design-bid-build construction project for the KC-46A ADAL Apron and Hydrant Fueling Pits at MacDill Air Force Base, Florida, managed by the U.S. Army Corps of Engineers, Mobile District. The project has an estimated construction cost between 60 million and 120 million dollars and a completion timeline of 1,050 calendar days. The primary scope of work includes the full-depth removal and replacement of the north apron and perimeter taxilane pavement with Portland Cement Concrete, upgrading the storm drainage system, and enhancing the fuel hydrant system to support the simultaneous fueling of four aircraft at 600 GPM each. Technical upgrades to the fuel system involve replacing five 100 HP motors with 125 HP motors, increasing impeller sizes, and installing 275 PSI pressure rated filter separator vessels. Additional requirements include the installation of taxiway lighting, nose gear mooring points, and the implementation of a comprehensive Contractor Quality Control program. The government will award a single firm-fixed-price task order using a Best Value Trade-Off approach, where non-priced evaluation factors—specifically past performance and technical approach—are significantly more important than price. Pricing is evaluated using a Pricing Includes Variation Over Time strategy, with the Total Adjusted Price serving as the primary indicator. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal, consisting of an administrative volume and a technical volume. The solicitation includes a 10 percent price evaluation preference for HUBZone small business concerns and requires a minimum of 23 percent small business participation. Performance must begin within 8 calendar days of award, and all work must adhere to USACE, OSHA, and ADA standards.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
Federal
W9127827SC002 FY28 Horizontal Launch Infrastructure, SPOTFi (OTA) Progressive-Design-Build OT
Solicitation # W9127827SC002
The U.S. Army Corps of Engineers Mobile District is issuing a special notice for the FY28 Horizontal Launch Infrastructure, SPOTFi project under solicitation W9127827SC002. This effort utilizes a Progressive Design-Build approach under 10 USC 2808a Other Transaction Authority for Construction. The project is located at Cape Canaveral Space Force Station in Brevard County, Florida, and consists of three horizontal infrastructure projects: the construction of two underground electrical distribution runs and the widening of the ICBM road. The project will be executed in two primary phases, beginning with design development and preconstruction services, followed by final design and construction. The contract will be a Firm-Fixed-Price agreement awarded to the most qualified progressive design-build entity. The selection process is a streamlined two-step competition starting with the submission of a Statement of Qualifications, followed by pitch meetings for down-selected companies. This notice serves as an informational and planning tool for interested parties to provide feedback prior to the official solicitation release. Primary coordination is managed through the USACE Mobile District, with point of contact responsibilities shared between Kyle Rodgers and Jessica Raulerson.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS