Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Compton 60

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Compton 60 project, proposed by G3 Urban, involves the development of a 4.37-acre site at 2320 North Parmelee Avenue in Compton, California. The project consists of 60 two-story single-family residential homes, including 48 market-rate and 12 affordable units, designed as an all-electric community with a maximum building height of 30 feet. Site features include a mix of one- and two-car garages, 21 guest parking spaces, and a gated primary entrance on Parmelee Avenue with a separate gated emergency access point. Landscaping amenities will include decorative paving, open spaces with shade swings, benches, and game tables, while each home will feature private side and rear yards. Infrastructure improvements include comprehensive grading and the installation of sewer, storm water, and water utilities, including connections to the Los Angeles County Sanitation District and existing water mains. The project requires several discretionary approvals from the City of Compton, specifically a Conditional Use Permit, Tentative Tract Map No. 84563, and Design Review. Environmental assessments conducted under CEQA guidelines, including an Initial Study from July 2026 and a geotechnical design report by Albus and Associates, have led the City to determine that an Environmental Impact Report is required. A public review period for the environmental documentation was scheduled from September 17, 2026, to October 16, 2026.

General Info

G3 Urban will build 60 all-electric homes in Compton, California, requiring environmental reports.

Agency

California → City of Compton

Place of Performance

Parmelee Avenue/El Segundo Boulevard, Compton, CA, 90222

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Interested Companies (1)

CAJA Environmental ServicesChatsworth, CA

Full Description

Show more
The Project includes development of the Project Site with 60 single-family residential homes, including 48 market-rate homes and 12 affordable homes. Each home would be two stories with a maximum building height of 30 feet. The Project is proposed as an all-electric community. Landscaping amenities include decorative paving at the entrance of the Project, open space with a shade swings, bench, and game table. Trees and other landscaping vegetation are proposed throughout the site and along the Project Site frontage where applicable. Each home would have a private side and rear yard. A Project site plan is included in Figure 3. Forty-eight homes would have a two-car garage, and twelve homes would have a one-car garage. Twenty-one guest parking spaces would also be provided at the site. Vehicular access to the Project Site would be provided via a gated ingress/egress driveway near the northeast corner of the site on Parmelee Avenue. A gated emergency-access-only ingress/egress driveway would be located near the southwest corner of the site on Parmelee Avenue. Access to the individual homes would be provided via private roadway. Site improvements include grading; sewer, storm water, water, and dry utilities; and street improvements. Sewer conveyance improvements include a connection to an existing Los Angeles County Sanitation District sewer line within the project’s boundaries, a main line located in the internal streets, and individual sewer laterals to each unit. Storm water conveyance improvements include a main line located in the internal streets, on-site catch basins, on-site biofiltrations vaults, and an on-site parkway culvert to allow for storm water sheet-flow to an existing storm drain at Parmelee Avenue. Water conveyance improvements include a main line located in the internal streets, laterals to each unit, three fire hydrants, and two offsite connections to an existing water main located within the adjacent Parmelee Avenue right-of-way. Internal street improvements include rolled curb, zero-inch curb, and paved streets. In addition to the utility connections within Parmalee Avenue, sidewalk, curb and gutter, and street improvements would be installed along the Project Site frontage along Parmelee Avenue. The Applicant is seeking the following discretionary approvals from the City: • Conditional Use Permit (Case No. 24-007); • Tentative Tract Map No. 84563 (Case No. 24-002); and • Design Review (Case No. 24-00136) Other approvals and permits from the Department of Building and Safety and other municipal agencies would be required for Project construction actions including, but not limited to demolition, excavation, shoring, grading, foundation, and building.

Similar Contracts

Same NAICS industry code

NAICS: 236117
New
SLED
Murphy Village ProjectThe Murphy Village Project is a large-scale residential redevelopment initiative located at 1020 McCarthy Blvd in Milpitas, California. Managed by the City of Milpitas with Toll Brothers serving as the applicant, the project involves the demolition of the existing Milpitas Business Park to make way for a comprehensive community on a 38.5-acre site. The development plan includes subdividing the land into 300 lots and constructing a total of 791 residential units across two distinct phases. This housing mix features 174 single-family detached homes, 381 townhomes, and 236 apartment units. The residential layout includes 555 three-story attached and detached units, while the remaining 236 units will be housed in a five-story apartment building that wraps around a six-story parking garage. Notably, the apartment component is designated as 100 percent affordable housing intended for very low to low-income households. In addition to the residential structures, the project will incorporate private open space parcels, common area lots, parks, and necessary infrastructure to support the new community. The City of Milpitas Planning Department has initiated the environmental review process, issuing a Notice of Preparation for an Environmental Impact Report (EIR) in accordance with the California Environmental Quality Act (CEQA). This formal process ensures that the environmental impacts of the redevelopment, including the transition from a business park to a high-density residential area, are thoroughly evaluated. The project represents a significant transformation of the site into a diverse residential neighborhood designed to provide a variety of housing types and essential community amenities.
City of Milpitas

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236117
New
SLED
9001-9019 Long Beach Boulevard Habitat for Humanity ProjectThe 9001-9019 Long Beach Boulevard Habitat for Humanity Project is a residential development in South Gate, California, focused on the creation of affordable housing. The scope of work involves the demolition of all existing on-site improvements on a 0.66-acre site to construct 14 two- and three-story attached townhomes across four buildings. These units will total 18,656 square feet of building area with a combined footprint of 9,772 square feet and a maximum height of 33 feet, two inches. Additional site features include a 1,000-square-foot community center, 950 square feet of open common space, guest surface parking, outdoor benches, and perimeter and interior landscaping. The project also includes a Tentative Tract Map to facilitate the subdivision and sale of individual units. The project has undergone extensive environmental review to comply with CEQA and NEPA standards, resulting in a Notice of Determination filed on July 24, 2026, confirming that no significant environmental effects are expected. Comprehensive assessments were conducted regarding air quality, greenhouse gas emissions, noise impacts, and local transportation, with the latter indicating 65 net additional daily trips. Geological and cultural resource studies were performed, including tribal consultations and hazardous materials assessments, which found no significant historical resources or current hazardous materials on site. The project is funded through the HOME Investment Partnerships Program and is managed by the City of South Gate.
City of South Gate

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 236117
Grant
HOME Housing Production Investment Fund 2027
Solicitation # https://www.nj.gov/dca/dhcr/forms/docs/homehpirfpfinalpackage.pdf
The HOME Housing Production Investment Fund 2027 is a state grant opportunity administered by the New Jersey Department of Community Affairs (DCA) to increase the supply of decent, affordable housing for low- and very low-income households. Open to both for-profit and non-profit affordable housing developers, the program funds the new construction or rehabilitation of permanent rental units and for-sale homeownership units, including single-family homes, condos, co-ops, and specific two-family configurations. Applications are accepted on a rolling basis through June 30, 2027, or until all available funds are committed. Funding is provided as a subsidy with maximum per-unit limits based on bedroom count, ranging from 187,658 dollars for studios to 371,477 dollars for units with four or more bedrooms. A maximum of 11 units per project may be assisted with HOME funds. Projects must be completed, including initial lease-up or sale, within four years, and construction on vacant land must begin within 12 months of the grant agreement. Award evaluations focus on construction cost reasonableness, financial feasibility, market demand, and developer capacity, while ensuring compliance with 24 CFR Part 92 and various environmental and hazard factors. Strict technical and regulatory standards apply, including mandatory Energy Star certification verified by a third-party consultant and adherence to the Fair Housing Act and Uniform Federal Accessibility Standards. Specific requirements include water efficiency flow rates, automatic fire suppression for certain projects, and certified lead abatement for buildings constructed before 1978. Applicants must submit their proposals electronically via the DCA SAGE and HPU portals, providing comprehensive documentation including pro formas, professional resumes for key project roles, and required certifications regarding lobbying and debarment.
NJ Department of Community Affairs

POSTED

11 days ago

DEADLINE

in 7 months
View Details
NAICS: 236117
SLED
26 Shank Painter Road Housing Development
Solicitation # FY27-RFP-047
The Town of Provincetown is soliciting proposals under RFP FY27-RFP-047 for the design, construction, and development of mixed-income ownership housing on two town-owned parcels located at 26 Shank Painter Road and 15 Browne Street. The project aims to create year-round units for first-time homebuyers, with a preferred affordability range of 80% to 150% Area Median Income (AMI), though levels between 80% and 200% AMI are acceptable. Local preference will be given to individuals living or working in Provincetown or those with children in local schools. The selected developer will enter into a Purchase and Sale Agreement and a Land Development Agreement, with a target for project completion within three years of the sale agreement's execution. Qualified proposers must demonstrate at least five years of housing development experience, a track record of at least two similar projects, and the capacity to begin permitting within 60 days of the agreement. The Town has approved a potential financial contribution of up to 4 million dollars to serve as the last money in to ensure project feasibility, subject to a grant agreement and a perpetual affordable housing restriction. Development must comply with the Provincetown Zoning Bylaw and may leverage an existing Development of Regional Impact decision from the Cape Cod Commission. Proposals are due by November 30, 2026, and will be evaluated based on developer experience, site and building design, financial feasibility, and community need.
Housing

POSTED

14 days ago

DEADLINE

in 13 days
View Details
NAICS: 236117
SLED
Move-In Mass/A Homeownership Production Pilot Program
Solicitation # BD-23-1213-MA001-MA001-134728
MassHousing, in collaboration with the Executive Office of Housing and Livable Communities, is soliciting proposals from qualified non-profit and for-profit developers to produce approximately 20 starter homes across the Commonwealth of Massachusetts. This pilot program, known as Move-In Mass, provides up to 10 million dollars in low-cost non-amortizing loans to as many as three selected sponsors. The initiative specifically targets the use of cost-effective construction methods, including CrossMod, 3D volumetric modular, 1D kit-of-parts, and 2D panel systems, to increase homeownership. All homes must be installed on permanent foundations or crawl spaces and comply with the Massachusetts State Building Code, HUD standards where applicable, and all federal, state, and local accessibility and fair housing regulations. The award process involves a two-stage review consisting of a threshold eligibility check for completeness and legal standing, followed by a comparative review focusing on financial feasibility, construction readiness, team capacity, marketability, and alignment with program preferences. Key financial constraints include a maximum developer fee and overhead of 10 percent of total development costs, infrastructure costs below 50,000 dollars per home, and a maximum subsidy of 150,000 dollars per unit. Applicants must submit a comprehensive package via the MailGate folder by February 25, 2027, including a non-refundable 1,000 dollar application fee. Final award determinations are made by the Executive Office of Housing and Livable Communities.
MassHousing

POSTED

25 days ago

DEADLINE

in 3 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS