Concrete Curb, Gutter, and Sidewalk Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete Curb, Gutter, and Sidewalk Installation involves the replacement of exterior pedestrian infrastructure for prime contractors working on Seattle Public Schools facility projects. The scope of work requires the replacement of approximately 80 percent of existing sidewalk and curb infrastructure to ensure all installations are fully ADA-compliant and meet the specific requirements set by the Seattle Department of Transportation. The project focuses on delivering modernized, accessible pedestrian pathways and curbs. It is categorized under NAICS code 237310 and is associated with the Lowell Elementary School Modernization and Addition project.

General Info

Documents

This scope was carved out of RFQ261001.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AE for Lowell ES Modernization and Addition

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Seattle Public Schools
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs replacement of exterior pedestrian infrastructure for prime contractors on Seattle Public Schools facility projects. Replaces approximately 80% of existing sidewalk and curb infrastructure. Ensures all work meets ADA standards and Seattle Department of Transportation (SDOT) requirements. Delivers new ADA-compliant sidewalks and curbs.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, civil works, and surface improvements. Specific requirements encompass land surveying, site clearing, shoring, asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additionally, the project requires environmental and support services including storm water pollution prevention (SWPPP), quality control, and the supply of ready mix and precast concrete. This opportunity is specifically targeted toward qualified Small Business (SB), Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and a shared use path, including HMA paving, storm sewer improvements, and the installation of manholes and catch basins. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter. The engineer's estimate for the project is 1,111,000 dollars, and the work will be entirely funded by the City of Zeeland. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. Bids will be evaluated on a unit price basis, and only bidders prequalified by the City of Zeeland will have their proposals opened. Submissions must include a proposal guarantee in the form of a bid bond or certified check for five percent of the bid amount. The successful contractor will be required to provide performance and lien bonds for 100 percent of the contract value, as well as certification of Workmen's Compensation Insurance. All work must adhere to MDOT Standard Specifications for Construction and be performed by a licensed DC contractor under the direction of the project engineer.
Moore & Bruggink, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
26-33-1
Solicitation # 26-33-1
St. Tammany Parish Government is soliciting quotes for the Wildwood Farms Subdivision Drainage project in Pearl River, Louisiana. The scope of work requires a contractor to provide all labor, equipment, and materials to improve drainage by removing and replacing drain pipes, catch basins, and driveway pipes along Max Mercer Rd (R06I026) and Cecil Fleming Rd (R06I009). The project must be completed within 45 calendar days from the issuance of the Notice to Proceed. Key deliverables include approved shop drawings and final record drawings of all changes, including underground utilities. The contract will be awarded to the lowest responsive monetary quote from a contractor holding a Highway, Street, and Bridge Construction classification. For projects estimated at 50,000 dollars or more, contractors must be licensed under Chapter 24 of the Louisiana Revised Statutes, Title 37. Bids must be submitted by November 12, 2026, via certified mail, hand-delivery, or courier. Payment is structured through monthly certificates for partial payment at 90 percent of work performed and materials stored, with the final 10 percent released 45 days after filing acceptance and securing a Clear Liens and Privilege Certificate. Contractors must comply with various federal and state regulations, including the Clean Air Act, Clean Water Act, and several non-discrimination and equal opportunity statutes. Safety requirements mandate the use of fences, railings, and lighting around excavations to protect the public. The project is governed by the Manual on Uniform Traffic Control Devices and LADOTD Standard Specifications for Roads and Bridges. Required submission documents include a revised unit price form, corporate resolution of authority, and a W-9 for new vendors.
St. Tammany Parish Government

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Washington → Seattle Public Schools

Same awarding agency

NAICS: 541310
New
SLED
AE for Lowell ES Modernization and Addition
Solicitation # RFQ261001
Seattle Public Schools is seeking professional architectural and engineering (A/E) services for the Lowell Elementary School Addition and Modernization Project, which has a Maximum Allowable Construction Cost of $80,000,000. The scope of work encompasses the pre-design phase, schematic design, design development, construction documents, construction administration, and warranty phases. Key technical requirements include the full replacement of HVAC, plumbing, and fire sprinkler systems, the replacement of approximately 80% of sidewalk and curb infrastructure, and the integration of new construction to meet educational specifications for 5420 students. The project emphasizes sustainability, requiring adherence to the Washington State Sustainable Schools Protocol, an Energy Use Index of 15 or less, and a specific infiltration/exfiltration rate of 15 cfm or less. Additionally, the design must incorporate hybrid steel and cross laminated timber structures and comprehensive electronic safety and security systems. The selection process is based on a best overall value evaluation across five categories: firm qualifications and team composition (30 points), project understanding and technical approach (25 points), project management and past performance (25 points), an inclusion plan for small and minority-owned businesses (10 points), and local permitting expertise (10 points). The project will be procured using the GC/CM process under RCW 39.10, and all work must comply with ADA standards and various federal and state non-discrimination laws. Proposers must submit a Statement of Qualifications via Bid Locker, including a company profile and a list of up to five comparable school projects completed within the last eight years. Contract administration is managed by the Project Manager in Seattle, with specific invoicing and communication protocols outlined in the AE Form 2 and Form 1 documents.
Architectural Services

POSTED

1 day ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement