Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Repair and Structural Reinforcement

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. The project requires comprehensive drainage, underdrain, inlet, pipe, and downspout work, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements include the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation specifically encourages participation from small business concerns, including minority, woman-owned, disadvantaged, HUBZone, and veteran-owned businesses, who may also form consortiums to handle larger bid items. Bids are due by 4:00 P.M. on September 17, 2026. Interested parties must submit a response indicating their intent to bid to the primary contact, Jonah Leith. The project falls under NAICS code 237110, focusing on professional civil engineering construction.
Harbel, Inc.

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract entails the removal of existing concrete, repair of cracks, and structural reinforcement of the service gate well recess, with specific emphasis on work performed in wet environmental conditions. This includes the installation of formwork, placement of rebar, and pouring of high-strength concrete to ensure durability and load-bearing integrity in a demanding operational setting. All work must be executed to precise engineering standards to withstand moisture exposure and maintain structural stability over time. The solicitation is classified as a subcontract under NAICS code 237110, which corresponds to water and wastewater line and distribution system construction, indicating the infrastructure nature of the project. It is associated with the Department of Defense and managed by W072 Endist Huntington, with performance required at a location specified by zip code 44608. The opportunity was posted on May 1, 2026, and responses are due by 4:05 PM on the same day, suggesting a tightly managed procurement timeline. There is no set-aside designation or additional organizational type specified, implying the subcontract is open to qualified bidders without restrictions.

General Info

Remove concrete, repair cracks, reinforce gate well with high-strength concrete in wet conditions at 44608.

Agency

Department Of Defense → W072 Endist HuntingtonView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

WV, 44608

Set-Aside

NONE

Documents

This scope was carved out of W9123726RA006.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

W91237-26-R-A006 Service Gate Well Recess Repair at Beach City Dam in Beach City, Ohio

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W072 Endist Huntington
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform concrete removal, crack repair, and structural reinforcement of the service gate well recess, including formwork, rebar, and high-strength concrete placement in wet environments.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 236220
New
Federal
Tom Jenkins Office/Shelter roof replacement
Solicitation # W9123726QA090
Solicitation W9123726QA090 is a total small business set-aside for the removal and replacement of roofing systems at the Tom Jenkins Dam in Glouster, Ohio. The scope of work requires the installation of a new fully adhered white EPDM membrane roof for the office and a new architectural asphalt shingle roof with synthetic underlayment for the shelter. All work must be completed within 60 calendar days from the Notice to Proceed, with a performance period scheduled from September 21, 2026, to November 21, 2026. The project requires a minimum 20-year warranty on both roofs and strict adherence to EM 385-1-1 safety standards and Davis-Bacon wage determinations for Muskingum County. The contract is a firm-fixed-price arrangement with an estimated value between 100,000 and 250,000 dollars. Award will be granted to the lowest price offeror who meets all technical requirements and is deemed responsible. Key administrative updates via Amendment 0004 have removed the requirement for performance and payment bonds and modified applicable FAR clauses. All proposals must be submitted electronically through the PIEE Solicitation Module by September 15, 2026. The contractor is responsible for providing a site-specific Abbreviated Accident Prevention Plan and maintaining a quality control system to ensure all materials are new and installations are leak-free.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 332312
New
Federal
Miter Gate Rack Arm Fabrication for Captain Anthony Meldahl Lock and Dam
Solicitation # W9123726QA084
Solicitation W91237-26-Q-A084 is a request for a firm-fixed price supply contract issued by the U.S. Army Corps of Engineers, Huntington District, for the fabrication and delivery of one rack arm assembly for the Captain Anthony Meldahl Lock and Dam in Felicity, Ohio. The scope of work includes the fabrication of one rack, one rack support, and all associated appurtenances according to contract drawing 22/5. This is a supply-only procurement, meaning the contractor is responsible for fabrication, assembly, and testing, while the government will handle the final installation. The award will be based on the lowest price among offers that meet all technical requirements, and the project is designated as a total small business set-aside under NAICS code 332312. Key requirements include the submission of detailed shop drawings for approval and the implementation of a quality control system. Final shop assemblies must be witnessed by a government inspector, and the contractor must provide 14 days' notice prior to final testing. The delivery is required within 180 calendar days from the date of award, with terms set as FOB Destination. Packaging must adhere to strict standards for long-term storage, including the use of rust preventatives, weathertight wooden crates, and marking in accordance with MIL-STD-130 and MIL-STD-129. All responses must be submitted electronically via the PIEE Solicitation Module in a searchable PDF format.
Fabricated Structural Metal Manufacturing

POSTED

3 days ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Federal
Bolivar Dam Gatehouse Roof Replacement
Solicitation # W9123726QA073
Solicitation W9123726QA073 is a sealed bid invitation for a total small business set-aside construction project to replace the roof membrane of the Intake Structure Building at Bolivar Dam in Bolivar, Ohio. The contractor is responsible for providing all personnel, equipment, transportation, and materials required to remove and dispose of the existing membrane, gravel, and reglet flashing, and install a new 3,060 square foot roofing system. Specifications require the use of Johns Manville 060 PVC single-ply white membrane or an equivalent, along with two layers of 2.6 inch polyisocyanurate insulation board. The project must be completed within 60 calendar days from the issuance of the Notice to Proceed, which is contingent upon the approval of bonding, insurance, security clearances, and an Accident Prevention Plan. The contract is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates and federal mandates for paid sick leave and minimum hourly wages. Safety compliance is mandatory according to OSHA 29 CFR 1910 and 1926, as well as the U.S. Army Corps of Engineers EM 385-1-1 manual. Administrative requirements include active registration in the System for Award Management and compliance with Buy American and cybersecurity standards, including CMMC level requirements. Proposals must be submitted through the PIEE Electronic Quote Submissions portal by the deadline of September 14, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS