This Solicitation opportunity from Virginia was posted on August 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first5 pages · amendment
HighAI Summary for IFB # 25-SCPS-002 Addendum #1 - Construct Stafford ES #19: Issued August 8, 2024, this addendum modifies IFB # 25-SCPS-002 for the construction of Stafford ES #19. Key changes include the release of CAD files (subject to a waiver), coordination of site visits, and critical technical clarifications replacing VCT with LVT on drawings and finish schedules. It also adds a Site Phasing Plan (Sheet A100) and specifies that the award will be based on the lowest responsive and responsible bidder for the Total Base Bid.
PDF
PDF, High priority: read this first20 pages · amendment
HighAI Summary for IFB # 25-SCPS-002 Addendum #2 - Construct Stafford ES #19: Addendum #2 issued August 16, 2024, for the construction of Stafford ES #19. Key updates include extending the bid due date to August 29, 2024, providing clarifications on bond requirements, site conditions, and technical specifications, answering 12 bidder questions, and detailing revisions to architectural and structural drawings and specifications.
PDF
PDF, High priority: read this first76 pages · amendment
HighAI Summary for IFB 25-SCPS-002 Addendum #3 - Construct Stafford ES #19: Issued August 21, 2024, Addendum #3 for IFB #25-SCPS-002 regarding the construction of Stafford ES #19. The document provides critical clarifications and answers to 20 bidder questions concerning surety costs, permit responsibilities, equipment specifications (basketball backstops, roofing, foodservice), utility fees, and supplier diversity certification requirements.
PDF
PDF, High priority: read this first114 pages · amendment
HighAI Summary for IFB # 25-SCPS-002 Addendum #4 - Construct Stafford ES #19: Addendum #4 issued August 23, 2024, for the construction of Stafford ES #19. Key updates include extending the bid due date to September 5, 2024, at 2:00 p.m. The document provides a detailed list of approved and denied material substitutions, technical clarifications regarding water/sewer fees and specifications, and responses to 15 bidder questions concerning electrical generators, transfer switches, plumbing fixtures, and architectural details.
PDF
PDF, High priority: read this first7 pages · amendment
HighAI Summary for IFB #25-SCPS-002 Addendum #5 - Construct Stafford ES #19: Issued August 27, 2024, by Stafford County Public Schools, this addendum modifies IFB #25-SCPS-002 for the construction of Stafford ES #19. It provides clarifications on product substitutions (grease ducts, windows, and flooring), answers bidder questions regarding site access and fire-rated windows, updates several drawing details (railings, bollards, and waterline sizing), and amends specifications for fire-rated window assemblies.
PDF
PDF, High priority: read this first9 pages · amendment
HighAI Summary for IFB #25-SCPS-002 Addendum #6 - Construct Stafford ES #19: Issued August 29, 2024, Addendum #6 for IFB #25-SCPS-002 regarding the construction of Stafford Elementary School #19. The document provides electrical clarifications for tennis court lighting and updates several technical drawings, including site lighting (E4.02, E4.03), air handler airflows (M0.01), fan mark numbers (M5.04), grease interceptors (P0.01, P1.11C), storm drainage (Sheet 25), and asphalt trail width. A signed acknowledgment is required for bid submission.
PDF
PDF, High priority: read this first786 pages · specifications
HighAI Summary for IFB 25-SCPS-002: Construct the Elementary School #19 Project - Specifications: Technical specifications and table of contents for the construction of Elementary School #19 for Stafford County Public Schools (IFB# 25-SCPS-002), dated July 23, 2024. The document outlines comprehensive project requirements across multiple divisions, including procurement, general requirements, concrete, metals, electrical, plumbing, and HVAC systems.
PDF
PDF, High priority: read this first134 pages · ifb
HighAI Summary for IFB# 25-SCPS-002: Construct the Stafford ES #19 Project: Invitation for Bid (IFB) issued by Stafford County Public Schools on July 23, 2024, for the construction of the Stafford Elementary School #19 project. Bids are due by August 23, 2024, at 2:00 p.m. The document outlines submission requirements, an optional pre-bid conference on August 6, 2024, and bidder qualifications, including the requirement for a Virginia Class A Contractor's license and specific experience in constructing K-12 schools.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for IFB 25-SCPS-002 Exhibit A - Construction the Stafford ES (Project Volume 1 of 5): This document is part of the project volume for the construction of Stafford ES under IFB 25-SCPS-002. It contains technical engineering plans and profiles, specifically detailing the private domestic line and fire line to the concession stand waterline, as well as existing waterline plans. The documents were produced by Legacy Engineering with dates ranging from December 2023 to May 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for IFB 25-SCPS-002 Exhibit A - Construction the Stafford ES Project Volume 2: This document is a technical exhibit (Volume 2 of 5) for the construction of Stafford ES under solicitation IFB 25-SCPS-002. It contains detailed landscaping notes, plant schedules for interior parking lots, and references to VDOT and Va. DSWC standards, dated December 22, 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for IFB 25-SCPS-002 Exhibit A - Stafford Elementary School #19: This document is part of the Exhibit A Bid Set for the construction of Stafford Elementary School #19 (Project/PF # 25-05F-002). It contains technical construction drawings and specifications, including food service electrical rough-in plans, masonry wall schedules, 2nd floor framing plans, and roof framing plans dated July 23, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for IFB 25-SCPS-002 Exhibit A - Stafford Elementary School #19 Project: This document is Exhibit A (Bid Set) for the construction of Stafford Elementary School #19, located at Bo Black Hawk Drive, Stafford, VA. It contains technical architectural details, including plan key notes for equipment (water coolers, AED cabinets, fire extinguishers) and fire barrier/wall construction legends.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for IFB 25-SCPS-002 Exhibit A - Stafford ES #19 Project Volume 3: Technical specifications and development plans for the construction of Stafford Elementary School #19 in Stafford County, VA. The document includes detailed notes for pavement marking and signing in accordance with MUTCD and VDOT standards, as well as generalized development plans and elevation views.
PDF
PDF, High priority: read this first954 pages · specifications
HighAI Summary for IFB 25-SCPS-002 Exhibit B - Elementary School #19 Specifications: Technical specifications and table of contents for the construction of Elementary School #19 for Stafford County Public Schools (IFB# 25-SCPS-002). Dated July 23, 2024, the document outlines comprehensive project requirements across multiple divisions, including procurement, general requirements, concrete, metals, electrical, HVAC, and plumbing.
PDF
PDF, High priority: read this first13 pages · specifications
HighAI Summary for IFB 25-SCPS-002 Exhibit C - Construction of the Stafford ES: This document is Exhibit C for solicitation IFB 25-SCPS-002, regarding the construction of the Stafford Elementary School. The provided content consists primarily of technical references and source citations, including Maryland Standards and Va. DIVMC, indicating it contains technical specifications for the project.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
2 updates
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Aug 23, 2024 to Aug 29, 2024.
Deadline changed
Response deadline changed from Aug 29, 2024 to Sep 5, 2024.
Response Deadline
Deadline has passed
Submission Closed