Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Corte Madera Ridge Fuel Break and Forest Health Project

Forecast
21-2026-020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Marin County Open Space District
Contacts1 person available
OfficeN/A

Full Description

Show more
The Marin County Open Space District (MCOSD) is proposing to implement a fire fuel reduction project within Blithedale Summit Open Space Preserve, the purpose of which is to maintain and improve an historic fuelbreak area to control rampant invasive broom growth and prevent the succession of oak woodlands into high-density conifer forest. Funding is through the Measure A Wildfire Fuel Reduction funds. The proposed project area is the vicinity of an existing fire road following a spur ridge between Larkspur and Mill Valley within Blithedale Summit Open Space Preserve, which is owned and maintained by the MCOSD. The fire road is used as an emergency access road and recreation trail, and is maintained as a fuelbreak. Most of the project area is Coast Live Oak Woodland and Forest, with a mix of Madrone Forest, Shrubland, California Bay Woodland, and Redwood Forest comprising the rest of the project area. The project area is mapped within the very high fire hazard severity zone and a Wildland Urban Interface area. The project area would have an average width of 200 feet and would be approximately one mile in length, totally approximately 18 acres. The proposed project includes the following elements throughout the project area: • Remove dead plant material • Remove broom andother non-native invasive vegetation with no restriction on diameter • Remove young conifers including Monterey pine and Douglas fir up to a maximum of 9-inches diameter measured at breast-heithg (dbh) • Potential pile burning • Potential broadcast of chipped plant material • Potential herbicide treatment Project implementation is expected to begin in Spring 2026 continuing through the end of 2029 confirm 3-year project. Equipment would include manual tools, including power tools, such as weed wrenches, chainsaws, weed whips, a wood chipper, and a masticator. All tools, equipment, and clothing would be clean and free of dirt and vegetative material and treated with a 10 percent bleach solution after working to reduce the spread of sudden oak death. Equipment would access primarily from Summit Drive, with Glen Drive and Crown Road as secondary access points. Staging would be along Corte Madera Ridge Fire Road. Follow-up treatments would include hand-pulling in certain sections and may include chemical herbicide treatments. Should chemical treatments be applied as part of follow-up treatment, herbicide application would be implemented according to all applicable regulations and only under the recommendation of a certified Pest Control Advisor and according to CA Department of Pesticide Regulations including: no application within 24 hours of a known rain event, all applicators would be supervised directly or individually hold a Qualified Applicators Certificate or license, a “Notice of Herbicide Application” and accompanying map would be posted four days in advance of the application at all main entry points and would remain posted on-site for four days following application. There are no surface waters or records of special status plant or wildlife in the project area, though northern spotted owl nesting does occur in the vicinity of the project area. Nesting bird surveys would be completed March through July. All mechanical work would be conducted outside of nesting season, between February and July, to avoid noise disturbance to nesting birds. Work buffers would be implemented around nests for dusky-footed woodrats identified in pre-project implementation surveys. Targeted vegetation removal would be non-native species forming understory brush, and no native trees larger than 8-inches breast-high diameter would be removed.

Similar Contracts

Same NAICS industry code

More opportunities from California → Marin County Open Space District

Same awarding agency

NAICS: 237990
SLED
Buck Gulch Falls Creek Restoration and Trail Improvement ProjectThe Buck Gulch Falls Creek Restoration and Trail Improvement Project aims to restore Arroyo de San Jose Creek and its connected ephemeral streams while enhancing safe, sustainable, and inclusive trail access for all users along Spyglass Trail and Buck Gulch Falls Trail to Buck Gulch waterfall within the Ignacio Valley Open Space Preserve. Key improvements include installing two bridges to redirect visitor traffic away from the creek, adding a puncheon and boardwalk across unnamed streams, upgrading nearly 2,240 feet of existing trail, and realigning 850 feet of trail to move it away from eroding streambanks. The Buck Gulch Falls Trail will transition from hiker/equestrian use to hiker-only, and four fill slope walls will be constructed near the waterfall viewing area to stabilize the trail. Additional enhancements involve installing new fencing and signage, decommissioning and restoring 850 feet of degraded trail, and rehabilitating nearly 19,500 square feet of eroding streambank and riparian habitat. These efforts are designed to reduce environmental degradation, protect water quality, and preserve habitats for listed aquatic species by minimizing sedimentation and erosion. The project will employ erosion control measures such as straw wattles at trail transitions, aggregate base rock surfacing at bridge approaches, and seed and mulch applications on disturbed soils to support revegetation. All work aligns with the Regional Trail Management Plan policies, best management practices, Marin County Open Space District trail design standards, and its Inclusive Access Plan to ensure accessibility and sustainability. The initiative is led by the Marin County Open Space District with primary coordination handled by Senior Natural Resources Planner Jason Hoorn and Principal Environmental Planner Carrie Lukacic. The project was posted in June 2026 and is located in Novato, California, with the goal of creating a resilient, low-impact trail system that balances public access with ecological preservation in a sensitive riparian environment.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Cascade Canyon Trail Bridge Project
Solicitation # MCP 2026-07
The Cascade Canyon Trail Bridge Project, solicitation number MCP 2026-07, is a construction contract issued by the Marin County Open Space District for improvements within the Cascade Canyon Open Space Preserve in Fairfax, California. The project focuses on enhancing trail access, improving visitor safety, and reducing environmental erosion through the installation of two prefabricated weathered steel connector style truss recreational bridges with redwood decks. Bridge 1 will be 90 feet long and Bridge 2 will be 60 feet long, both with a width of 6 feet. The scope of work includes constructing concrete spread footings, installing engineered fill for bridge approaches, repairing rock riprap slope protection, and installing compacted road and trail surfaces. Additionally, the contractor will realign existing trails, decommission the High Water Trail and a Canyon Trail spur, and install split rail fencing and signage. The contract will be awarded to the lowest responsible and responsive bidder based on the Total Base Bid. Qualified bidders must hold a valid Class A License and demonstrate significant experience, including the successful completion of at least five similar projects in the San Francisco Bay Area and the submission of three similar or larger bridge project references. The project is divided into two phases: preconstruction activities must begin within 15 calendar days of the first Notice to Proceed, while on-site construction is scheduled to begin no earlier than August 1, 2027, with a duration of 48 working days. Key compliance requirements include adherence to 2025 Caltrans Standard Specifications, California Labor Code Section 6705 for excavation shoring, and the payment of prevailing wages as determined by the California Department of Industrial Relations. Bidders must provide a bid bond for 10% of the total bid amount, and the successful awardee must provide performance and payment bonds equal to 100% of the contract. Required certifications include Equal Employment Opportunity and Subcontractor Debarment and Suspension certifications. Bids must be submitted electronically by December 3, 2026.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS