Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CRG PACE Heater Sources Sought

Closed
F3A1AM01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 621st Contingency Response Wing requires a robust, light, and lean heating solution to operate effectively in arctic and sub-arctic environments where ambient temperatures fall below -10°F, a condition that current Environmental Control Units cannot reliably support. The UTS HH75 Heater is identified as the critical asset to close this capability gap, offering a 75,000 BTU/hr heat output with the ability to run on multiple fuels including DF1, DF2, JP5, JP8, and Kerosene—allowing operational continuity down to -50°F when Kerosene is used. Unlike the existing ECU that draws significant generator power and struggles in extreme cold, the HH75 Heater operates on minimal electrical draw of just 3 amps while relying on its 11.6-gallon fuel tank, consuming only 0.53 gallons per hour and providing up to 22 hours of continuous heating per full tank. This efficiency drastically reduces logistical burden and fuel consumption, enabling sustained field operations without overburdening power systems. The procurement of 14 UTS HH75 Heaters is intended for global deployment across training, exercises, and contingency operations, with delivery and standard manufacturer warranty coverage provided by the vendor. Maintenance, accountability, and day-to-day operations post-warranty fall under the responsibility of the CRG AGE/Electrical Power Production Work Center. The equipment must meet strict specifications including dimensions of 44.0” L x 16.4” W x 25.0” H, 120VAC power requirement, and must include essential accessories such as an exhaust stack, two heater ducts, a remote thermostat, and a full operations and maintenance manual. The solicitation, issued by the Department of the Air Force under contract number F3A1AM01, is structured as a total small business set-aside with a response deadline of June 15, 2026, and a primary point of contact at Cape May, New Jersey.

General Info

Procurement of 14 multi-fuel UTS HH75 heaters for CRG arctic deployment; fuel-efficient, warranty provided.

Agency

Department Of Defense → Department Of The Air ForceView Agency

NAICS

23822

Place of Performance

CAPE MAY CH, NJ, 08641, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Department Of The Air Force
Contacts1 person available
OfficeN/A
Organization / Agency
Department Of Defense → Department Of The Air Force
View Agency Profile
Office AddressN/A

Full Description

Show more

1. General:



The CRG requires rapid deployment capabilities across the globe with equipment suitable for sustainment of operations. Current assets do not meet arctic and sub-arctic requirements for reliant heating for personnel and equipment in the field. UTS is the sole provider for a heating solution feasible for a light and lean approach. Through procurement of 14 UTS HH75 Heaters, it will satisfy the gap we face for locations reaching below -10°F and reinforce our global prowess.  



2.  Objectives:



The 621 CRG needs a capability that enables its force elements to operate in any AOR, including arctic and sub-arctic conditions while remaining light, lean, and agile; the UTS HH75 Heater is essential to this capability since it outperforms the current heating capability of the Environmental Control Unit (ECU). The UTS 5-ton Environmental Control Unit (ECU) meets most theater requirements for operating limitations. The main limitation is ambient operating temperatures of -25 to 125°F. To meet arctic and sub-arctic conditions the need for the UTS HH75 Heater is paramount. The Heater is multi-fueled (DF1, DF2, JP5, JP8, Kerosene). Ambient operating temperature is based off the fuel utilized. Kerosene used as fuel for the Heater opens the door to temperatures as low as -50°F. In colder environments, the ECU will push at most, 12Kw (40,000 BTU/hr) of heat. The 12Kw also translates to load on the generator which increases fuel consumption dramatically. Dependent on set-up, the generator would utilize about 4 gal an hour due to the ECUs maxing out. The UTS HH75 Heater would pull only 3Amps for the electronic controls and mainly rely on its 11.6gal fuel tank. Under continuous use, it would pull .53 gal per hour. A full tank would sustain heating needs for 22 hours.



3.  Scope of Work:



This equipment will be used for the 621st Contingency Response Wing 621 CRW operations, on base and various locations for deployments, training, and exercises. The vendor will provide and deliver the equipment with standard manufacturer warranty to meet global availability for contingency forces to include arctic and sub-arctic regions. The 621 CRW will be responsible for maintaining the accountability and maintenance of the equipment past the warranty period.



4.  Personnel:



The vendor will provide delivery of this item. The maintenance, accountability, and operations of this equipment will be the responsibility of the CRG AGE/Electrical Power Production Work Center.



5.  Equipment Requirements and peripheral shall meet or exceed the specs of:



Heat Output: 75,000 BTU/H


Dimensions: 44.0” L x 16.4” W x 25.0” H


Tank Capacity: 11.6 Gallons


Fuel Consumption under Continuous Use: 0.53 gallons per hour


Fuel Requirements: DF1, DF2, JP5, JP8, and Kerosene


Power Requirements: 120 VAC, 60 Hz, Single Phase


Power Usage: 3 Amps @120V


Accessories Included: Exhaust Stack, Heater Ducts (2), Remote Thermostat, O&M Manual

More opportunities from Department Of Defense → Department Of The Air Force

Same awarding agency

NAICS: 811310
New
Federal
Notice of Intent to Sole Source 60-ton Crane Repair
Solicitation # FA4626-SoleSource-CraneRepair
The Department of the Air Force, through the 341st Contracting Squadron, intends to award a sole-source contract to MGX Equipment Services, LLC for the complex repair of a 2007 Grove TMS700E 60-ton crane (AF Registration 07D00453) supporting the 819th Red Horse Squadron at Malmstrom Air Force Base. The asset is currently undrivable due to a hydraulic leak requiring major drive-train disassembly and the replacement of a 5-port hydraulic swivel manifold assembly. To certify the crane as fully functional, the scope of work includes replacing the wire rope, o-rings, fill cap with breather, element, lock pin, seal kit, and slip ring assembly, as well as performing structural inspections by authorized Grove technicians. All repairs must adhere to OEM specifications as identified in Technical Order 36-1-191. Because the crane cannot be driven and the government lacks a sufficiently large transport trailer, the asset must be transported to the MGX Equipment Services facility in Billings, Montana. The estimated total cost for the project is 53,565.41, which covers parts, labor, and return transportation. This requirement is being solicited as a sole-source action because MGX Equipment Services is the only known authorized dealer in Montana with the necessary capabilities and infrastructure to perform these specific repairs. Interested parties were requested to submit capability statements or quotations by September 25, 2026, to demonstrate if competition would be advantageous to the government.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 19 hours ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS