(CUST) NBSD-57 INSTALL WALL IN ROOM 158 and REVERSE DOOR SWING in lobby for ADA
Active
FederalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Department Of The Navy → Navfac SouthwestView Agency
NAICS
N/A
Place of Performance
USASet-Aside
NONE
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available
Full Description
Show more
NAVFAC PROJECT MAXIMO LOCATION: NBSD-57 Scope of work interior SCIF wall to separate SCIF from SAP-F space Install separation wall 32 feet long 15 feet high • 1.1 Demolition & Removal (if applicable): o None • 1.2 Site Preparation: o Will need scaffolding, air scrubbers, tenants will still be in area of work. • 1.3 Construction/Repair: power will need to come off of the beams, 3 beams have receptacles that need to be added to the wall. o Wall will need door ADA compliant with card reader and X-10 lock as this is a secure location. Customer would like some sound proofing but not secret secure standard. o Proposed wall location is free of obstructions Ie( lights or pipes) • 1.4 Impacts to the Base o No outages or traffic issues NAVFAC PROJECT MAXIMO LOCATION: NBSD-57 Scope of reverse door swing direction to(LEFT HAND INSIDE TO A RIGHT HAND OUTSIDE ) comply with ADA and install X-10 and card reader • 1.1 Demolition & Removal (if applicable): o Small amount of demo to reverse swing direction and install alarm from one side to the other • 1.2 Site Preparation: o • 1.3 Construction/Repair: o will need the door ADA compliant with card reader, X-10 lock and alarm system installed on the inside of the door connecting to 1st floor stairs in lobby area. • 1.4 Impacts to the Base o This should list the possible outages, traffic obstructions, impacts to anything that would affect construction. o No outages or traffic issues SAR: NO L/A test: negitive AC waiver: N/A Funding Type: customer
More opportunities from Department Of The Navy → Navfac Southwest
Same awarding agency
