This project involves the repair and rehabilitation of deteriorated potable water mains, valves, and hydrants at Naval Base Ventura County, specifically at Point Mugu and Laguna Peak. The scope of work requires replacing approximately 60,165 lineal feet of old cast iron and steel piping, ranging from 4 to 18 inches in size, with new corrosion-resistant non-metallic materials. This infrastructure upgrade is critical to preventing interrupted water delivery and ensuring reliable fire suppression capabilities for essential mission operations. The necessity for these repairs is driven by high failure rates, tuberculation, and poor water circulation, which led to a notice of violation in April 2020 regarding elevated disinfectant byproducts. Current mitigation efforts, including increased monthly flushing of 2.6 million gallons, are insufficient to address the underlying deterioration. Managed by Navfac Southwest for the Department of the Navy under NAICS code 237110, this project is a priority effort to close CAPGAP No. 281.

General Info

Repair and replace 60,165 feet of potable water mains at Naval Base Ventura County.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

SW: PDCNAV, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Southwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
09/12/2023 08:02:40 (PST) : Project repairs by replacement and rehabilitates the deteriorated water mains and associated valves and hydrants with new corrosion resistant water mains, fire hydrants and system valves at Naval Base Ventura County, Point Mugu and Laguna Peak. Repair high failure rate areas approximately 60,165 lineal feet of old, deteriorated cast iron and steel piping and associated fire hydrants and valves with new non-metallic piping. The distribution piping ranges from 4-inch to 18-inch in size. If this project is not provided, the intermittent interrupted delivery of adequate water supply and fire suppression water supporting critical mission will continue. In August 2020, increased monthly flushing to 2.6M gal/month to maintain water quality per State requirements. Water distribution system will increase disruption due respectively to tuberculation and deteriorated piping. NOV received April 2020 for elevated disinfectant byproduct due to poor water circulation. This project contributes to closing CAPGAP No. 281 with IR = 10 color RED.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves constructing 16,435 linear feet of new 20-inch ductile iron force main and performing extensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional site requirements include the installation of stormwater facilities, fencing, a yard hydrant, and comprehensive grading and shaping. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE participation goals, which include EPA goals of 10.9 percent for MBE and 10.4 percent for WBE. Bidders must provide a performance bond and payment bond equal to the contract price, and insurance providers must maintain an A.M. Best rating of A-VII or better. Project administration is managed by Willis Engineers, and payments are processed via Applications for Payment, becoming due 30 days after presentation to the owner. All work must adhere to ANSI/AWWA and ASTM standards, with final acceptance contingent upon absolute compliance with the contract documents.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as the installation of site electrical, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bidders must adhere to strict compliance standards, including the Davis-Bacon Act, American Iron and Steel requirements, and EEO regulations. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract amount and ensure all work meets VDOT 2020 Road and Bridge Specifications and City of Winchester Standards. Bids must be submitted electronically via the City's e-Procurement Portal by 2:00 pm on November 12, 2026.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in about 14 hours
View Details

More opportunities from Department Of The Navy → Navfac Southwest

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS