Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Draft Policy Update to the NIH Policy for Data and Safety Monitoring

Active
NOT-OD-27-006Grant

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The National Institutes of Health is proposing to update its 1998 Policy for Data and Safety Monitoring to expand its scope from clinical trials to all NIH-supported clinical research. This update introduces a risk-based approach to data and safety monitoring, requiring a monitoring plan tailored to the specific risks of each study to ensure participant safety and data integrity while reducing administrative burdens for lower-risk research. Key changes include removing the mandatory requirement for Data and Safety Monitoring Boards for all phase 3 or multi-site clinical trials, instead allowing for flexible, proportionate oversight approved by NIH Institutes, Centers, and Offices. Under the proposed policy, recipients and investigators must conduct risk assessments and implement approved monitoring plans prior to starting human subject activities. The policy defines roles for investigators, sponsors, and independent monitors, and establishes compliance mechanisms that may include funding termination for non-compliance. NIH is currently seeking public feedback on the draft policy and potential supplemental resources, such as templates and guidance tools, with comments accepted until January 6, 2027.

General Info

NIH updates data safety monitoring to a risk-based approach for all clinical research.

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNational Institutes Of Health
Contacts1 person available
OfficeUSA
Organization / AgencyNational Institutes Of Health
Office AddressUSA

Full Description

Show more
Background NIH is proposing to update its 1998 Policy for Data and Safety Monitoring. The 1998 Policy established NIH requirements for data and safety monitoring in clinical trials (as defined in Section V), including the requirement to develop and implement a data and safety monitoring plan. The draft update would expand those expectations to all NIH-supported clinical research (as defined in Section V), while using risk-based data and safety monitoring approaches to focus oversight where it is most needed, and reduce administrative burden for research with lower risk. NIH is proposing this update because clinical research and study designs have advanced significantly since 1998. Valid scientific results are necessary to replicate and extend research findings and translate findings from clinical trials and other clinical research to health improvements. In addition, almost two thirds of NIH's clinical research portfolio is not clinical trials, and data from clinical research that are not clinical trials often support future clinical trial research. Updating the policy would promote a consistent NIH-wide approach to participant safety and the quality and integrity of data, better reflecting NIH's broad and diverse clinical research portfolio. Key features of the draft updated policy include expanding the scope of the 1998 Policy from clinical trials to encompass all NIH-supported clinical research, clarifying the requirements that data and safety monitoring plans be based on the risk of the study and that NIH Institutes, Centers, and Offices (ICOs) approve those plans. By focusing on study-specific, risk-based monitoring, the draft updated policy would allow greater flexibility in monitoring approaches by removing the requirement for Data and Safety Monitoring Boards for all phase 3 or multi-site clinical trials. Request for Information NIH is seeking public input on proposed updates to the 1998 NIH Policy for Data and Safety Monitoring and on what supplemental resources would benefit the research community. Specifically, NIH is seeking feedback on considerations surrounding: Whether the draft updated policy improves risk-based oversight of (1) the quality and integrity of data and (2) participant safety and well-being (i.e., data and safety); Specific areas in the draft updated policy that may inform policy changes/development and/or supplemental resources or tools for implementation Supplemental resources, tools, and monitoring plan guidance (e.g., required elements, page limit guidance) that may better support the research community in implementing the draft updated policy to enhance data quality and participant safety while minimizing unnecessary burden (e.g., NIH risk-based data and safety monitoring assessment or implementation framework or model data and safety monitoring plan guidance). How to Submit a Response Comments should be submitted electronically to the following webpage: https://osp.od.nih.gov/comment-form-draft-policy-update-to-the-nih-policy-for-data-and-safety-monitoring/. Comments will be accepted until January 6, 2027. Comments are voluntary and may be submitted anonymously. You may also voluntarily include your name and contact information with your response. Other than your name and contact information, please do not include in the response any personally identifiable information or any information that you do not wish to make public. Proprietary, classified, confidential, or sensitive information should not be included in your response. After the NIH Office of Science Policy (OSP) has finished reviewing the responses, the responses may be posted to the OSP website without redaction. Draft Policy Update to the NIH Policy for Data and Safety Monitoring I. Purpose The purpose of the updated National Institutes of Health (NIH) Policy for Data and Safety Monitoring (DSM Policy) is to establish risk-based data and safety monitoring (i.e., monitoring) in all NIH-supported clinical research. This Policy establishes the requirement to develop and implement a NIH Institutes, Centers, and Offices (ICO)-approved data and safety monitoring plan (i.e., monitoring plan) and Policy compliance expectations. Data and safety monitoring provides risk-based oversight of (1) the quality and integrity of data and (2) participant safety and well-being (i.e., data and safety) to ensure the study is conducted ethically and progress is consistent with producing valid scientific results that accomplish the NIH-approved scope of work. Requirements of this policy are calibrated to ensure that oversight roles are non-duplicative with that of Institutional Review Boards (IRBs). II. Background As stewards of the world's largest public investment in biomedical research, NIH is entrusted to ensure the rigor, safety, and transparency of its clinical research. NIH endeavors to ensure that studies are conducted safely, ethically, and in accordance with approved study documents. In support of this goal, NIH issued the NIH Policy for Data and Safety Monitoring in 1998 (1998 Policy) to ensure clinical trials had monitoring procedures for data and safety. NIH provided Further Guidance on Data and Safety Monitoring for Phase I and Phase II Trials in 2000 (2000 Guidance). NIH continued these efforts in 2016 to strengthen clinical trial stewardship, accountability, and transparency. Significant research advancements toward increasingly data-driven, patient-centered research (e.g., real-world data research, implementation science, machine learning, genomics, point-of-care clinical studies) and more efficient, adaptive, and fit for purpose study designs (e.g., decentralized, adaptive, quasi-experimental designs) have highlighted the need to continue to modernize NIH data and safety monitoring practices for all clinical research to support the ethical conduct of research and produce valid scientific data. In-line with gold standard science at NIH, valid results are necessary to replicate and translate research findings to accelerate scientific discovery and improve American health. Almost two thirds of NIH's clinical research portfolio consist of studies that are not clinical trials. Research advancements in these areas necessitate that NIH require data and safety monitoring in all clinical research to ensure that these studies meet NIH's standards for valid scientific data and ethical study conduct. Data from clinical research studies that are not clinical trials often support future clinical trial research, underscoring the need to ensure high-quality data in all research stages. This draft updated DSM policy is distinct from, but complements, the data management and sharing practices to enable data accessibility, reuse, reproducibility and reliability of study results outlined in NIH's Data Management and Sharing Policy. NIH maintains that data monitoring and management practices supports improved data validity and study outcomes, including future reproducibility, replication, and sharing for the next generation of research. NIH's draft updated Data and Safety Monitoring policy ensures the clinical research data shared in accordance with the Data Management and Sharing Policy are monitored for participant safety and are of the highest quality, building trust in the research and its disseminated results. Accordingly, NIH proposes an updated DSM Policy that expands the goals of the 1998 Policy to require all clinical research to have plans to monitor data and safety using approaches proportionate to study risk. Risk-based monitoring approaches allow for more effective mitigation of risks to participants and to the quality and integrity of the data while allowing for tiering of oversight to reduce administrative burden. Risk-based monitoring focuses on risks that are most likely to critically affect data and safety, and, in turn, enhances ethical study conduct and the validity of scientific results. The extent and nature of risk-based monitoring is proportionate to those risks. This approach also directly supports dynamic, continual improvement in study oversight, monitoring, and conduct to ensure that studies accomplish the NIH-approved scope of work. Risk-based monitoring supports rigor, transparency, and accountability, builds public trust in NIH research, and advances the NIH mission of funding studies that advance American health. III. Policy Scope and Effective Date The policy will be effective for applications submitted on or after 6 months from when the final policy is published. This updated DSM policy applies to the following NIH-supported clinical research: All competing award applications, applications for competitive revisions, proposals for contracts, and other funding agreements (e.g., Other Transactions, Cooperative Agreements). All intramural research projects approved by an IRB. IV. Compliance and Enforcement All institutions conducting NIH-supported clinical research defined in Policy Scope and Effective Date, will be required to comply with this Policy, which will be included in the applicable terms and conditions of the award or agreement, or as outlined in the NIH Grants Policy Statement, or Other Transaction agreement. Compliance will be reviewed and evaluated by NIH during regular reporting intervals (e.g., at the time of monitoring reports, during study progress reviews) or more frequently by the awarding NIH ICO. Monitoring plan amendments must be reported to and approved by the awarding NIH ICO. The monitoring plan and its amendments must be consistent with Requirements. Changes that require prior approval, consistent with the NIH Grants Policy Statement 8.1.2 Prior Approval Requirements or the Terms and Conditions of the Notice of Award, and that result in amendments to the monitoring plan, require NIH ICO review of the revised monitoring plan and NIH ICO approval prior to implementation. Changes that don't require prior approval, but result in monitoring plan amendments, require reporting a summary of the monitoring plan amendments during regular reporting intervals. Failure to comply may provide a basis for remedies for noncompliance which could also result in enforcement actions, including, but not limited to, specific award conditions or termination, consistent with applicable grant regulations; applicable NIH policies and procedures, including NIH intramural policies and procedures; the Federal Acquisition Regulations; and/or other authorities, as appropriate. Enforcement actions may affect future funding decisions for the recipient institution, as authorized in the NIH Grants Policy Statement. In cases where NIH proposes to suspend, limit, or terminate financial assistance because of noncompliance with this Policy, applicable HHS and Public Health Service procedures shall govern. NIH IRP research subject to this policy will be addressed, as applicable within NIH IRP policies and procedures. V. Definitions and Terminology For the purposes of the draft updated NIH DSM Policy, terms are defined or explained as follows: Clinical Trial A research study in which one or more human subjects are prospectively assigned to one or more interventions (which may include placebo or other control) to evaluate the effects of those interventions on health-related biomedical or behavioral outcomes Clinical Research Research with human subjects that is: Patient-oriented research. Research conducted with human subjects (or on material of human origin such as tissues, specimens, and cognitive phenomena) for which an investigator (or colleague) directly interacts with human subjects. Excluded from this definition are in vitro studies that utilize human tissues that cannot be linked to a living individual. It includes: (a) mechanisms of human disease, (b), therapeutic interventions, (c) clinical trials, or (d) development of new technologies. Epidemiological and behavioral studies Outcomes research and health services research Data and Safety Monitoring Plan (DSMP) A prospectively written document that describes the strategy, methods, responsibilities, and requirements for monitoring (1) quality and integrity of data and (2) participant safety and well-being. Data and Safety Monitoring (DSM) Reports Documentation of monitoring activities, their results, actions taken in response to monitoring results, and the outcomes of those actions. The DSM report is provided to the individual(s) monitoring the study. Independent Monitor An individual, committee, or board who, based on their roles and responsibilities defined in the monitoring plan, review the monitoring plan, study data, and/or monitoring reports as the study progresses. The independent monitor provides assessments of whether the study's human subject activities should continue or be stopped (i.e., suspension or discontinuation) based on data, safety, and if the study is conducted ethically and progress is consistent with producing valid scientific results that accomplish the NIH-approved scope of work. Independence means that the monitor is not directly involved in the study and real or perceived conflicts of interest are disclosed and adequately mitigated. Monitoring (of the Study) Monitoring is the review of study data as the study progresses to provide appropriate oversight of the processes and procedures necessary for (1) quality and integrity of data and (2) participant safety and well-being (i.e., data and safety). Monitoring includes developing and implementing a monitoring plan, along with the actions taken to identify, evaluate, mitigate, or correct risks. Data and safety are monitored to assess if the study is conducted ethically and progress is consistent with producing valid scientific results that accomplish the NIH-approved scope of work. Monitoring should be risk-based. Risk-based monitoring focuses on identifying and mitigating the risks that are most likely to critically affect data and safety, and, in turn, if the study is conducted ethically and produces valid results. This is determined based on the study's risk assessment (i.e., initial or throughout the study) and ongoing review. The extent and nature of risk-based monitoring is proportionate to those risks. Monitoring is one aspect of quality assurance and control procedures in studies, and is distinct from the routine (i.e., day-to-day) operational activities performed by the study staff for study quality assurance and control. NIH-Supported Research NIH supported research includes all research funded in whole or in part by NIH. This includes research conducted by the NIH intramural research program and funded or conducted by extramural grants, contracts, other transactions, or other funding agreements regardless of NIH funding level or awarding instrument. Program Director/Principal Investigator (hereafter Investigator) The individual(s) designated by the applicant organization to have the appropriate level of authority and responsibility to direct the project or program to be supported by the award. Quality and Integrity of Data Quality and integrity of data include the degree to which the data are generated, recorded, and reported throughout the study are fit for purpose, such that the data fulfill the criteria needed for the study to be ethically conducted and produce valid scientific results. Recipient An entity that receives a Federal award directly from a Federal agency to carry out an activity under a Federal program. The term recipient does not include subrecipients, consortiums or individuals that are participants or beneficiaries of the award. Risk Assessment (of the Study) The risk assessment of the study is used to develop a monitoring approach that is proportionate in extent and nature to the study's risks. The study's risk assessment may be reviewed and amended throughout the study. Critical risks are based on identification and evaluation of the study's risks to determine criticality based on the likelihood risks might occur or their possible impact on data and safety, and, in turn, if the study is ethically conducted and produces valid scientific results accomplishing the NIH-approved scope of work. Critical risks should be monitored, mitigated, and reported. All studies involve some measure of risk. Risks should be interpreted broadly (evidence-based, theoretical, anticipated at the start of the study, or identified during the study), then evaluated to determine if they are critical risks, and may include factors affecting: Participant safety and well-being (including privacy and confidentiality); Quality and integrity of data (including study outcomes); Complexity, processes, and procedures (including study design, operations, systems, large language models (LLMs) or super intelligence (see https://www.whitehouse.gov/presidential-actions/2026/09/inaugurating-the-era-of-super-intelligence/), regulatory, administrative factors); NIH financial stewardship; or Other significant risks (including data security, public trust). Sponsor A sponsor is the person or entity who takes responsibility for and initiates a clinical trial under a Food and Drug Administration Investigational New Drug (IND) application or Investigational Device Exemption (IDE). The sponsor may be an individual, company, governmental agency, academic institution, private organization, or other organization (additional information here and here). Study Documents Study documents include (1) NIH-approved study documents, including, but not limited to, all components of the application, any changes made to application documents or the information described within them after initial submission, the Research Performance Progress Report (RPPR) or other required reporting, or any other NIH document relevant to the study, (2) IRB approved study documents (e.g., protocol), (3) study documents reviewed by other applicable authorities (e.g., FDA), and (4) any other study documents needed to execute approved plans (e.g., statistical analysis plan, manual of operating procedures). Together, these study documents describe the approved scope of work and timelines, as well as the plans or operational procedures required to accomplish them. VI. Roles and Responsibilities Recipient or Investigator Responsibilities The recipient institution is responsible for the conduct of all research under the award, including compliance with this Policy. The recipient institution may designate the investigator(s) as responsible for carrying out these responsibilities under the oversight of the awarding NIH ICO. NIH's review and evaluation of recipient/investigator requirements does not relieve the recipient/investigator of its responsibility to satisfactorily implement requirements. The recipient /investigator is responsible for: Developing and receiving approval for a satisfactory monitoring plan (i.e., consistent with Requirements) from the awarding NIH ICO. The initial monitoring plan must be approved prior to initiating human subject activities. In developing the monitoring plan, recipient(s)/investigator(s) should perform a risk assessment and propose a monitoring approach that is proportionate to the study's risk. Determining and adhering to the IRB review requirements for the monitoring plan. Please see NIH's Policy on Single IRB (sIRB) for information on sIRB requirements If independent monitoring is required by the NIH ICO for the study, (1) identifying possible independent monitors for the study at NIH ICO request and (2) managing real and perceived conflicts of interest to mitigate bias. Implementing and adhering to the monitoring plan once human subject activities begin. Assessing the need for monitoring plan amendments in response to study issues or changes. This may then include amending the monitoring plan to ensure it remains satisfactory, implementing amendments, and, when required by Compliance and Enforcement, obtaining approval from the NIH ICO for amendments. Mitigating or resolving issues identified through monitoring reports and indicated in monitoring reports if and how issues are satisfactorily mitigated or resolved. This includes corrective and preventive action plans that mitigate issues (as defined in Section V: "Monitoring" and "Risk Assessment"). Providing monitoring reports according to monitoring plan requirements and demonstrating if the ongoing review of study data indicates that data and safety are consistent with ethical study conduct and that progress is consistent with producing valid scientific results that accomplish the NIH-approved scope of work. Providing the study documents that enable monitoring or monitoring reports to the parties described in the monitoring plan (e.g., the NIH ICO, independent monitor (if applicable), and regulatory authorities (e.g., IRB, FDA)). Sponsor Responsibilities In cases where there is a regulatory sponsor for studies with an IND or IDE, the sponsor should determine which responsibilities listed under Recipient/Investigator Responsibilities are to be performed by the sponsor or the recipient/investigator. Institutes, Centers, and Offices Responsibilities The awarding NIH ICO is responsible for the oversight of the data and safety monitoring of the NIH-supported clinical research. This is distinct from the monitoring activities performed by the recipient/investigator, sponsor, or independent monitor(s). The awarding NIH ICO is responsible for: Requiring that the recipient/investigator provide a satisfactory monitoring plan (i.e., consistent with Requirements) that is approved by the NIH ICO prior to the initiation of human subject activities. NIH ICO is responsible for reviewing and evaluating the plan to determine if the recipient/investigator has provided a satisfactory plan. The NIH ICO may require changes to the study or monitoring plan or, if applicable, assessment of the plan by an independent monitor prior to NIH ICO approval. Evaluating and approving the study to have independent monitoring. If independent monitoring is required, approving the independent monitor(s) roles, responsibilities, and selection. Establishing review and management processes to ensure disclosure and mitigation of conflicts of interest throughout the study. Reviewing, evaluating, and approving amendments to monitoring plans according to Compliance and Enforcement expectations and to require that the recipient/investigator maintains a satisfactory monitoring plan throughout the study. Reviewing and evaluating monitoring reports on the study's data and safety, including, if applicable, the independent monitor's assessment of these, to determine and approve whether the study should continue or be stopped (i.e., suspension or discontinuation). This includes determining from these reports, (1) if the study is conducted ethically, (2) if study progress is consistent with producing valid scientific results that accomplish the NIH-approved scope of work; (3) if the recipient/investigator has satisfactorily mitigated identified issues; (4) compliance with the monitoring plan requirements, (5) compliance with the updated DSM Policy; and (6) compliance with applicable laws, regulations, and policies. If the NIH ICO identifies concerns when reviewing the monitoring plan (i.e., initial or amendments) or reports relevant to monitoring, the NIH ICO has the authority to require or approve actions including, but not limited to, amendments to the study or monitoring plan; increased monitoring and reporting requirements, corrective and preventive actions; suspension or discontinuation of human subject activities; suspension, withholding, or termination of funding; or special terms of award. The NIH ICO will respond to the recipient/investigator within 30 days after receiving the NIH ICO requested plan. After 30 days, if the NIH ICO has not provided a response, the plan is deemed approved. Independent Monitor Responsibilities Independent monitors assist the PI with monitoring under the oversight of the NIH ICO based on their roles and responsibilities defined in the monitoring plan. The independent monitor is responsible for: The review and assessment of the (1) monitoring plan (i.e., the initial plan and amendments), (2) study documents (e.g., for data and safety monitoring and regulatory considerations), and (3) monitoring reports. This includes assessing if issues identified in monitoring reports have been satisfactorily mitigated. Disclosing conflicts of interest to ensure independence is maintained. Assessing whether the study's human subject activities should continue or be stopped (i.e., suspension or discontinuation). Informing the recipient/investigator, NIH ICO, and any other parties as specified in the monitoring plan (e.g., sponsor, IRB) of their assessments. Protecting the confidentiality of the study data and monitoring reports throughout all monitoring activities. Reporting any new real or perceived conflicts of interest to the NIH ICO for evaluation and review throughout monitoring responsibilities and according to NIH ICO procedures. VII. Requirements Monitoring Approach The monitoring plan must describe a risk-based monitoring approach that is proportionate to the study's risks in extent and nature of monitoring, and provides appropriate oversight of the processes and procedures necessary for (1) quality and integrity of data and (2) participant safety and well-being (i.e., data and safety). The monitoring plan must describe the strategies, methods, responsibilities, and requirements for study monitoring that: Assess data and safety to ensure that the study is conducted ethically and progress is consistent with producing valid scientific results that accomplish the NIH-approved scope of work. Enable the identification and management of anticipated risks or risks that may arise as the study progresses. Execute monitoring that is consistent with approved study documents. Are in accordance with applicable laws, regulations, and policies. Monitoring Plan Elements The monitoring plan must include the following elements and their rationale: Result of the study risk assessment to inform the risk-based monitoring plan, including what critical risks the monitoring approach focuses on and the rationale for their selection. The activities, strategies, and methods needed to monitor the risks, including (1) what data, processes, or procedures are reviewed to monitor the risk, (2) evaluation criteria for the risk, and (3) how the monitoring activities are recorded. How critical risks will be addressed, including the processes to identify them and resolve them. Premature study discontinuation or temporary suspension reasons, including examples of what data are reviewed and evaluated to monitor these. Communication and review of monitoring reports. How monitoring activities are documented. NIH encourages recipients/investigators to develop a single monitoring plan for the NIH, IRB, and any other applicable regulatory agencies (e.g., FDA) that is consistent with Good Clinical Practice (ICH GCP). Monitoring plan and reporting expectations do not duplicate RPPR requirements. Independent Monitoring Depending on the study, the monitoring plan may include an independent monitor. The recipient/investigator always monitors the study. The need for independent monitoring, which is in addition to monitoring by the recipient/investigator, should be based on the study's risk assessment, both initial and as the study progresses. Independent monitoring provides additional expertise to the review provided by the recipient/ investigator, sponsor, or NIH ICO. Monitoring that is independent may reduce bias, increase rigor, shield the study from conflict of interest, and/or undue influence on the study. Depending on the study and the independent monitor's expertise, the monitor may perform all or a subset of monitoring activities described in the plan. The monitoring plan should describe the role, responsibilities, necessary expertise, and independence requirements of the independent monitor, including what aspects of the study's monitoring plan, study data, and/or monitoring reports the monitor is anticipated to review and assess. The ICO must identify in writing a reason why independent monitoring is required. Communication and Review of Monitoring Reports Routine monitoring reports should be reviewed at least annually by individuals who have the necessary expertise to assess the findings, interpret the data, and determine whether follow-up action is needed. Communication and review of monitoring reports must be described in the monitoring plan, including: If independent monitoring is used, the expertise and roles for the personnel (i.e., individual or group) conducting monitoring along with the plans to ensure independence is maintained. Report format and content that describe how data are reported and reviewed. Timing, frequency, and character (e.g., open or closed, public or private) of routine and ad hoc (i.e., monitoring reports that are more frequent than planned) monitoring reviews. If risks are identified that would trigger escalation, expedited reporting timelines should be provided. Reporting procedures for communicating among all interested parties (e.g., principal investigator, study staff, sponsor, the independent monitor(s), the IRB, the NIH ICO, and other applicable regulatory agencies). Procedures must state who receives reports (see Roles and Responsibilities). Process for ensuring interested parties are provided with adequate communication and information, including study documents, to carry out their duties. Maintaining confidentiality of the data and participants throughout the study when preparing, communicating, or reviewing reports and when discussing or responding to monitoring reports. Monitoring Plan Amendments Monitoring plans may require amendments periodically throughout the study. Reasons may include, but are not limited to, changes in study documents (e.g., protocol amendments), corrective or preventive actions, or identification of new and important risks that change the study's risk assessment and risk-based monitoring plan. Monitoring Costs Costs associated with monitoring may be allowable under the budget for the study. This may include funds for monitoring, including compensation for independent monitors. These costs may include, but are not limited to, study staff time for monitoring activities and independent monitor time for reviewing reports and participating in meetings. Proposed Supplemental Resources To assist the research community in understanding and implementing the draft updated policy, supplemental resources such as guidance documents, templates, or educational material may be created. Suggested topics for supplemental resources may include understanding how to: implement data and safety monitoring, develop effective risk-based data and safety monitoring approaches and plans, and implement data and safety monitoring to ensure ethical conduct and valid scientific results. NIH may also consider providing example plans in the approved format and SI-assisted tools for reformatting to minimize burden. NIH is seeking input on supplemental resources that may assist the research community with developing and implementing a risk-based monitoring plan for their clinical research study. Please note that the suggested topics are proposed rather than final supplemental resource topics and this list is not exhaustive.

Similar Contracts

Same NAICS industry code

NAICS: 541618
New
SLED
Evaluation, Monitoring and Verification Consultant
Solicitation # 2026-007
The New Hampshire Department of Energy is soliciting proposals for an Evaluation, Monitoring, and Verification (EM&V) Consultant to provide advisory services for energy efficiency programs. The selected consultant will offer strategic guidance on EM&V scope, methods, scheduling, and reporting standardization, while also addressing ISO-NE forward capacity market evaluation requirements. Key responsibilities include recommending the selection and oversight of independent third-party evaluators, advising on benchmarking metrics, and potentially providing testimony before the Commission. The contract is for a three-year term starting December 16, 2026, and ending December 31, 2029, with an option for up to three one-year extensions. The total contract value is capped at 540,000 dollars for the initial three-year period, including all expenses. Payments are subject to the Department's special utility assessment process. Proposals are due by November 5, 2026, and will be evaluated based on a 100-point scale focusing on experience and qualifications, though cost is a consideration and not the sole determining factor. Mandatory submission requirements include a detailed project fee schedule with hourly rates, identification of key personnel, and a project timeline. The consultant must comply with State of New Hampshire ethical requirements, non-discrimination laws, and specific insurance provisions, including the potential substitution of professional liability insurance.
Department Of Energy

POSTED

3 days ago

DEADLINE

in 3 days
View Details
NAICS: 541618
New
SLED
Increasing Access to Perimenopausal, Menopausal, and Postmenopausal Health Care Services Through Community Health Workers
Solicitation # BPM059560
The Maryland Department of Health, Office of Population Health Improvement, is seeking a certified small business to conduct an evaluation and develop an action plan aimed at increasing access to perimenopausal, menopausal, and postmenopausal health care services. This initiative, required by the 2026 Maryland Legislative Session, focuses on utilizing community health workers to conduct outreach to consumers. The selected vendor will collaborate with the CHW Program, the State Community Health Worker Advisory Committee, and other stakeholders to produce a comprehensive final report and a detailed work plan. The projected period of performance for this contract is from January 11, 2027, through August 31, 2027. This is a Small Business Reserve Procurement, meaning the award is limited to businesses certified by the Governor’s Office of Small, Minority & Women Business Affairs. Eligible offerors must demonstrate at least two years of experience working with community health workers and provide evidence of expertise in menopausal health care services within Maryland. The evaluation process follows a two-step approach where technical proposals are screened for merit before financial proposals are reviewed. The final award will be based on the Most Advantageous Offer, with technical factors receiving greater weight than financial considerations. Proposals must be submitted via the eMaryland Marketplace Advantage portal by November 19, 2026.
Office of Population and Health Improvement

POSTED

4 days ago

DEADLINE

in 17 days
View Details

More opportunities from National Institutes Of Health

Same awarding agency

NAICS: 541612
Federal
Cybersecurity Operations & ComplianceThe contract titled Cybersecurity Operations & Compliance is a subcontract under the National Institutes of Health, part of the Department of Health and Human Services, aimed at delivering continuous cybersecurity monitoring, real-time threat detection, rapid incident response, and policy compliance services for NIH IT systems. The work is performance-based and requires the contractor to maintain robust, 24/7 operational capabilities to identify, analyze, and mitigate cyber threats across NIH infrastructure, ensuring alignment with federal security standards and regulatory requirements. The place of performance is designated as Bethesda, Maryland, with a zip code of 20892, indicating the primary location for service delivery, even though no specific office address or point of contact is provided. The contract is classified under NAICS code 541612, which corresponds to Computer Facilities Management Services, signaling that the focus is on managed cybersecurity operations rather than hardware or software procurement. It was posted on June 25, 2026, suggesting this is a future opportunity under solicitation, though no solicitation number is listed. As a subcontract, this effort supports a prime contractor or larger program, meaning the successful bidder will integrate their services into an existing cybersecurity framework. The absence of set-aside information implies the opportunity may be open to all eligible small or large businesses without specific socioeconomic preferences. The contractor must be prepared to operate at a high tempo, maintain strict compliance, and respond effectively to evolving cyber threats impacting critical health research systems.
Human Resources Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 333998
Federal
Procurement of Service Support of Rees Scientific Electronic Temperature Monitoring System in DLM
Solicitation # NOI-CC-26-003181
The National Institutes of Health intends to award a sole-source, severable firm-fixed-price contract to Rees Scientific USA for service support, validation, and calibration of the Electronic Temperature Monitoring System within the Department of Laboratory Medicine in Bethesda, Maryland. With an estimated value of 21,593.43 dollars, the contract covers a twelve-month base period from April 24, 2026, through April 23, 2027. The procurement is justified under FAR 6.302-1 and 41 U.S.C. 253(c)(1) as Rees Scientific is identified as the only responsible source capable of meeting specific technical requirements, including ISO 9001:2015 certification, ISO 17025 accreditation, and the ability to support a hybrid configuration of hardwired, wireless, and Wi-Fi sensors. The scope of work includes the annual qualification and calibration of sensors for temperature, humidity, CO2, and differential pressure using NIST traceable instruments to ensure compliance with CAP, cGMP, and 21CFR requirements. Key deliverables involve executing Design, Installation, Operational, and Performance Qualifications, providing durable certification labels for all monitored equipment, and implementing system security upgrades such as TLS 1.2 encrypted SQL database connections. The system must be fully Windows-based, supporting up to 128 sensors per node with eight levels of user access permissions. All services must be performed by trained Rees technicians who meet the necessary education and certification standards for a clinical laboratory environment.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

8 months ago

DEADLINE

in over 1 year
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS