Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drive System & Actuation Subsystem

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333992
New
Federal
Draft Solicitation - Aberdeen Test Center Welding, Machining, Painting, and Fabrication Services
Solicitation # W91CRB-27-R-A002
Solicitation W91CRB-27-R-A002 is an indefinite-quantity request for non-personal welding, machining, painting, and fabrication support services for the U.S. Army Aberdeen Test Center at Aberdeen Proving Ground, Maryland. The scope of work includes fabrication and finishing, powder coating, painting of buildings and equipment, and the production of signage and insignia to support various cores such as Automotive, Live Fire, and Warfighter. The contract is a total small business set-aside under NAICS 333992, with an estimated total value of 5,000,000 dollars. The period of performance consists of a 45-day phase-in, a 57-month ordering period running from approximately December 2026 through December 2031, and a 45-day phase-out. Award will be based on the Lowest Price Technically Acceptable (LPTA) process, requiring an acceptable rating in both technical and past performance factors. The pricing structure utilizes a mix of Time and Materials (T&M) and Firm Fixed Price (FFP) task orders. Contractor performance will be monitored via a Quality Assurance Surveillance Plan, and all invoicing must be processed through the Wide Area WorkFlow system. Key requirements include the management of Government Furnished Property, adherence to strict labor qualifications and certifications, and the submission of a comprehensive proposal consisting of four volumes, including technical approach, past performance, price, and required certifications.
W6QK Acc-Apg

POSTED

about 16 hours ago

DEADLINE

in 9 days
NAICS: 333992
New
SLED
Welders and Guns for Hammond Bids must be for exact items. NO SUBSTITUTIONS
Solicitation # 40023-S27005
Solicitation 40023-S27005 is an invitation for bids issued by Northshore Technical Community College for the procurement of specific welding machinery and accessories for the Hammond Campus. This is a proprietary, brand-name-only bid that strictly prohibits substitutions. The required items include three 12 FT to 7 FT M Connector Cables (K2910-2), ten Magnum Pro 250L Welding Guns (K4874-2), three Magnum Pro 15 FT push/pull guns (K4797-1), and two Power Wave 300C Advanced Education One Paks (K4934-1). Bids must be submitted by November 16, 2026, at 11:00 AM via post or email to Richard Butler. The contract is governed by Louisiana state laws and purchasing regulations, including L.R.S. 39:1551–1736, and allows for preferences for products manufactured or assembled in Louisiana. Awardees must provide complete pricing, including prepaid transportation to the destination, with prices remaining firm for at least 30 days. Delivery cannot occur before July 1, 2026. Payment will be made within 30 days of delivery or invoice receipt via electronic funds transfer, LaCARTE card, or check. The agreement may be extended for two additional 12-month periods, not to exceed a total term of 36 months, and the college reserves the right to cancel the contract with 30 days' written notice.
- Comm/Tech College - Northshore Technical Community College

POSTED

2 days ago

DEADLINE

in 20 days
NAICS: 333992
New
SLED
Welders and Guns for Livingston Bids must be for exact items. NO SUBSTITUTIONS
Solicitation # 40023-S27006
Solicitation 40023-S27006 is an invitation for bids issued by Northshore Technical Community College for the procurement of specific welding machinery and equipment to be delivered to the Walker Campus. This is a proprietary, brand-name-only solicitation where no substitutions are accepted. The required items include a Keen K-200 Rod Oven, Wilton Mechanics Pro Vices, Lincoln Power Mig and Power Wave units, connector cables, Magnum Pro push-pull guns, and a Victor cutting machine. Bids must be submitted by November 16, 2026, at 11:00 AM via post or email to the Lacombe STEM Campus. The contract is governed by Louisiana state laws, including L.R.S. 39:1551–1736, and allows for preferences for products manufactured or assembled in Louisiana. Award may be made on an all-or-none, grouped, or separate item basis. Bid prices must include prepaid transportation to the destination and remain firm for at least 30 days. Delivery cannot occur before July 1, 2026. Payment will be processed within 30 days of delivery or invoice via EFT, LaCARTE card, or check, using FY 27 funds. The agreement may be extended for two additional 12-month periods, not to exceed a total term of 36 months, and the college retains the right to cancel the contract with 30 days' written notice.
- Comm/Tech College - Northshore Technical Community College

POSTED

2 days ago

DEADLINE

in 20 days
NAICS: 333992
New
SLED
High Power Programmable Beam Shaping Laser I Procurement Services I SOLE SOURCE |
Solicitation # oregon-state-university-1295908
Oregon State University is seeking a sole source contract with Civan Advanced Technologies Ltd. to acquire a high power programmable beam-shaping laser for the Pacific Northwest Institute for Advanced Manufacturing. This specialized equipment is essential for providing technical assistance and training to small manufacturers in the aerospace, defense, semiconductor, and energy-storage sectors. The laser must meet rigorous technical standards, including a continuous-wave near-infrared output of at least 16 kW, dynamic beam shaping via coherent beam combining, and the ability to reconfigure beam patterns at MHz rates without moving optical elements. The system must support arbitrary, user-programmable intensity distributions and integrate seamlessly with a six-axis robotic manipulator and an existing Proto Manufacturing roboXRD X-ray diffractometer. Key requirements include an open command interface for synchronization with robot motion, a user-accessible pattern library for process recipes, and comprehensive vendor training support. Civan Advanced Technologies Ltd. has been identified as the only supplier capable of meeting these specific technical parameters and operational needs. Challenges to this sole source determination must be submitted to Cassandra Hurd by the response deadline of October 28, 2026.
Oregon State University

POSTED

7 days ago

DEADLINE

in about 12 hours

AI Contract Overview

Show more

This contract focuses on the supply and integration of hydraulic and pneumatic actuators capable of applying dynamic forces along three axes (Fz, Fy, Fx) and moments (Mx, My, Mz) with high load capacity and precise speed control at six inches per second. The work is related to the Drive System and Actuation Subsystem and is set to be performed at Wright Patterson Air Force Base. The solicitation is a subcontract from the Department of Defense under the NAICS code 333992, which pertains to fluid power pump and motor manufacturing. The contract was posted on April 22, 2026, with a response deadline of May 18, 2026, at 8:00 PM. It is managed by the Department of Defense's FA9101 Aedc Pkp Procurement Branch. Although no set-aside type is specified, the focus is on delivering systems capable of handling precise dynamic force and moment applications, likely for advanced testing or operational environments requiring robust actuation solutions.

General Info

Supply and integration of hydraulic, pneumatic actuators for precise dynamic force control at Wright Patterson AFB.

NAICS

333992 - Welding and Soldering Equipment Manufacturing

Place of Performance

Wright Patterson AFB, OH, USA

Set-Aside

NONE

Documents

This scope was carved out of FA9101ELTFM.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Extreme Loads Tire Force Machine

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and integration of hydraulic/pneumatic actuators to apply dynamic forces (Fz, Fy, Fx) and moments (Mx, My, Mz) at high load and controlled speed (6 in/sec).

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
Industrial Process Furnace and Oven Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS