Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

E2 (SRF) YSK-DD4 REPAIR OF DOCK STRUCTURES

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
1) Desired Completion Date: FY26Q1 3) Fund Source: CNIC Fund 4) Supported Customer: SRF 5) When will be fund available (If Customer Fund): N/A 6) Work Priority: Pri-1, Normal Work 7) Plant Replacement Value (PRV): N/A 1. Scope of Work: a. Perform complete repair of dock structures (wall alters and floors). (1) Repair of dock structures (wall alters and floors). 2. Justification / Reason: a. Even though Yokosuka Dry dock #4 is U. S. Navy certified dry dock, engineering study for maintenance/repair the dock structure has never conducted before. As a report of annual dry dock inspection conducted by NAVFAC PW5, dock structure shows major cracks and erosion due to age, and also there are leakage of subsurface water from the walls. Since this dry dock is over 100 years old. SRF would like to request to perform the complete repairs as required. b. This work request has been generated by Dry Dock Safety Certification Audit reported item by NAVSEA of 29 November 2017. 3. Recommendation / Information / Special Requirements: a. SRF desires to start an engineering study and design in FY23. b. Please see the enclosed (1) FY19 Control Inspection reports for Dry dock #4 by NAVFAC PW5 (2) Naval Sea System Command(NAVSEA) Audit letter (Sr 04X/305) of 16DEC2019 c. There is similar project at DD#5 and #6.