NNSY BLDG 237 REMOVE UNDERGROUND GASOLINE STORAGE TANKS

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the permanent closure and removal of two 12,000 gallon underground gasoline storage tanks at NNSY 237. The scope of work includes the removal of two gasoline dispensers, underground fuel piping, and the gasoline loading rack, as well as the disconnection of UST gauges and sensors from the Veeder-Root automatic tank gauging system. All electrical connections to the tanks and associated equipment must be removed and de-energized. The contractor is responsible for ensuring all activities comply with EPA and DEQ regulatory requirements and must prepare a final UST closure report for submission to the Virginia DEQ. It is noted that emptying the tanks and transferring existing fuel may be required on a short timeline, which could necessitate a separate contract action. The project timeline is structured with scope in FY22, design in FY23, and construction scheduled for FY24 through FY26.

General Info

Closure and removal of two gasoline storage tanks and equipment at NNSY 237.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Permanently close and remove the two, 12,000 gallon (each) underground gasoline storage tanks at NNSY 237 in accordance with EPA/DEQ regulatory requirements and prepare UST closure report for submittal to Virginia DEQ. Remove the two, existing gasoline dispensers, underground fuel piping, and gasoline loading rack at NNSY 237. Disconnect UST gauges/sensors from existing Veeder-Root automatic tank gauging system in Bldg. 237 and remove/de-energize all existing electrical connections to USTs and associated equipment. Note: Due to potential EPA/DEQ requirements, emptying the tanks and transferring the existing fuel be required in a relatively short term frame. A separate contract action may be required to accomplish that. EV will provide clarity as soon as it’s available... SCOPE FY22/ DESIGN FY23/ CONST FY24(26).

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navfac Mid-Atlantic

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS