NNSY BLDG 237 REMOVE UNDERGROUND GASOLINE STORAGE TANKS
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This project involves the permanent closure and removal of two 12,000 gallon underground gasoline storage tanks at NNSY 237. The scope of work includes the removal of two gasoline dispensers, underground fuel piping, and the gasoline loading rack, as well as the disconnection of UST gauges and sensors from the Veeder-Root automatic tank gauging system. All electrical connections to the tanks and associated equipment must be removed and de-energized. The contractor is responsible for ensuring all activities comply with EPA and DEQ regulatory requirements and must prepare a final UST closure report for submission to the Virginia DEQ. It is noted that emptying the tanks and transferring existing fuel may be required on a short timeline, which could necessitate a separate contract action. The project timeline is structured with scope in FY22, design in FY23, and construction scheduled for FY24 through FY26.
General Info
Place of Performance
USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Navy → Navfac Mid-Atlantic
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
