Repair Eroded Shore line at Carlson Spit B7130, Bangor (20358245) (DB-IH)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project, managed by Navfac Northwest for the Department of the Navy, involves repairing the eroded shoreline at Carlson Spit B7130 in Bangor. The erosion poses a significant risk to the stability of the Carderock pier and has resulted in a loss of critical storage space for oil booms. Originally part of a larger boat ramp project, this effort was separated to independently manage the specific environmental approvals required for the shoreline work. The project is currently listed as a forecast with a NAICS code of 237990. Administrative records indicate that the project was assigned to Richard Goins with a planned timeline for design in fiscal year 2022 and construction in fiscal year 2023. Recent status updates confirm that the design pre-award process is on schedule and the necessary SAES documentation is being prepared.

General Info

Navfac Northwest will repair the eroded shoreline at Carlson Spit B7130 in Bangor.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NW: BANGOR PDC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Carlson spit is eroding away and is in danger of affecting stability of Carderock pier and Port operations is losing storage space for oil booms. Was part of Boat Ramp project, but because of environmental approvals required by this project, it was split away from the boat ramp project.; Status Note (as of 26-MAY-21): WIB - To be discussed at the 6/3/21 WIB meeting.; Status Note (as of 27-MAY-21): To be assigned.; Status Note (as of 03-JUN-21): To be assigned.; Status Note (as of 26-MAY-21): WIB - To be discussed at the 6/3/21 WIB meeting. Requires SAR ep #1701650 & 1391 ep #1701647, notified Molly Clendenin.; Status Note (as of 10-JUN-21): To be assigned.; Status Note (as of 17-JUN-21): SUMMARY: SAES being prepared.//COSTS: Nothing significant to report.//SCHED: Design pre-award on schedule.//ENV: N/A.//OTHER: N/A.; Status Note (as of 24-JUN-21): To be assigned.; Status Note (as of 29-JUN-21): To be assigned.; Status Note (as of 08-JUL-21): To be assigned.; Status Note (as of 15-JUL-21): SUMMARY: SAES being prepared.//COSTS: Nothing significant to report.//SCHED: Design pre-award on schedule.//ENV: N/A.//OTHER: N/A.; Status Note (as of 22-JUL-21): To be assigned.; Status Note (as of 04-AUG-21): To be assigned.; Status Note (as of 12-AUG-21): To be assigned.; Status Note (as of 19-AUG-21): SUMMARY: To be assigned.//COSTS: N/A.//SCHED: N/A.//ENV: N/A.//OTHER: N/A.; Status Note (as of 26-AUG-21): To be assigned.; Status Note (as of 31-AUG-21): To be assigned.; Status Note (as of 10-SEP-21): To be assigned.; Status Note (as of 14-SEP-21): Assigned to Richard Goins.; Status Note (as of 14-SEP-21): Assigned to Richard Goins. FY22 Design/FY23 Construction.; Status Note (as of 16-SEP-21): SUMMARY: SAES being prepared.//COSTS: Nothing significant to report.//SCHED: Design pre-award on schedule.//ENV: N/A.//OTHER: N/A.; St ... NOTE: description has been truncated, please see Project Note for full description.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 7 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 8 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency

NAICS: 236220
Federal
MSR #23207821_1787796 -- (23207821) Repair Crane Track and Tunnel Arch Support DD1, PSNSThis project involves comprehensive seismic upgrades to the superstructure and substructure of a facility managed by Navfac Northwest, specifically focusing on the repair of crane tracks and tunnel arch support. The scope of work includes retrofitting building brace connections, modifying restrooms for American Barrier Act compliance, and updating heating and ventilation systems. Additionally, the project requires the removal and reinstallation of various architectural, electrical, and mechanical interferences, including plant equipment, shop tools, and storage racks. Electrical upgrades will be implemented to install a 480VAC three-phase grounded system and correct documented HDA safety hazard deficiencies across RAC 2, 3, and 4 categories. All work must comply with the Unified Facility Code, National Fire Protection Association, and International Building Code, while prioritizing energy efficiency and low life cycle costs. Because the machine shop is on the historical register, all modifications require review and concurrence from the State Historical Preservation Office to maintain the building's historical integrity. Station support will be provided through red badge escorts, outage coordination, hazardous material handling assistance, and a facility production process specialist to ensure seamless project execution.
Commercial and Institutional Building Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS