Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Repair Substation 6, Bangor

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the comprehensive repair and upgrade of Substation 6 in Bangor, managed by Navfac Northwest. The primary scope of work includes replacing four existing power transformers with new 7.5/10.5 MVA units featuring advanced microprocessor protection, differential protection, and less-flammable oil. The contractor is required to perform load flow readings to determine peak demand and implement a new 115-kV bypass of the substation yard using overhead lines on wood poles with manually operated switches and necessary right-of-way clearing. Additional infrastructure improvements include the installation of motor-operated switches for transformer isolation and a new ground grid with station rock compliant with IEEE 80 standards. The project also mandates the replacement of existing 15 kV switchgear inside building B7701 with a new 2000A ring bus design featuring Schneider AMI metering, rack-mounted microprocessor relays, and arc flash duct mitigation. Disposal requirements specify that most old transformers be moved to a government spares yard, while transformer T64 must have its oil removed and be sent to a recycling facility.

General Info

Navfac Northwest project to repair Substation 6, upgrading transformers, switchgear, and ground grids.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

NW: BANGOR PDC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
MSR 22562453 1391 ep #1764134 E2 ep #1771243 1. Replace 4 existing power transformers with new minimum 7.5/10.5 MVA power transformers A/FA, 115 kV Delta-12.47 kV Wye. Perform load flow readings with temporary metering to determine the peak demand for sub.6. Include feeder switching to Delta Pier in load flow study. 2. Provide new 115-kV bypass of sub.6 yard with overhead line on wood poles and manually operated 3-way 115-kV manual switches at connection points outside of sub.6 yard. Include right of way clearing for new poles. 3. Provide transformer microprocessor protection relay with differential protection, CS monitoring and alarm, less-flammable oil, RTD winding sensors, Buchholz pressure relief relay, and accessory dials per WBDG spec. 4. Existing power transformers shall be delivered to govt. spares storage yard near helipad with the exception of power transformer T64 which shall have the oil removed and disposed of with the remaining dry T64 transformer delivered to Bangor recycling. 5. Provide motor operated switches for transformer high side and low side isolation. 6. Install new ground grid and connect to existing ground grid and include new station rock complying with IEEE 80 for the entire substation yard. 7. Replace existing 15 kV switchgear inside B7701 with new 15 kV, 2000A, 3Φ, 3W+G, having double high breaker cubicles and 15-kV ring bus design. Include Schneider AMI metering connected to Bangor AMI network, separate rack mounted microprocessor relays (away from breaker arc flash zone) with backup microprocessor relays for each 15-kV breaker, implement full IEEE function protection for feeder relays including 50, 51, 27, and other available functions, provide arc flash duct mitigation, switchgear ring bus tie breaker configuration, station control power transformer, spare cubicle fully pr ... NOTE: description has been truncated, please see Project Note for full description.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
This contract involves Davis Bacon construction services for the FAA Airport Technology Research and Development branch at the William J. Hughes Technical Center in Atlantic City, NJ. The project focuses on the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs and pavement structures, including a stabilized drainable base course. The scope includes providing aggregate subbase, performing minor design adjustments, and managing material procurement and waste disposal. The work incorporates specialized material characterization tests such as California Bearing Ratio and Plate Load tests, with critical operations phased to allow for subgrade adjustments and site restoration. The project is designated as a Small Business set-aside, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. Managed by Parsons Corporation, the work is generally performed during normal business hours, Monday through Friday, with some flexibility for after-hours and weekend work. The project also requires the integration of professional testing laboratories and geotechnical engineering services for design and inspection.
Parsons Corporation

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
Ffa Last Mile Project Phase 2
Solicitation # IT-FIBER25
The City of Indio, California, is soliciting bids for the FFA Last Mile Project Phase 2, identified as solicitation IT-FIBER25. This public works project involves the installation of 1-inch and 2-inch HDPE roll conduit, vaults, and underground fiber cable with slack, as well as splicing. The scope of work includes directional boring, micro-trenching, machine cut open trenching, and the removal and replacement of asphalt and concrete. All work must be performed in accordance with the 2024 edition of the Standard Specifications for Public Works Construction, applicable permits, and regulations. Bidders must possess a valid California Class A General Engineering Contractor or C-7 Low Voltage Systems Contractor license, a current City business license, and registration with the DIR. Evaluation is based on the bidder's financial standing, general competency, and specific experience in fiber optic outside-plant construction, including the availability of certified fiber splicing technicians and OTDR and power-meter testing capabilities. Bids are due by 11:00 AM on December 10, 2026, and must include a bid security of at least 10% of the total bid. The contract requires performance and payment bonds equal to the contract price, as well as a warranty or maintenance bond valid for one year from acceptance. A 5% retention will be withheld from progress payments. Liquidated damages are set at $1,000 per calendar day for any work remaining incomplete beyond the project deadline. As a public work project, the contractor and all subcontractors must pay wages in accordance with Labor Code Section 1770 et seq.
City of Indio, California

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237130
New
SLED
On-Call Fiber-Optic Network (FON) Enhancements and Repairs
Solicitation # SE-26-02
The Port of Long Beach is seeking a qualified contractor for solicitation SE-26-02 to provide on-call design, procurement, construction, and installation services for its Fiber-Optic Network (FON). The scope of work involves performing enhancements and repairs, providing materials such as fiber-optic cable, microduct, conduit, vaults, and hubs, and integrating these components into the existing network. The contractor is required to use microduct and air-blown fiber as the standard installation methodology, conduct quality assurance testing, and provide training to Port staff on operation and maintenance. All work is performed on a turnkey basis under the direction of the Port’s Security Division Project Management Team and is managed through the issuance of specific task orders. This is an on-call contract with a rate sheet covering a three-year period, utilizing both prevailing and non-prevailing wage rates. Proposals are evaluated on a 100-point scale focusing on team organization, technical approach, and a 10% combined SBE/VSBE participation goal. The selection process involves a written evaluation and potential interviews, with the Port not bound to accept the lowest bid. Key requirements include the provision of performance and payment bonds, adherence to ANSI/ICEE/NEMA/UL standards, and a maximum 15% markup on third-party materials. Proposals must be submitted via the PlanetBids portal by December 16, 2026. There is no specific set-aside status for this solicitation.
City of Long Beach, acting by and through its Board of Harbor Commissioners

POSTED

2 days ago

DEADLINE

in 18 days
View Details
NAICS: 237130
New
SLED
Ffa Last Mile Project Phase 2
Solicitation # IT-FIBER25
The FFA Last Mile Project Phase 2 (IT-FIBER25) is a public works construction project for the City of Indio, California, focused on the installation of a fiber optic network. The scope of work includes the installation of 1” and 2” HDPE roll conduit, vaults, directional boring, micro-trenching, and machine cut open trenching, as well as the installation of underground fiber cable with slack and splicing. The project also requires asphalt and concrete removals and replacements, with final site restoration and cleanup. The contract is awarded to the lowest responsive bidder based on the sum of the Base Bid and Schedule A. To be considered responsive, bidders must hold a valid Class A General Engineering Contractor license and demonstrate at least three consecutive years of experience in fiber optic outside-plant construction using permanent employees. Performance is divided into two phases: material procurement must be completed within 20 calendar days of the first Notice to Proceed, and construction must be completed within 180 working days of the second Notice to Proceed. The project is subject to the Build America, Buy America Act and requires compliance with prevailing wage rates under Labor Code Section 1770. Contractors must provide faithful performance and payment bonds equal to the contract price and maintain required insurance, including Workers’ Compensation. Invoicing is managed through a Leidos Project Coordinator who reconciles monthly preliminary invoices using Daily Production Reports. Payment is contingent upon the City Council appropriating sufficient funds for the fiscal year.
City of Indio

POSTED

2 days ago

DEADLINE

in 12 days
View Details

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency

NAICS: 236220
Federal
MSR #23207821_1787796 -- (23207821) Repair Crane Track and Tunnel Arch Support DD1, PSNSThis project involves comprehensive seismic upgrades to the superstructure and substructure of a facility managed by Navfac Northwest, specifically focusing on the repair of crane tracks and tunnel arch support. The scope of work includes retrofitting building brace connections, modifying restrooms for American Barrier Act compliance, and updating heating and ventilation systems. Additionally, the project requires the removal and reinstallation of various architectural, electrical, and mechanical interferences, including plant equipment, shop tools, and storage racks. Electrical upgrades will be implemented to install a 480VAC three-phase grounded system and correct documented HDA safety hazard deficiencies across RAC 2, 3, and 4 categories. All work must comply with the Unified Facility Code, National Fire Protection Association, and International Building Code, while prioritizing energy efficiency and low life cycle costs. Because the machine shop is on the historical register, all modifications require review and concurrence from the State Historical Preservation Office to maintain the building's historical integrity. Station support will be provided through red badge escorts, outage coordination, hazardous material handling assistance, and a facility production process specialist to ensure seamless project execution.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS