Ammunition Wharf Structural Repairs (Phase 1 of 9 ) (RM19-0940)

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ammunition Wharf Structural Repairs project, managed by Navfac Northwest for the Department of the Navy, focuses on restoring deteriorated structural components and hardware at Facility 832. The scope of work involves the removal of existing concrete pilings and the installation of replacement piles featuring cathodic protection and new pile caps. To facilitate crane access, specific deck and wall sections will be removed and subsequently replaced. Additionally, the project encompasses repairs to critical infrastructure including beams, bracing, channels, chock and fender systems, framing, girders, platform spans, under decking, utility enclosures, and wales. This initiative is structured as a nine-phase project, with priority scoping for each phase determined by Navfac Northwest structural engineers based on semi-annual pier inspections. While the SAR is valid until June 2029 and the EA is currently under development, the project is categorized as a forecast under NAICS code 237990. This specific solicitation pertains to Phase 1 of the overall repair effort.

General Info

Navfac Northwest Phase 1 structural repairs for Navy Ammunition Wharf Facility 832.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
SEED WFT MACC - MSR 21200798; Project repairs deteriorated structural components and associated hardware that are integral to Ammunition Wharf (Facility 832). The project includes removing the existing concrete pilings, installing replacement piles with cathodic protection and constructing pile caps over the tops of the replacement piles. Existing deck and wall sections will be removed for crane access and then replaced. The project also repairs other primary structural components and hardware such as beams, bracing, channels, chock systems, fender systems, framing, girders, platform spans, under decking, utility enclosures, and wales. This is a 9 phased project which NAVFACNW Structural engineers in correlation with semi-annual pier inspections will determine priority scoping requirements for each of the nine phases. SAR- is already developed and is valid until JUN 2029 EA- is being developed under SR#17835004 & ePRJ# 1647994 There is a current 1391 but no SR# or ePRJ# to attach it to.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency

NAICS: 236220
Federal
MSR #23207821_1787796 -- (23207821) Repair Crane Track and Tunnel Arch Support DD1, PSNSThis project involves comprehensive seismic upgrades to the superstructure and substructure of a facility managed by Navfac Northwest, specifically focusing on the repair of crane tracks and tunnel arch support. The scope of work includes retrofitting building brace connections, modifying restrooms for American Barrier Act compliance, and updating heating and ventilation systems. Additionally, the project requires the removal and reinstallation of various architectural, electrical, and mechanical interferences, including plant equipment, shop tools, and storage racks. Electrical upgrades will be implemented to install a 480VAC three-phase grounded system and correct documented HDA safety hazard deficiencies across RAC 2, 3, and 4 categories. All work must comply with the Unified Facility Code, National Fire Protection Association, and International Building Code, while prioritizing energy efficiency and low life cycle costs. Because the machine shop is on the historical register, all modifications require review and concurrence from the State Historical Preservation Office to maintain the building's historical integrity. Station support will be provided through red badge escorts, outage coordination, hazardous material handling assistance, and a facility production process specialist to ensure seamless project execution.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS