Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

(DB-IH) Conduct Fire Protection Design, Dry-Dock Pump Well, Bldg. 7424, TRF-Bangor (20340242)

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the architectural and engineering design of a comprehensive fire protection system for the Bangor Dry-dock Pump-well, Building 7424, located at the Trident Refit Facility in Bangor. The scope of work requires the design of UFC 3-600-1 compliant sprinkler systems, alarm systems, and smoke evacuation systems to address critical life safety deficiencies identified in a 2021 engineering survey. Additionally, the design must incorporate necessary structural modifications and ensure the facility meets emergency egress requirements for its multi-story below-grade industrial occupancy. Managed by Navfac Northwest for the Department of the Navy, the project is scheduled for design completion in FY24 Q4 with construction targeted for FY25 Q4. The facility houses essential dewatering pumps, drainage pumps, and electrical substations critical to dry-dock operations. These design efforts are intended to support future Sustainment, Restoration and Modernization Program Projects planned for FY25 or later.

General Info

Design of fire protection and life safety systems for Bangor Dry-dock Pump-well.

NAICS

541330 - Engineering Services

Place of Performance

NW: BANGOR PDC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
DELIVERABLE: CAT2, DB-IH PSC CODE: C1EC – ARCHITECT AND ENGINEERING-CONSTRUCTION, OTHER INDUSTRIAL FACILITES UNIFORMAT MASTER SYSYTEM: D40 – FIRE PROTECTION REQUESTED SCHEDULE: DESIGN FY24 Q4 – CONSTRUCTION FY25 Q4 LOCATION: PMPG STA, BELOW DECK, BLDG. 7420, NBK-BANGOR 1391 REQUIRED: YES FOR CONSTRUCTION PACKAGE REQUIREMENT: This Service Request tasking is to design a fire protection system for the Bangor Dry-dock, Pump-well, B7424, to include UFC 3-600-1 compliant sprinkler systems, alarm systems, and smoke evacuation systems in the Pump-well as per recommende4d within the listed survey report referenced below. Design shall also include structural modifications and meet emergency egress requirements. It is expected that these designs will support follow-on Sustainment, Restoration and Modernization Program Projects, tentatively planned for FY25 at the earliest. BACKGROUND: The April 2021 PSNS&IMF Fire Protection Engineering Surveys Report, Trident Refit Facility, Bangor, identified fire protection deficiencies in the Bangor Dry-dock Pump-well, B7424. The Pump-well is classified as multi-story below-grade building requiring fire protection. The Pump-well is a special purpose industrial occupancy and is not equipped with fire sprinkler, fire alarm or smoke exhaust systems. The building houses the main dewatering pumps, drainage pumps, controls and electrical substations that are essential for dry-dock operations and lack emergency occupant egress openings. JUSTIFICATION: Life Safety Compliance NOTES (References): 1. 1391 Required-YES, for Construction Package 2. PSNS&IMF Fire Protection Engineering Survey Report (FPESR), Trident Refit Facility, Bangor 01 Apr 21 -- N44255-16-D-2006, Work Order 1664197 (NOTKIN/P2S). • FPESR is CUI and can be obtained by ... NOTE: description has been truncated, please see Project Note for full description.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project under solicitation RFP-JV-26-013. The scope of work encompasses project initiation, data gathering, basis of design, detailed design, and procurement support, with specific deliverables including technical specifications for flow control, SCADA systems, and I&C integration. The project requires compliance with California Code of Regulations Title 22 for indirect potable reuse and adheres to Cal OSHA, ADA, and NFPA standards. The agency aims to begin construction of injection and monitoring wells by May 2028 and complete injection well equipping by July 2029. This is a small business set-aside opportunity open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. Proposals must be submitted via PlanetBids by January 26, 2027, and must not exceed 35 pages. Selection is based on a ranking of proposals focusing on team qualifications and the level of effort, with the top three candidates potentially undergoing interviews before the top-ranked consultant negotiates a not-to-exceed contract. All payments are made via ACH, and the agency retains ownership of all project materials and data.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency (IEUA) is soliciting engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves the design and development of a purified water conveyance system to transport water from the Advanced Water Purification Facility to injection wells. Key responsibilities include project initiation, data gathering, detailed design, and assistance during the bid phase. Deliverables consist of technical reports, specifications, calculations, construction schedules, and Opinion of Probable Construction Cost estimates. The project follows a tiered design acceptance process at 60 percent, 90 percent, and final stages, and must adhere to specific engineering design guidelines and federal and state grant funding requirements, including Buy America preferences for infrastructure materials. This is a small business set-aside opportunity available to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. The contract is a not-to-exceed agreement paid on a time and material basis, with a specific 50,000 dollar allowance for mitigation measures. Proposals are due by January 26, 2027, and will be evaluated based on a 100-point scale focusing on risk mitigation, technical challenges, and project implementation. Selection is based on a ranking process where the top three consultants are shortlisted for fee review and potential interviews before final approval by the IEUA Board of Directors. All work is governed by the laws of the State of California and the County of San Bernardino.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
Walk-In Evidence Freezer Room – Assessment & Planning Consulting Services for Sacramento Sheriff's Office (SSO)
Solicitation # 2026-RFP-0128
The Sacramento County Sheriff's Office (SSO) is seeking a qualified consulting firm to evaluate the existing walk-in evidence freezer room at the Property Warehouse. The primary objective is to assess current conditions, identify deficiencies, and provide a comprehensive report recommending whether to repair or replace the equipment and related systems. The project is divided into two phases: Phase 1 involves a thorough assessment including photographs, measurements, and an improvement plan, while an optional Phase 2 covers the production of bid-ready construction documents. All work must be led by a California-licensed engineer, and any design documents must be signed and sealed by one. This is a consulting services contract only; the selected firm will not be responsible for the actual furnishing or installation of the freezer. The project must adhere to California Penal Code Section 1417.5, California Department of Justice standards, IAPE guidelines, and NIST recommendations. Funding is provided by the County, though equipment may be purchased via the Edward Byrne Memorial Justice Assistance Grant (JAG), which subjects equipment purchases to the Buy American Act and NEPA rules. Proposals must be submitted via the SacCountyE bids portal by December 18, 2026. There is no specific set-aside status for this solicitation. Payment for the assessment and design phases is contingent upon County acceptance of the completed deliverables.
DGS: CAPSD - Procurement

POSTED

about 18 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
Professional Design Services For The Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project
Solicitation # 20261127006
The City of Emeryville is seeking professional design services for the Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project. The scope of work involves the full replacement of the gravity sewer main from MH 21.100.27 to MH 21.000.00, with a focus on mitigating differential settlement caused by bay fill soil and increasing pipe slope by lowering the final invert elevation at MH 21.000. The selected engineering team will be responsible for delivering Plans, Specifications, and Estimates (PS&E), developing public outreach plans, and coordinating connections with the EBMUD North Interceptor pipeline, as well as collaborating with Caltrans and other agencies. Proposals are due by January 6, 2027, and will be evaluated based on technical experience with sewer main design in soft soil conditions, project approach, experience coordinating with EBMUD, and methods for maintaining budget and schedule. The selection process may include shortlisting and interviews before negotiating a not-to-exceed price contract. The project requires adherence to the City's standard professional services contract, including insurance requirements and compliance with Emeryville Municipal Code regarding minimum wage and living wage ordinances. Design submittals are required at 30%, 60%, 90%, and final design phases. There is no set-aside status for this solicitation.
City of Emeryville

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency

NAICS: 236220
Federal
MSR #23207821_1787796 -- (23207821) Repair Crane Track and Tunnel Arch Support DD1, PSNSThis project involves comprehensive seismic upgrades to the superstructure and substructure of a facility managed by Navfac Northwest, specifically focusing on the repair of crane tracks and tunnel arch support. The scope of work includes retrofitting building brace connections, modifying restrooms for American Barrier Act compliance, and updating heating and ventilation systems. Additionally, the project requires the removal and reinstallation of various architectural, electrical, and mechanical interferences, including plant equipment, shop tools, and storage racks. Electrical upgrades will be implemented to install a 480VAC three-phase grounded system and correct documented HDA safety hazard deficiencies across RAC 2, 3, and 4 categories. All work must comply with the Unified Facility Code, National Fire Protection Association, and International Building Code, while prioritizing energy efficiency and low life cycle costs. Because the machine shop is on the historical register, all modifications require review and concurrence from the State Historical Preservation Office to maintain the building's historical integrity. Station support will be provided through red badge escorts, outage coordination, hazardous material handling assistance, and a facility production process specialist to ensure seamless project execution.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS