East Hospital - Endoscopy Expansion and Cath Lab Upgrade

Closed
OSU-255807State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract will be awarded based on the lowest price, with pricing required for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to strict quality control standards, including a three-phase control system and specific technical standards such as MIL-STD-101 for piping and ASME A13.1 for color coding. Bonding requirements vary by proposal value, with projects over 150,000 dollars requiring bid, payment, and performance bonds. Administrative requirements include monthly invoicing via Wide Area Work Flow and compliance with the Davis-Bacon Act and the Americans with Disabilities Act. Proposals were due by November 23, 2026.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. With an estimated magnitude between 10 million and 25 million dollars, the project involves comprehensive demolition, the replacement of deteriorated components, and the construction of a 400 square foot addition for forklift battery charging. The scope includes critical upgrades to HVAC, fire protection, electrical systems, and the installation of a prefabricated paint booth and new bridge crane. A primary constraint is that the facility must remain operational and mission-capable throughout the process, requiring a strict two-phase execution plan with multiple mobilization and demobilization cycles. The project timeline requires work to commence within 15 calendar days of award, with the base bid completion due within 360 calendar days and an option period extending to 1,082 calendar days. Performance is subject to liquidated damages of 4,137 dollars per day for the base bid and 280 dollars per day for the option. Contractors must adhere to strict NAVFAC, UFC, and IBC standards, as well as cybersecurity and information safeguarding requirements under DFARS. Proposals must be submitted via the PIEE portal by December 7, 2026, and will be evaluated based on the most advantageous offer to the government, with a primary focus on price reasonableness.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business set-asides and covers a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value, as well as general liability insurance with a minimum of 1 million dollars per occurrence, within ten days of award. Final acceptance is contingent upon the successful testing of all restored systems and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
URI Washburn Hall Renovations Upper College Road Multi-Use Development Enabling
Solicitation # RFQ27007140
The University of Rhode Island is seeking a qualified general contractor for the Washburn Hall renovations and Upper College Road Multi-Use Development enabling work located at 75 Briar Lane in Kingston, Rhode Island. Under solicitation RFQ27007140, the project scope encompasses structural stabilization and reinforcement, selective demolition, and the renovation of office and conference rooms on the second and third floors. The work includes the installation of interior finishes, non-load-bearing steel framing, and gypsum board, along with necessary modifications to HVAC, electrical, telecommunications, fire protection, and fire alarm systems. All work must adhere to local and state building codes, with specific technical standards including NFPA 285 for fire safety and ACI 530.1/ASCE 6/TMS 602 for masonry tolerances. The contract is structured as an AIA A101-2017 Standard Form of Agreement, requiring both bid surety bonds and payment and performance bonds. Financial administration follows AIA Document G702 and G702A for progress payments, with the owner paying 95 percent of the amount due until substantial completion. Contractors must comply with Rhode Island Department of Labor and Training prevailing wage requirements, submitting certified payroll records monthly. Key personnel, including a project manager, superintendent, and safety engineer, must be assigned and identified during the pre-construction meeting. Deliverables include detailed shop drawings, coordination drawings, and product samples, with final acceptance contingent upon successful testing and inspection by the engineer and commissioning agent.
State of Rhode Island

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Ohio State University is soliciting qualifications for a Construction Manager at Risk (CMR) to lead a comprehensive, multi-phased renovation project at the Wexner Medical Center's East Hospital in Columbus, Ohio. With an estimated total project cost of $38,000,000, the scope includes significant upgrades to the fifth-floor Cardiac Catheterization Laboratory, the relocation and expansion of the first-floor Endoscopy Department, and the relocation of Rehabilitation Services. Additionally, the project involves reconfiguring public and administrative spaces, such as the hospital entrance and registration areas, and performing critical infrastructure work, including the replacement of a major air handling unit. Because the work will occur within an active healthcare environment, the selected partner must demonstrate extensive experience managing complex, phased renovations in occupied hospital settings to ensure that medical operations remain fully functional and safe for patients and staff. The selection process is qualifications-based, requiring firms to demonstrate expertise in healthcare construction, budget management through Target Value Design, and proficiency in a collaborative, BIM-enabled environment. The CMR will be responsible for preconstruction services, including constructability reviews, cost estimating, and schedule development, as well as managing the bidding process and construction execution. The project mandates strict adherence to University branding, sustainability standards, and Building Information Modeling (BIM) protocols, including specific use cases for model authoring, clash detection, and asset tagging. Furthermore, the successful firm must participate in the Encouraging Diversity, Growth & Equity (EDGE) program and utilize the University's eBuilder project management system for all compatible services. Responses must be submitted electronically in a single PDF format by October 2, 2026.

General Info

Ohio State seeks a Construction Manager for a $38 million Wexner Medical Center renovation.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this first9 pages · rfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • TJ Hall Strategic ImprovementsOpen now
  • Building 262 Renovations FLETC GlyncoOpen now, due in 16 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A

Full Description

Show more
Project number: OSU-255807
The Ohio State University is soliciting qualifications from experienced Construction Manager at Risk (CMR) firms for a comprehensive renovation project at The Ohio State University Wexner Medical Center's East Hospital, located at 181 Taylor Avenue, Columbus, Ohio. This transformative project will involve the strategic relocation and renovation of multiple departments on the first floor, as well as renovations within the fifth-floor Cardiac Catheterization Laboratory (Cath Lab). The project is intended to modernize facilities, enhance infrastructure, improve patient and staff circulation, and support the long-term strategic objectives of the health system. The completed design will incorporate The Ohio State University Wexner Medical Center branding and finish standards, aligning East Hospital with the system-wide patient experience and design framework. This multi-phased project requires a highly collaborative, detail-oriented, and adaptable CMR partner with demonstrated expertise in healthcare construction, cost estimating, and phased renovations within complex medical environments. Significant experience performing construction in occupied hospital settings is essential, as hospital operations must remain fully functional throughout all phases of work. The University and design team intend to leverage the selected CMR's expertise to evaluate phasing strategies, maximize the efficient use of resources and funding, and maintain a safe, positive environment for patients, visitors, and staff during construction. Funding has been approved for design services across all project components. Funding for the construction may be allocated either as a single construction package or through annual phased implementation, subject to leadership approval and funding availability at the time of construction. Project Scope: Cardiac Catheterization Laboratory (Cath Lab) -Upgrade medical equipment in two fifth-floor Cath Labs. -Renovate and modernize finishes throughout the department. -Expand and reconfigure two pre-operative/post-operative patient bays. -I mplement ADA accessibility improvements Endoscopy Department -Full demolition of the first-floor west wing to relocate and renovate the entire Endoscopy Department from the first- floor East Tower to this location. -Construct two additional appropriately sized procedure rooms, increasing the total number of procedure rooms to six. -Expand pre-operative and post-operative patient care capacity through the addition of new patient bays. -Renovate and provide support spaces including clean and soiled utility rooms, a combined high-level disinfection (HLD) area, medication room, offices, and other operational support functions. Rehabilitation Services -Full demolition of the first-floor East Tower space that Rehab will occupy to relocate them from the first-floor West Wing to this location. -Enhance Physical Therapy and Occupational Therapy treatment areas. -Expand and improve staff work areas and support functions. Public Spaces and Administrative Areas -Reconfigure and renovate the first-floor entrance, security checkpoint, information desk, patient registration areas, corridors, and waiting spaces to improve safety, circulation, and the overall patient experience. -Relocate and renovate public restrooms, the hospital sanctuary, and retail gift shop space. -Centrally locate Patient Experience, Medical Records, conference facilities, and Hospital Administration offices to promote operational efficiency, collaboration, and service delivery. Facilities Storage and Enabling Relocations -Relocate existing bed storage, facilities storage, and staff training functions to a new location yet to be determined. -Provide enabling work necessary to support future phased construction activities. Infrastructure -Replace an original hospital air handling unit located on the second floor of Tower 2 to support newly renovated and relocated program areas. -Investigation may be required for electrical, plumbing and/or utilities to determine capacity and locations. This project represents a significant investment in East Hospital's future and requires a CM partner capable of delivering innovative solutions, effective phasing strategies, and exceptional execution within an active healthcare environment. Firms with a proven track record in complex hospital renovations are encouraged to submit qualifications. Professional design services are held under a separate contract by Gensler. Areas highlighted in orange reflect the proposed renovation areas. Areas highlighted in blue indicate enabling projects that will be delivered as separate projects but may influence the overall construction phasing strategy. First Floor Fifth Floor The Program of Requirements (“POR”) has been developed as a part of this project by the Architect/Engineer (“A/E”), Gensler. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority/Owner’s policies and procedures. This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards. The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in Section 2 of the Ohio State University BIM Project Delivery Standards. Design BIM Use Case Required Additional Notes 2.3.1.1. Model Authoring – Design Intent BIMs (Required for the Architectural team and the Engineering team) X 2.3.1.2. Model Authoring – Design Intent BIMs (Required for the architectural team, preferred for the engineering team) 2.3.2. Existing Conditions Documentation/Modeling X 2.3.3. Program of Requirements (PoR) Validation X 2.3.4. Site Design 2.3.5. Model Based User Group Meetings/Reviews X 2.3.6. Sustainability (Energy Modeling/Simulation and Performance)/ Design Simulation/Analysis 2.3.7. Clash Prevention X 2.3.8 Quantity Schedule Construct BIM Use Case Required Additional Notes 2.4.1. Model Authoring – Trade Coordination BIMs X 2.4.2. Model Authoring – Shop/Fabrication BIMs X 2.4.3. Clash Detection X 2.4.4. Model-based Scheduling (Sequencing/Simulation) X 2.4.5. Model-based Estimating (Quantification/Cost Estimating) X 2.4.6. Site Analysis Planning The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in Section 4 of the Ohio State University BIM Project Delivery Standards Deliverable Required BIM Execution Plan X Design Intent BIMs X Revit Model Rule Set Results X Interim Architectural and Structural Conformed Design Intent BIMs X Project Base Point X Conformed Design Intent BIMs X Interim Asset Worksheet X Final Asset Worksheet X This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their subcontractors to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The project and construction budget as listed in this RFQ is estimated. This project is anticipated to issue design assist preconstruction contracts for MEP trades. The CM should expect to manage the scans and clash detection BIM process. The project has been approved for design and preconstruction services for all areas. This request is for Construction Manager at Risk (“CM”) to assist with preconstruction to review the schematic design concept, design development, and construction documentation. The university may amend the CM contract upon approval for bidding, construction contract administration and post-construction services. The CM should expect to manage the scans and clash detection for this project. The selected Construction Manager at Risk, as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority/Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, construction schedules and phasing; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at Construction Manager at Risk Agreements. The selected CM will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7 and 10.3.8. The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf. The project team (Owner / A/E / CM) will be required to utilize Trimble Unity Construct (TUC), (formerly ebuilder), the University’s Project Management System, for all compatible services required by the University. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the A/E and the CM. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority/Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (GMP) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, Target Value Budget/Target Value Design, phasing and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the "Basis Documents") shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the "Design Intent Statement"). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The CM will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The CM is responsible for all costs incurred related to compliance with these policies. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Phased construction in occupied hospital building 2. Endoscopy, Cath Lab and Physical/Occupational Therapy Experience 3. CMR Project Delivery experience 4. Demonstrated experience in preconstruction providing accurate estimates for all trades and budget management aligned to project priorities (TVD) 5. University and State of Ohio Administered Project experience 6. Experience with OSU Sustainably standards and processes 7. Projects delivered in a collaborative BIM-enabled environment. Note required BIM use cases. 8. Experience managing design assist partners for MEP trades. For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Construction Management Firm.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 541330
New
SLED
Ohio Stadium - HVAC Replacement
Solicitation # OSU-270103
The Ohio State University Athletics Department is soliciting professional services for project OSU-270103 to conduct a comprehensive study for the replacement of the HVAC, boiler, and chiller systems at Ohio Stadium. The current systems have reached the end of their useful life, and the selected consultant will be responsible for evaluating optimal equipment locations and delivering a detailed report, written narrative, and cost information. This planning phase, budgeted at 30,000 USD, is intended to transition into a full project; if approved by the Board of Trustees, the contract may be amended to include full AE design services. The period of performance for planning services is scheduled from November 26 through February 27. Qualified firms must demonstrate expertise in sports arena mechanical design, HVAC design capabilities, and familiarity with University Sustainability Standards. The selection process utilizes a weighted scoring matrix evaluating firm size, location, staff qualifications, and past performance. All consultants must utilize the e-Builder project management system and participate in the Encouraging Growth, Diversity & Equity (EDGE) Program, with a participation goal of 5% of the initial total planning fee. Submissions must be delivered as a single PDF not exceeding 25 MB by November 30, 2026, and must include the Statement of Qualifications Form F110-330 along with required EDGE documentation.
Engineering Services

POSTED

4 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS