Y--LMDT Dewatering Well Screen Repair Contract

Awarded
140R6026Q0046Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for the repair of Dewatering Well #1 near Leadville, Colorado, at the Leadville Mine Drainage Tunnel Water Treatment Plant, with performance required between July 1 and September 30, 2026. The work involves removing the existing pump equipment, installing a new 16-inch casing with a 316 stainless steel Johnson-type screen featuring 0.200-inch slots within the existing 20-inch casing, incorporating a dielectric coupler with specified welding procedures for dissimilar metals, conducting a post-installation video inspection, and reinstalling the pump and motor. All work must comply with Reclamation Safety and Health Standards and OSHA 29 CFR 1910/1926, and the contractor is responsible for site preparation, safety compliance, accident prevention, and coordination with Reclamation personnel. Deliverables include a video inspection report in Windows Media Player-compatible format and as-built documentation with dimensional data, both due within 30 days of completion. The contract is awarded using a Lowest Price Technically Acceptable (LPTA) methodology, where only technically acceptable offers proceed to price evaluation, and award is made to the lowest-priced responsible offeror without discussions. The estimated contract value ranges between $25,000 and $100,000. The contractor must be registered in SAM.gov with an active Unique Entity ID and must submit detailed technical proposals organized into two volumes—Technical Information and Price Quote—electronically as PDFs not exceeding 20 MB via email to the designated contracting officer by 3:00 PM MT on April 30, 2026. Mandatory requirements include providing resumes and staffing plans for key personnel, proof of insurance with minimum coverage of $100,000 workers’ compensation, $500,000 general liability, and $500,000 automobile liability, submission of up to five relevant past projects completed within the last five years, and furnishing performance and payment bonds or an irrevocable letter of credit equal to 100% of the contract value within ten days of award. All invoices must be submitted electronically through the Invoice Processing Platform (IPP), and the contractor is prohibited from using text messaging while operating government vehicles. The site is located at Station 10+25, Highway 91, Leadville, Colorado, and the Bureau of Reclamation’s Upper Colorado Regional Office in Salt Lake City

General Info

Repair Dewatering Well #1 in Leadville, CO, with new casing and screen, complete by Sept 30, 2026, firm-fixed-price, LPTA.

Contract Value

$96,000

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

UT, USA

Set-Aside

NONE

Award Issued Date

Documents

10

Amendment 0001 to Solicitation 140R6026Q0046

PDF, High priority: read this firstamendment
High

Attachment_1 LV Dewatering Well Repair PWS Final

PDF, High priority: read this firstpws
High

Solicitation 140R6026Q0046 Combined Synopsis/Request for Quotation for Well Screen Repair

PDF, High priority: read this firstrfq
High

Solicitation 140R6026Q0046 Dewatering Well Repair

PDF, High priority: read this firstifb
High

Wage Determination for Heavy Construction in Colorado - CO20260003

PDF, High priority: read this firstwage-determination
High

Leadville Dewatering Well 1 Data Sheet

XLSX, Low priorityother
Low

Reference Drawings Well 1 Drawing A

PDF, Low priorityspecifications
Low

Sources Sought Notice for Well Screens Repair - 140R6026Q0046

PDF, Low prioritysources-sought
Low

Attachment_3__Reference_Drawings_DWW1_Damage_Drawing.pdf

PDF

Attachment_5__Leadville_Plant_Dewatering_Well_Stations_Aerial_Reference.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Combined Synopsis

Notice updated

Response deadline changed from Apr 30, 2026 to May 8, 2026. The notice title changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
Contacts1 person available
OfficeSALT LAKE CITY, UT, 84138, USA
Office AddressSALT LAKE CITY, UT, 84138, USA

Full Description

Show more
The purpose for this contract is to acquire contractor services to perform dewatering well repair for one groundwater pumping well near Leadville, Colorado. The Leadville Mine Drainage Tunnel Water Treatment Plant, (Leadville treatment plant), 749 Highway 91, owned and operated by Reclamation, is located near Leadville, Colorado in Lake County.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
Federal
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
Solicitation # 140R4026R0025
Solicitation 140R4026R0025 is a total small business set-aside for the East Canal Efficiency Improvements project on the Uncompahgre Project in Delta County, Colorado. Managed by the Department of the Interior's Bureau of Reclamation, Upper Colorado Regional Office, the project has an estimated magnitude between 5 million and 10 million dollars. The scope of work involves the construction of water supply facilities, specifically the installation of approximately 170 feet of parallel 54-inch HDPE pipe for a double barrel siphon, as well as 48-inch and 42-inch polypropylene profile wall piping. Additional requirements include the construction of concrete hydraulic structures, metalwork for diversion pipeline inlets, flow measuring equipment installation, earthwork, and clearing and grubbing. Work is subject to seasonal restrictions tied to irrigation shutdown and startup dates to avoid interference with agricultural operations. The period of performance is scheduled from January 25, 2027, to November 1, 2028, with performance required to begin within 21 days of award. Proposals are due by November 20, 2026, and will be evaluated based on a best value cost/technical tradeoff process considering technical approach, construction schedule, project team composition, past performance, and price. Awardees must provide performance and payment bonds within 10 calendar days of award and maintain liability insurance for work on government installations. Invoicing must be processed through the Invoice Processing Platform (IPP). The project is governed by FAR 52.246-12 for inspection of construction, with final acceptance occurring only at the jobsite after successful installation and testing.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details
NAICS: 238210
Federal
R--CLWTP FISMA Compliance
Solicitation # 140R4026Q0108
The Department of the Interior, Bureau of Reclamation, is seeking a firm-fixed-price contract for professional technical services to bring the Navajo-Gallup Water Supply Project Cutter Lateral Water Treatment Plant SCADA system into FISMA compliance. The scope of work includes resolving information security and privacy weaknesses identified in the Plan of Action and Milestones, updating system documentation, and restoring communication links with the Navajo Tribal Utility Authority Escrito Mesa data concentrator. There is also an optional requirement for the programming and integration of the new DZ Booster Pump Station. The project requires the contractor to provide project management, a Quality Control Plan, and a Communication Plan while ensuring that critical water treatment processes remain uninterrupted. This is a sole source procurement under FAR 6.103-1 and FAR 12.201-1, with Jacobs Engineering identified as the uniquely qualified firm due to their prior design, construction, and operational knowledge of the facility. The base period of performance is from November 30, 2026, to May 30, 2028, with the optional booster plant integration scheduled from November 29, 2027, to May 30, 2028. Performance will take place in Farmington, New Mexico. Award will be based on the most advantageous offer considering price and technical capability, though technical and past performance factors are weighted as significantly less important than cost.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

9 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--Turnout Buildings
Solicitation # 140R4026B0002
Solicitation 140R4026B0002 is a sealed bid Invitation for Bid issued by the Bureau of Reclamation for the construction of potable water delivery turnout buildings and associated improvements as part of the Navajo-Gallup Water Supply Project in northwest New Mexico. The project, estimated between $18 million and $23 million, involves work at seven sites, including Sanostee, Newcomb, and Naschitti. The scope of work encompasses the installation of precast concrete buildings and foundations, buried piping, valves, fiberoptic infrastructure, and controls integration with existing SCADA systems. Additional site improvements include gravel surfacing, steel fencing, and access roads for specific locations. The period of performance is scheduled from December 16, 2026, to April 16, 2029. The contract is a small business set-aside under NAICS code 237110. Award will be granted to the responsible, compliant offeror with the lowest total bid price, calculated across seven price schedules excluding certain taxes. Key contractual requirements include strict adherence to Davis-Bacon Act wage determinations for San Juan and McKinley Counties, compliance with the Americans with Disabilities Act, and the submission of a Small Business Subcontracting Plan. The contractor is responsible for quality control and geotechnical investigations, while the government maintains quality assurance. Failure to complete the work within the specified timeframe will result in liquidated damages of $4,536.00 per calendar day. Bids are due by November 10, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 13 days
View Details
NAICS: 237110
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140R4026B0003
The Navajo Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a construction project managed by the U.S. Bureau of Reclamation, Upper Colorado Basin Region. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project is part of a larger infrastructure effort to provide municipal and industrial water to the Navajo Nation, Jicarilla Apache Nation, and the city of Gallup. The scope of work includes the construction of a pre-engineered concrete booster pump station with associated foundations, electrical equipment, and fencing; the installation of a secondary regulation tank at the Regulation Tank No. 3 site; the implementation of SCADA and radio communications systems; and site restoration involving retaining walls, swales, and regrading to prevent erosion and scour. This procurement is conducted as a small business set-aside under NAICS code 237110, with an estimated project magnitude between $10 million and $25 million. The contract will be awarded to the responsible offeror with the lowest priced bid, provided they are compliant with solicitation terms and provide a bid guarantee of at least 20 percent of the bid price. Performance and payment bonds for 100 percent of the contract price are required. The period of performance allows for a start date within 21 calendar days of award, with total completion required within 392 calendar days. The project adheres to FAR Part 14, the Davis-Bacon Act for prevailing wages, and Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS