Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Electrical Distribution System, Meck Island, U.S. Army Garrison - Kwajalein Atoll, Republic of the Marshall Islands

Active
W9128A22R0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Honolulu District plans to issue a firm-fixed price construction contract for design, construction, testing, commissioning, and turnover of an electrical distribution system on Meck Island at the U.S. Army Garrison in Kwajalein Atoll, Republic of the Marshall Islands. The current power distribution infrastructure is outdated and requires complete replacement. The project is a Design-Bid-Build solicitation, following Best Value Trade-Off procedures under FAR Part 15, with an estimated construction cost ranging from $25 million to $100 million. The solicitation will be released no sooner than 15 days after the February 11, 2022 announcement, with documents available around March 1, 2022, on the SAM website. All labor, materials, equipment, demolition, removal, and disposal necessary to replace and commission the new electrical distribution system are included, and the procurement is unrestricted. Due to COVID-19 restrictions in the Marshall Islands, no on-site pre-proposal visit will occur; instead, a pre-proposal teleconference featuring photos and work descriptions will be held. Offerers must maintain active registration in the System for Award Management (SAM) to qualify for award consideration. The solicitation falls under NAICS code 237130 and is managed by the Department of Defense office located at Fort Shafter, Hawaii. Points of contact for the project are available via email provided in the announcement.

General Info

U.S. Army Corps issues $25-$100M fixed-price contract for electrical system design and construction.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

HI, MHL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhasePresolicitation
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Honolulu
Contacts2 people available
OfficeFORT SHAFTER, HI, 96858-5440, USA
Office AddressFORT SHAFTER, HI, 96858-5440, USA
Contacts
Tracy Tenholder
Merbby Joyce Nicolas

Full Description

Show more
This announcement constitutes a Pre-Solicitation notice (synopsis) in accordance with FAR Subpart 5.2. The U.S. Army Corps of Engineers, Honolulu District hereby announces its intent to issue a solicitation entitled, "Electrical Distribution System, Meck Island, U.S. Army Garrison - Kwajalein Atoll, Republic of the Marshall Islands" as described within this announcement. This project is a Design-Bid-Build solicitation, utilizing Best Value Trade-Off procedures prescribed at FAR Part 15. The Government intends to issue a formal solicitation via a Request for Proposal (RFP) in accordance with FAR Part 15, which will take place no sooner than 15 days from the publication of this announcement. Solicitation plans and specifications will be made available for viewing and/or downloading on the SAM website located at https://www.sam.gov/ on or about March 1, 2022. It is the Offerer's responsibility to check for any posted changes to the solicitation. The North American Industry Classification Code (NAICS) for this requirement is 237130 (Power and Communication Line and Related Structures Construction), with a size standard of $39,500,000. The Government intends to award a firm-fixed price construction contract as a result of this solicitation. Project Description: Power is currently distributed to the island from the building 85020 main switchgear at 4,160 V via underground feeders. Much of the existing distribution infrastructure and electrical equipment are at end of life and in need of replacement. This project includes all labor, materials, and equipment required to construct and commission the new system and demolish, remove, and dispose existing facilities and equipment as indicated in the contract documents. This firm-fixed price, design-bid-build (DBB) project includes all work required to procure, construct, test, commission, and turn over to operations the Meck Island distribution system. This acquisition is proceeding as unrestricted. Estimated magnitude of the construction project is between $25,000,000 and $100,000,000. A pre-proposal site visit will not be held due to current Republic of the Marshall Islands COVID-19 travel restrictions/quarantine requirements. However, a pre-proposal teleconference will be held to provide photos/descriptions of the work. It is the Offerers' responsibility to check for any posted changes to the solicitation. Solicitation documents will not be issued on compact disc (CD) unless the Government determines that it is necessary. Offerers must have and/or maintain an active registration with the System for Award Management (SAM) website to be eligible for a Government contract award. To register in SAM, go to https://www.sam.gov.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 12 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 13 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 18 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → W2SN Endist Honolulu

Same awarding agency

NAICS: 236220
New
Federal
$495M Small Business Multiple Award Task Order Contract for Design-Build and Design Bid-Build Construction Services for the State of Hawaii, U.S. Army Corps of Engineers, Honolulu District
Solicitation # W9128A26RA007
The U.S. Army Corps of Engineers, Honolulu District, is soliciting a 100% Small Business Set-Aside Multiple Award Task Order Contract (MATOC) for Design-Build and Design-Bid-Build construction services across the State of Hawaii. This Indefinite Delivery, Indefinite Quantity (IDIQ) vehicle has a total cumulative capacity not to exceed 495 million dollars, with individual firm-fixed-price task orders estimated to range from 2,000 dollars to 35 million dollars. The contract consists of a five-year base period with one six-month option to extend. The scope of work encompasses general construction, including electrical and instrumentation, structural efforts, demolition, site restoration, and safety remediation such as asbestos and lead-based paint abatement. The government intends to award five to seven contracts using a two-phase best value trade-off selection process. Phase 1 evaluates offerors based on past performance, organization and management, and a go/no-go bonding requirement. Phase 2 focuses on a seed project involving a construction narrative, drawings, a schedule, and price. Once the MATOC is established, task orders will be awarded based on criteria including price, schedule, technical solutions, and innovation. Performance requires adherence to Davis-Bacon Act labor standards, Buy American requirements, and strict quality control plans, with final acceptance contingent upon a multi-stage government inspection process. Proposals must be submitted via the Procurement Integrated Enterprise Environment (PIEE) in searchable PDF format.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 2 months
View Details
NAICS: 236220
Federal
FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, Hawaii
Solicitation # W9128A279A001
The U.S. Army Corps of Engineers is seeking a qualified partner for the design and construction of a Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center in Oahu, Hawaii. This project is intended to partially mitigate a parking shortfall of 2,161 spaces and will be executed using a Progressive Design-Build approach under Other Transaction Authority. The scope of work encompasses the full design and construction of the facility, including comprehensive site improvements such as grading, utilities, storm drainage, roadway connections, pedestrian sidewalks, landscaping, and exterior lighting. The resulting facility must be designed for a minimum lifespan of 40 years and adhere to DoD Unified Facilities Criteria regarding energy efficiency, building envelope, and integrated systems performance. The acquisition will utilize a streamlined two-step competitive selection process. In the first step, interested offerors will submit a Statement of Qualifications in the form of a White Paper, from which the government intends to down-select three of the best-qualified offerors. These selected firms will then be invited to provide Pitch Presentations as the final evaluation phase. The resulting agreement will be Firm-Fixed-Price, with costs for successive design and construction milestones agreed upon as the design progresses. The project is divided into two phases: the first focusing on design and pre-construction services, and the second covering final design and construction. An Industry Day is scheduled for November 17, 2026, with a target award date anticipated between April and May 2027.
Commercial and Institutional Building Construction

POSTED

14 days ago

DEADLINE

in 15 days
View Details
NAICS: 531120
Federal
Military Recruiting Lease for office space 5,300 to 5,800 SF required
Solicitation # DACA455270014200
The U.S. Army Corps of Engineers, Honolulu District, is soliciting proposals for a full-service, turnkey lease of 5,300 to 5,800 gross rentable square feet of office space for Armed Forces Recruiting purposes in Honolulu, Hawaii. The required space must be located within a delineated area bounded by River Street to the north, Ward Avenue to the south, Ala Moana Boulevard to the east, and South Vinyard Boulevard to the west. The lease term is four years and eleven months, with the government maintaining termination rights. Key facility requirements include 24-hour unrestricted access, comprehensive communications infrastructure, a secondary exterior exit, and lighted parking for approximately twelve government vehicles, with additional private vehicle parking available within a four-block radius. The award will be based on the best value, weighing price and technical factors, such as location and neighborhood quality, equally. All construction and safety enhancements must be treated as tenant improvements with no government reimbursement. The lessor is responsible for all operating costs, real estate taxes, and insurance, including a public liability limit of at least 1 million dollars. Compliance with ADA/ABAAS accessibility standards and specific seismic safety objectives is mandatory. Interested offerors must be registered in the System for Award Management and submit their electronic proposals to the designated point of contact by November 15, 2026.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

24 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS